Upcoming Solicitations

Number Deadline
Tertiary Filter Upgrade - Water Reclamation Facility - RFQ
The City of Marysville is requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations for the construction of the following Project, and for related pre-construction and procurement CMAR services: Tertiary Filter Upgrade – Water Reclamation Facility 50225-001 Statements of Qualifications demonstrating qualifications and ability to provide CMAR services and construct the Project shall be submitted to Cory Smith, Wastewater Superintendent via email to csmith@marysvilleohio.org until April 17, 2026 at 9:00 A.M. After that time, Marysville will no longer accept Statements of Qualifications. The CMAR Contract will include the following services and Work: • Construction Manager at Risk services including public sector construction, specifically at a wastewater treatment facility and procurement services seeking qualified construction subcontractors for specified Work packages. • Preconstruction services including, but not limited to, scheduling, cost estimating, constructability review, preliminary and final Guaranteed Maximum Price (GMP) development and open book pricing. Owner anticipates that the CMAR’s Contract Price will be approximately $3,000,000 with a range from $2,000,000 to $4,500,000 (Class IV estimated). The Project is anticipated to be fully funded using City Wastewater Funds with the CMAR pre-construction services and budgetary Contract Price included in the 2026-2027 fiscal year budget. The CMAR Contract has an expected start date September 2026 and duration for construction of 15 months. Project information and Proposal Documents for the CMAR Contract can be found on Bid Express (www.bidexpress.com). Questions about the Project should be posted on Bid Express. Selection of the Construction Manager at Risk will be made using a two-step process. • Step One: Owner will receive Statements of Qualifications. • Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner’s consideration.
04/17/2026 01:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
City of Marysville 2019 Water Treatment Chemicals - Chlorine
The work consists of providing Chlorine in 150 lb cylinders (estimated quantity is 50,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Hydroflouricillic Acid
The work consists of providing Hydroflouricillic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
Plum Street Improvements
The project consists of the installation of the following: -Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic -Storm Sewer: A 50 foot long 16’x 5’ box culvert -Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better. The Engineer's Estimate for this project is $807,981.63
07/16/2018 07:41 PM UTC
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following: - The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations - This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic. - The Engineer's Estimate for this project is $279,800.00.
06/25/2018 05:30 PM UTC
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following: -Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. -Maintenance of Traffic and the associated detour signage will be handled by separate contract.
05/15/2018 05:30 PM UTC
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following: - Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path - Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins - Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation - Waterline – 320 feet of 12” waterline and the associated appurtenances - Landscaping – 136 trees and seeding and mulching
05/07/2018 05:30 PM UTC
33 Innovation Park Development Signage
The project consists of the installation of the following: - One (1) 33 Innovation Park Development Sign (including the sign structure) along US 33. - One (1) 33 Innovation Park Development Sign (including the sign structure) along Industrial Parkway. - Associated electric work to provide lighting to each sign. - Necessary grading to achieve the desired elevation of each sign. Per the Bid Documents, Alternate Bids for the sign(s) materials (columns and bases) may be considered.
04/02/2018 05:30 PM UTC
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following: • Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet • Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet • Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
03/14/2018 07:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
03/02/2018 07:00 PM UTC