General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF IFB D23056 FIDC
UAF Fire Station 12 Dormitory The Work consists of building an addition that provides five additional sleeping units and associated kitchen, day room, and training spaces at University Fire Station 12 located at 1950 University Ave. S. in Fairbanks, Alaska. Additive alternates exist to build an apparatus bay to house additional equipment in conditioned space and to improve the exterior of the fire station with new signage, a new entry vestibule, and a covered patio for firefighter use. Construction Range: $1,000,000 - $5,000,000
05/08/2025 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
UAF IFB D21029 BNME
Bunnell Elevator Modernization The Work consists of demolishing the existing elevator, hydraulic jack, controller, tank, and pump assembly, and installing a new machine-roomless (MRL) elevator with a digital controller, traveling cable, car, and finishes. Work also consists of adding a roof bump out to accommodate machinery at the top of the hoistway, and relocating fire alarm devices in the hoistway. Construction Range: $100,000 - $500,000
01/04/2022 11:00 PM UTC
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying locker room spaces in the Patty Center. Tasks will include demolition, new architectural finishes, plus mechanical, plumbing and electrical modifications. Construction Range: $100,000 - $500,000
12/20/2021 11:00 PM UTC
UAF IFB D20066 CWLL
Campus Wide Lathrop and Lola Tilly Cooling The Work consists of installing whole building comfort cooling systems in the Lola Tilly and Lathrop Hall buildings. Work includes installation of direct expansion and chilled water systems integrated into existing duct work and the installation of split system AC units. Construction Range: $500,000 - $1,000,000
11/11/2021 11:00 PM UTC
UAF RFP D20087 RLSS
Rasmuson Library Student Success Center The scope of work for this project will be to provide professional services to develop programming and preliminary design through contract documents for a new Student Academic Success Center.
10/08/2021 01:00 AM UTC
UAF IFB D20052 SKEM
Skarland Hall Elevator Modernization The Work consists of modernizing and upgrading the existing elevator which will include demolishing the existing elevator hydraulic jack, controller, tank, and pump assembly. A new machine roomless (MRL) elevator will be installed with digital controller, traveling cable, car, and finishes. A new elevator pit sump pump will be installed, and smoke doors will be provided at all levels except the primary floor. Door magnets will be provided for smoke doors, and fire alarm devices will be relocated in the hoistway. Construction Range: $100,000 to $500,000
09/22/2021 10:00 PM UTC
UAF IFB D19080 MSCER
MEFEC Campus Earthquake Repairs The work consists of repairing finishes damaged by the earthquake at multiple buildings at the Matanuska Experiment Farm and Extension Center in Palmer, Alaska. Construction Range: $100,000 - $500,000
08/19/2021 10:00 PM UTC
UAF IFB D21056 MBSMV
MBS Complex Medium Voltage Feeder Replacement The Work consists of replacement of existing 4160 volt feeder to the MBS Complex with a new 12470 volt feeder including new primary and secondary transformers, distribution panels, cables, and metering. Construction Range: $500,000 - $1,000,000
08/17/2021 10:00 PM UTC
UAF IFB D19162 BBCEI
Bristol Bay Campus Exterior Improvements The Work consists of exterior improvements to the Bristol Bay Campus Applied Sciences Building in Dillingham, Alaska. The work items include installing a new building foundation drainage system, a sidewalk snowmelt system and creating ADA complaint walkway to the building. Construction Range: $100,000 - $500,000
07/07/2021 10:00 PM UTC
UAF IFB D19080 MSCER
MEFEC Campus Earthquake Repairs The Work consists of repairing finishes damaged by the earthquake at multiple buildings at the Matanuska Experiment Farm and Extension Center. Construction Range: $100,000 - $500,000
06/29/2021 10:00 PM UTC
UAF IFB D19001 NWRBR
The Work consists of replacing major sections of the boardwalk with a new boardwalk using a driven pile foundation. Utilities will be temporarily supported until the new boardwalk is installed. Construction Range: $100,000 - $500,000
06/22/2021 10:00 PM UTC
51 - 60 of 71 Solicitations
1 2 3 4 6 8