General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
KTA #7884
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 56.4, 60.6, 68.1, & 73.4). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7885
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 43.1, 86.6, 95.8, & 122.9). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7886
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 187.4, 191.2, 200.6, & 202.4). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7887
Fabrication and delivery of sixteen (16) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 131.1, 146, 150.6, 179.3, 206.6 & 210.1). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7876
Painting Structural Steel for the following Bridges: Br. 86.637, Br. 99.590, Br. 101.730, Br. 102.260, Br. 122.590, Br. 148.590, Br. 158.963, and Br. 169.627.
10/20/2021 07:00 PM UTC
KTA #7742
This work will include re-decking and widening of northbound and southbound mainline bridges at MM 41.437, 42.445 & 42.850 as well as construction of mainline cashless toll facilities at MM 43.080.
10/19/2021 07:00 PM UTC
KTA #7874
This work will include fabrication and delivery of fifty-two (52) Overhead Sign Structures (Aluminum). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
09/21/2021 03:00 PM UTC
KTA #7808
This work will include: Drainage work at KTA milepost 219.85. There is an existing 6’1” x 8’10” Steel Plate Pipe Arch that is in need of repair. This work will be to place an adjacent 164’ of 72”Jacked Pipe parallel to the east of the existing pipe using the same flowline. Then to line and grout the existing pipe with 164’ of 48” x 76” Elliptical Concrete Pipe. Small amount of earthwork just for cleaning up the area.
06/15/2021 07:00 PM UTC
KTA #7788
This project is the civil construction work for cashless tolling sites on I-35 (KTA) in Sumner and Sedgwick County MM 21.16, MM 30.52, MM 36.43, MM 39.50, MM 47.00 & MM 50.01.
05/18/2021 07:00 PM UTC
KTA #7668
This work will include Re-deck and Raise Br. No’s. 171.347 (Wannamaker Road over I-335) and 172.477 (69th St. over I-335). Extend RCB at MM 172.1. Extend RCP at MM 172.6.
04/13/2021 07:00 PM UTC
41 - 50 of 93 Solicitations
1 2 3 5 7 8 9 10