General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
KTA #7129
This project on KTA (I-35) in Chase County is for improvement of the acceleration and deceleration ramps at the Matfield Green service area at MM 97 and mill and Superpave overlay from MM 96.3 to MM 112.3, including portions of the Matfield Green service area parking lot. Also two median crossovers at MM 93-95 will be constructed for future bridge rehabilitation. This project includes grading, surfacing, milling, shoulder seal and all other work shown in the plans.
12/12/2017 08:00 PM UTC
KTA #7137
Re-deck and Raise Br. No’s. 168.927 (85th St. over I-335) and 169.627 (93rd St. over I-335).
12/12/2017 08:00 PM UTC
KTA #7166
This project on KTA (I-35) in Sumner County is for repairs below northbound and southbound mainline bridges at MM 26.815. It includes constructing a scour protection pad, placing riprap slope protection and all other work shown in the plans.
11/14/2017 08:00 PM UTC
KTA #7171
This work will include Reconstruction of the East Topeka Toll Plaza at KTA/I-70 MM 183 to convert to Open Road Tolling (ORT), removal of the existing and construction of a new Toll Plaza Administration Building, widening of Bridge No. 183.657, EB I-70 over WB I-470 and all other work shown in the plans.
09/20/2017 07:00 PM UTC
KTA #7082
Asphalt overlay of driving lanes and shoulders northbound and southbound along McDonald Drive from the Kansas Turnpike Authority West Lawrence Toll Plaza, (MM 202), south to the intersection with Iowa and 6th Street.
05/18/2017 07:00 PM UTC
KTA #7054
This project is for construction of northbound and southbound mainline RCSH bridges (54’-72’-54’) at MM 0.600 and removal of the existing 3-14’x7’ RFB. It includes bridges, grading, aggregate base construction, HMA base and surface, permanent concrete safety barrier and all other work shown in the plans.
04/18/2017 07:05 PM UTC
KTA #7058
This work will include ramp improvements at El Dorado South interchange at MM 71 and Type B UBAS overlay from MM 50.8 to 71.3.
02/21/2017 08:00 PM UTC
KTA #7078
Reconstruction of the Eastern Terminal Plaza at KTA/I-70 MM 216 to convert to Open Road Tolling (ORT). Reconstruction of 188th St. bridge and construction of a new 182nd St. bridge crossing I-70.
02/21/2017 08:00 PM UTC
KTA #7108
This work will include Permanent Seeding, and all other work shown in the plans.
02/07/2017 08:00 PM UTC
KTA #7026
South Topeka Interchange & Ramp Improvements Bridge Re-deck & Widening Br. No. 177.337N & 177.337S
01/31/2017 08:00 PM UTC
81 - 90 of 93 Solicitations
1 2 3 4 5 6 7 9