General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF RFP D24045 UPCC
University Park Nanook Child Care The Work consists of, but is not limited to providing professional services to develop programming and preliminary design through construction documents and construction administration for the renovation of the south wing of the University Park Building into a childcare facility.
04/24/2024 01:00 AM UTC
UAF IFB D23012 PPSG
Physical Plant Standby Generator The work includes provision and installation of a 250 kW diesel engine generator module on a concrete pad and connection to the existing Physical Plant building electrical system via an automatic transfer switch. Construction Range: $100,000 - $500,000
05/02/2024 10:00 PM UTC
UAF IFB D23034 LSBE2
Large Animal Holding Facility Improvements The Work consists of improving the existing large animal holding structure at the University of Alaska Fairbanks Troth Yeddha’ Campus Large Animal Research Station in Fairbanks, Alaska, by modifying and installing interior cages; building new exterior enrichment pens; building new secondary containment perimeter fencing; and reorienting existing ATCO, water, power, and data systems. Construction Range: $200,000 - $400,000
05/07/2024 10:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying locker room spaces in the Patty Center. Tasks will include demolition, new architectural finishes, plus mechanical, plumbing and electrical modifications. Construction Range: $100,000 - $500,000
12/20/2021 11:00 PM UTC
UAF IFB D20066 CWLL
Campus Wide Lathrop and Lola Tilly Cooling The Work consists of installing whole building comfort cooling systems in the Lola Tilly and Lathrop Hall buildings. Work includes installation of direct expansion and chilled water systems integrated into existing duct work and the installation of split system AC units. Construction Range: $500,000 - $1,000,000
11/11/2021 11:00 PM UTC
UAF RFP D20087 RLSS
Rasmuson Library Student Success Center The scope of work for this project will be to provide professional services to develop programming and preliminary design through contract documents for a new Student Academic Success Center.
10/08/2021 01:00 AM UTC
UAF IFB D20052 SKEM
Skarland Hall Elevator Modernization The Work consists of modernizing and upgrading the existing elevator which will include demolishing the existing elevator hydraulic jack, controller, tank, and pump assembly. A new machine roomless (MRL) elevator will be installed with digital controller, traveling cable, car, and finishes. A new elevator pit sump pump will be installed, and smoke doors will be provided at all levels except the primary floor. Door magnets will be provided for smoke doors, and fire alarm devices will be relocated in the hoistway. Construction Range: $100,000 to $500,000
09/22/2021 10:00 PM UTC
UAF IFB D19080 MSCER
MEFEC Campus Earthquake Repairs The work consists of repairing finishes damaged by the earthquake at multiple buildings at the Matanuska Experiment Farm and Extension Center in Palmer, Alaska. Construction Range: $100,000 - $500,000
08/19/2021 10:00 PM UTC
UAF IFB D21056 MBSMV
MBS Complex Medium Voltage Feeder Replacement The Work consists of replacement of existing 4160 volt feeder to the MBS Complex with a new 12470 volt feeder including new primary and secondary transformers, distribution panels, cables, and metering. Construction Range: $500,000 - $1,000,000
08/17/2021 10:00 PM UTC
UAF IFB D19162 BBCEI
Bristol Bay Campus Exterior Improvements The Work consists of exterior improvements to the Bristol Bay Campus Applied Sciences Building in Dillingham, Alaska. The work items include installing a new building foundation drainage system, a sidewalk snowmelt system and creating ADA complaint walkway to the building. Construction Range: $100,000 - $500,000
07/07/2021 10:00 PM UTC
UAF IFB D19080 MSCER
MEFEC Campus Earthquake Repairs The Work consists of repairing finishes damaged by the earthquake at multiple buildings at the Matanuska Experiment Farm and Extension Center. Construction Range: $100,000 - $500,000
06/29/2021 10:00 PM UTC
UAF IFB D19001 NWRBR
The Work consists of replacing major sections of the boardwalk with a new boardwalk using a driven pile foundation. Utilities will be temporarily supported until the new boardwalk is installed. Construction Range: $100,000 - $500,000
06/22/2021 10:00 PM UTC
UAF IFB D21050 PLHB1
Parking Lot Headbolt Replacement Phase 1 The Work consists of replacing the headbolt outlet system for the Bunnell Parking Lot (3G). All existing headbolt posts will be demolished and replaced with new precast concrete posts. The transformer and switchboard for the west half of the lot will be demolished. The transformer for the east half of the lot will be relocated, and a new 12,470V primary feeder will be installed from the utilidor blister. A new owner furnished, contractor installed switchboard will be installed to serve new branch circuit panels. Construction Range: $100,000 - $500,000
06/10/2021 10:00 PM UTC
41 - 50 of 60 Solicitations
1 2 3 5