General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year. The ESTIMATED quantities are: Carbon Dioxide (CO2) - 600,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring. The ESTIMATED quantities are: Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
City of Marysville Dunham Water Tower Painting
The Dunham Water Tower Painting project consists of the following: - Installation of a flap gate on the overflow pipe. - Replacing the roof vent. - Secure overflow pipe to lower leg of tower - Installation of an internal balcony in the bowl. - Pit welding. - Replacing the aviation lights. - Abrasive blast cleaning and repainting the interior. - Abrasive blast cleaning and repainting the exterior with containment. - Applying City logo as directed.
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Chlorine
The work consists of providing Chlorine in 150 lb cylinders (estimated quantity is 50,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Hydroflouricillic Acid
The work consists of providing Hydroflouricillic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
Plum Street Improvements
The project consists of the installation of the following: -Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic -Storm Sewer: A 50 foot long 16’x 5’ box culvert -Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better. The Engineer's Estimate for this project is $807,981.63
07/16/2018 07:41 PM UTC
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following: - The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations - This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic. - The Engineer's Estimate for this project is $279,800.00.
06/25/2018 05:30 PM UTC
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following: -Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. -Maintenance of Traffic and the associated detour signage will be handled by separate contract.
05/15/2018 05:30 PM UTC
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following: - Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path - Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins - Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation - Waterline – 320 feet of 12” waterline and the associated appurtenances - Landscaping – 136 trees and seeding and mulching
05/07/2018 05:30 PM UTC
121 - 130 of 141 Solicitations
1 2 … 7 8 9 10 11 13 15