General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF IFB D22122 SDR22
The Work consists of concrete and welding repair work to the existing dock along with an additive alternate for dolphin anodes. Construction Range: $100,000 - $500,000
12/19/2023 11:00 PM UTC
UAF RFP D22087 MUPAD
Museum Planetarium Addition The University of Alaska Fairbanks is seeking proposals from companies qualified and interested in providing Construction Manager at Risk services. The scope of work for this project is to construct a 5500 gross square feet (gsf) addition to the University of Alaska Museum of the North (UAMN) to house a 60-70 seat planetarium with a 10-meter dome. The addition will be located to the west of the current museum building, with connectivity to the existing space. Design elements and aesthetics on the exterior will be complimentary with the existing architecture while interior spaces will be designed to modern standards for a state-of-the-art planetarium. Construction range: Over $5,000,000
01/05/2024 02:00 AM UTC
2 Solicitations

Closed Solicitations

Number Deadline
UAF IFB D19080 MSCER
MEFEC Campus Earthquake Repairs The Work consists of repairing finishes damaged by the earthquake at multiple buildings at the Matanuska Experiment Farm and Extension Center. Construction Range: $100,000 - $500,000
06/29/2021 10:00 PM UTC
UAF IFB D19001 NWRBR
The Work consists of replacing major sections of the boardwalk with a new boardwalk using a driven pile foundation. Utilities will be temporarily supported until the new boardwalk is installed. Construction Range: $100,000 - $500,000
06/22/2021 10:00 PM UTC
UAF IFB D21050 PLHB1
Parking Lot Headbolt Replacement Phase 1 The Work consists of replacing the headbolt outlet system for the Bunnell Parking Lot (3G). All existing headbolt posts will be demolished and replaced with new precast concrete posts. The transformer and switchboard for the west half of the lot will be demolished. The transformer for the east half of the lot will be relocated, and a new 12,470V primary feeder will be installed from the utilidor blister. A new owner furnished, contractor installed switchboard will be installed to serve new branch circuit panels. Construction Range: $100,000 - $500,000
06/10/2021 10:00 PM UTC
UAF IFB D21062 ELSC
Elvey Deferred Maintenance‐South Entry Canopy The  Work  consists  of installation  of  a  non‐combustible  canopy  at  the  Elvey  building  south  entrance.  Work includes demolition of the concrete topping slab. New construction includes steel framing, steel stud parapet framing, non‐insulated roof assembly, sheet metal flashings, metal soffit and siding panels, exterior lighting, concrete topping slab, and signage. Construction Range: $100,000 - $500,000
06/03/2021 10:00 PM UTC
UAF IFB D21007 CWSE21
Campus Wide Sidewalk Renovations FY21 The Work consists of to repair and replace broken sidewalks and pedestrian pathways in the Cornerstone Plaza between the Rasmuson Library and the Bunnell Building. Construction Range: $100,000 - $500,000
05/18/2021 10:00 PM UTC
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying existing spaces in the Patty Center to create new office space and additional locker rooms. Tasks will include demolition, new architectural finishes, and mechanical, plumbing and electrical modifications.
04/30/2021 10:00 PM UTC
UAF IFB D20083 MBSFU3
MBS Complex Fire Alarm Upgrades Phase 3 The Work consists of upgrading the smoke control system to current code requirements. Infill existing smoke shaft louvers and roof hatch. Provide smoke doors in all elevator lobbies except the primary floor. Doors will be held open with door magnets that will release in a fire alarm event.
04/13/2021 10:00 PM UTC
UAF IFB D21068 CUWR3
Cutler Apartments Window Replacement Phase 3 The Work consists of replacing the existing wood framed windows with triple‐pane low‐E vinyl windows with solid‐surface sills and metal blinds at the Cutler 300 and 600 apartment blocks.
03/31/2021 10:00 PM UTC
UAF IFB D19107 CWNS
Campus Wide Sustainable Native Art Studios Renovation The Work consists of the renovation of Room 301 of the Fine Arts Building. Renovations include architectural, mechanical and electrical upgrades to improve the use of the space.
02/25/2021 11:00 PM UTC
UAF IFB D20090 ASFR
Alaska Satellite Facility Generator Replacement The Work consists of the installation of a new 300kW/375kVA, 480-volt diesel engine generator to replace of the current 200kW unit. The work will include a new automatic transfer switch and associated relays, controls, louver actuators, and fuel tank
02/24/2021 11:00 PM UTC
41 - 50 of 53 Solicitations
1 2 3 5