General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF IFB D23012 PPSG
Physical Plant Standby Generator The work includes provision and installation of a 250 kW diesel engine generator module on a concrete pad and connection to the existing Physical Plant building electrical system via an automatic transfer switch. Construction Range: $100,000 - $500,000
05/02/2024 10:00 PM UTC
UAF IFB D23034 LSBE2
Large Animal Holding Facility Improvements The Work consists of improving the existing large animal holding structure at the University of Alaska Fairbanks Troth Yeddha’ Campus Large Animal Research Station in Fairbanks, Alaska, by modifying and installing interior cages; building new exterior enrichment pens; building new secondary containment perimeter fencing; and reorienting existing ATCO, water, power, and data systems. Construction Range: $200,000 - $400,000
05/07/2024 10:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
UAF IFB D21050 PLHB1
Parking Lot Headbolt Replacement Phase 1 The Work consists of replacing the headbolt outlet system for the Bunnell Parking Lot (3G). All existing headbolt posts will be demolished and replaced with new precast concrete posts. The transformer and switchboard for the west half of the lot will be demolished. The transformer for the east half of the lot will be relocated, and a new 12,470V primary feeder will be installed from the utilidor blister. A new owner furnished, contractor installed switchboard will be installed to serve new branch circuit panels. Construction Range: $100,000 - $500,000
06/10/2021 10:00 PM UTC
UAF IFB D21062 ELSC
Elvey Deferred Maintenance‐South Entry Canopy The  Work  consists  of installation  of  a  non‐combustible  canopy  at  the  Elvey  building  south  entrance.  Work includes demolition of the concrete topping slab. New construction includes steel framing, steel stud parapet framing, non‐insulated roof assembly, sheet metal flashings, metal soffit and siding panels, exterior lighting, concrete topping slab, and signage. Construction Range: $100,000 - $500,000
06/03/2021 10:00 PM UTC
UAF IFB D21007 CWSE21
Campus Wide Sidewalk Renovations FY21 The Work consists of to repair and replace broken sidewalks and pedestrian pathways in the Cornerstone Plaza between the Rasmuson Library and the Bunnell Building. Construction Range: $100,000 - $500,000
05/18/2021 10:00 PM UTC
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying existing spaces in the Patty Center to create new office space and additional locker rooms. Tasks will include demolition, new architectural finishes, and mechanical, plumbing and electrical modifications.
04/30/2021 10:00 PM UTC
UAF IFB D20083 MBSFU3
MBS Complex Fire Alarm Upgrades Phase 3 The Work consists of upgrading the smoke control system to current code requirements. Infill existing smoke shaft louvers and roof hatch. Provide smoke doors in all elevator lobbies except the primary floor. Doors will be held open with door magnets that will release in a fire alarm event.
04/13/2021 10:00 PM UTC
UAF IFB D21068 CUWR3
Cutler Apartments Window Replacement Phase 3 The Work consists of replacing the existing wood framed windows with triple‐pane low‐E vinyl windows with solid‐surface sills and metal blinds at the Cutler 300 and 600 apartment blocks.
03/31/2021 10:00 PM UTC
UAF IFB D19107 CWNS
Campus Wide Sustainable Native Art Studios Renovation The Work consists of the renovation of Room 301 of the Fine Arts Building. Renovations include architectural, mechanical and electrical upgrades to improve the use of the space.
02/25/2021 11:00 PM UTC
UAF IFB D20090 ASFR
Alaska Satellite Facility Generator Replacement The Work consists of the installation of a new 300kW/375kVA, 480-volt diesel engine generator to replace of the current 200kW unit. The work will include a new automatic transfer switch and associated relays, controls, louver actuators, and fuel tank
02/24/2021 11:00 PM UTC
UAF IFB D20074 FAFC
Fine Arts Salisbury Theater Fire Curtain The Work consists of demolishing and replacing an asbestos laden fire curtain, and select system components and connecting new fire curtain to the existing fire alarm system.
01/19/2021 11:00 PM UTC
UAF IFB D19133 ELDMCW
Elvey Deferred Maintenance Curtain Wall Repair The Work consists of selective demolition of the Elvey building envelope. Building envelope will be modified and built back to redirect curtain wall drainage to shed to exterior. Work includes abatement, spray-applied fire proofing, framing, interior and exterior finishes.
01/07/2021 11:00 PM UTC
51 - 60 of 61 Solicitations
1 2 3 4 6