General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF IFB D23056 FIDC
UAF Fire Station 12 Dormitory The Work consists of building an addition that provides five additional sleeping units and associated kitchen, day room, and training spaces at University Fire Station 12 located at 1950 University Ave. S. in Fairbanks, Alaska. Additive alternates exist to build an apparatus bay to house additional equipment in conditioned space and to improve the exterior of the fire station with new signage, a new entry vestibule, and a covered patio for firefighter use. Construction Range: $1,000,000 - $5,000,000
05/08/2025 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
UAF IFB D22121 CTCBR
CTC Aviation Hangar Bi-Fold Door Replacement The work consists of replacing a structural steel door header and bi-fold hangar door at the UAF CTC Aviation Hangar located at Fairbanks International Airport. Construction Range: $100,000 - $500,000
01/05/2023 11:00 PM UTC
UAF RFP D18068 BHPR
Bartlett and Moore Hall Modernization and Renewal The University of Alaska Fairbanks is seeking proposals from companies qualified and interested in providing Construction Manager at Risk services. The project scope affects all levels of Bartlett Hall and Moore Hall. Degraded restroom wall, floor and ceiling finishes will be removed to provide access to concealed plumbing and will be replaced with durable and low maintenance finishes. All horizontal copper plumbing and vertical cast iron stacks will be removed and replaced. Toilet partitions, bathroom and shower accessories and plumbing fixtures will be replaced. Mechanical ventilation systems will be repaired or replaced where required. Lighting throughout each building will be upgraded to energy efficient LEDs. Asbestos, lead based paints and any other hazardous materials will be surveyed, documented and abated where necessary. Sleeping quarters, lounges, laundries and other public spaces will also be renovated. Space in Hess Commons will be converted into ADA compliant restrooms. Construction Range: Over $5,000,000
10/19/2022 01:00 AM UTC
UAF IFB D22073 BUDC
Butrovich Data Center Chiller Replacement The Work consists of replacing the Butrovich Data Center chilled water condensers and circulator pumps. Work will be performed during winter so that the existing dry coolers to remain can carry the cooling load of the Data Center during construction. Construction Range: $1,000,000 - $1,500,000
10/04/2022 10:00 PM UTC
UAF IFB D22013 HSCR
Student Health and Counseling Center Renovations-Phase1 The Work consists of major interior demolition, asbestos abatement, and the construction of new framed walls, ceilings, doors, and finishes. Lighting will be converted from fluorescent to LED fixtures. Mechanical and plumbing will be modified as required to support the new room layouts. Construction Range: $500,000 - $1,000,000
09/21/2022 10:00 PM UTC
UAF IFB D22099 FASC1
Fine Arts Salisbury Theater Code Corrections Phase 1 The Work consists of code corrections within the Salisbury Theater. Work will include updated construction of walls, doors, frames, hardware, and finishes; structural framing and curbs for roof top smoke vents; emergency lighting and alarm system upgrades, fire suppression modifications, as well as fire stopping seals and dampers. Construction Range: $500,000 - $1,000,000
07/29/2022 10:00 PM UTC
UAF IFB D22016 OBRR2
O’Neill Roof Replacement The Work consists of the replacement of the O’Neill roof system with a 60-mil EPDM roof system. Work will require coordinated outages and temporary relocation of roof-mounted equipment, rerouting of penetrations through the roof, addition of an overflow rainleader system, and modifications to the existing stack guy wire supports. Construction Range: $750,000 - $1,500,000
06/10/2022 10:00 PM UTC
UAF RFP D22109 CWFST
Campus Wide Fire Suppression Inspection Term Contract The University of Alaska Fairbanks (UAF) is seeking Proposals from Contractors qualified and interested in providing general fire suppression system inspection, maintenance, and repairs at all UAF’s campuses and remote sites. Contracts will be awarded to create a pool of three (3) service term contractors to perform general fire suppression inspections, testing, and repair work of a reoccurring nature with delivery, scheduled and quantities indefinite.
05/17/2022 01:00 AM UTC
UAF IFB D21094 WCSW
Wood Center Subgrade Waterproofing The Work consists of demolition of concrete sidewalks and stairs, installation of a waterproofing membrane, and reconstruction of pathways along the north and northwest side of the Wood Center. Additive Alternate Work will raise the elevation of the concrete alleyway and associated ADA ramp into the lower level of the Wood Center. Construction Range: $0 - $1,000,000
05/03/2022 10:00 PM UTC
UAF IFB D22001 WKWD
Wickersham Hall Renewal and Water Damage Repairs The Work and associated costs will be separated into two bid line items. Base Bid 1 will address water damage repairs including removal and replacement of affected flooring and ceilings; patch and paint affected walls and ceilings; removal and reinstallation of affected wall and ceiling mounted devices. Base Bid 2 will address facility improvements including architectural, mechanical and electrical throughout the remainder of Wickersham Hall. Construction Range: $1,000,000 - $5,000,000
04/28/2022 10:00 PM UTC
UAF IFB D21098 SRCBR
SRC Basketball Hoop Replacements The Work consists of installing wall-mounted, power-operated, basketball backstops and gymnasium wall padding at the western court in the Student Recreation Center (SRC), with additive alternates to include additional courts. Work includes structural modifications and electrical work. Construction Range: $100,000 - $500,000
04/19/2022 10:00 PM UTC
31 - 40 of 71 Solicitations
1 2 4 6 7 8