MCDR_2025 TSMP
Replacement of traffic signals from existing diagonal span configuration to box span wire configurations at nine (09) intersections and installing a new signal of box span wire configuration at one (01) intersection in Macomb County. Work includes the update of vehicle and pedestrian signal & detection, cabinets, street name sign, ITS equipment, etc.
10/10/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2055 - Moravian Dr.
Moravian Dr. - From Schoenherr Rd to Garfield Rd This project includes a 3" mill and fill, with concrete base repairs, along with curb and gutter replacement, on Moravian Dr from Schoenherr Rd to Utica Rd, and a HMA wedge and 2" overlay, with Detail 7's on Moravian Dr from Utica Rd to Garfield Rd, all under Category #1. Category #2 includes the culvert replacement at the Bousson Drain. Category #3 includes sidewalk installation along Schoenherr Rd and Moravian Rd, along with a Pedestrian crossing at Kingsley Apartments, within the city of Sterling Heights. Category #4 includes sidewalk installation along Moravian Rd within Clinton Township.
05/30/2024 03:00 PM UTC
2120
2024 PAVEMENT PRESERVATION PROJECT This project includes a total of approximately 12,000 tons of Hot Mix Asphalt (HMA) paving, 12,000 syd. Of Cold Milling Existing Pavement, 15,000 ft. of Joint and Crack Repair, drainage, and restoration work on a number of locations throughout Macomb County.
05/23/2024 03:00 PM UTC
2109C
2024 PPP CON This project includes a total of approximately 28,000 syds of concrete pavement repair with related joint repair, drainage, and restoration work on a number of locations throughout Macomb County.
05/23/2024 03:00 PM UTC
Masonic Blvd & Kelly Road Intersection - Pavement Reconstruction
This project includes approximately 1,650 square yards of concrete pavement removal/replacement, 460 feet of curb and gutter removal/replacement, 630 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, including adjustments of all necessary storm and utility manholes.
05/14/2024 03:00 PM UTC
051024
County-wide longitudinal pavement marking and maintenance of traffic.
05/10/2024 03:00 PM UTC
Kelly Road Pavement Rehabilitation WO 1962
This project includes approximately 17,000 square yards of 3” milling existing pavement, 5,000 square yards of concrete pavement removal/replacement, 1,350 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, 3,150 feet of curb and gutter removal/replacement and 3,150 tons of HMA placement including adjustments of all necessary storm and utility manholes.
05/08/2024 03:00 PM UTC
MCDR 2024 Subdivision Reconstruction Program
WO No. 2074 (Donnybrook Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County. WO No. 2075 (Heatherway Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County. WO No. 2076 (North Blom Drive): This project includes the crush and shape of existing pavement, removal of existing driveways, ditch grading, culvert & storm sewer replacement, driveway replacement, HMA paving, concrete pavement repairs & joint sealing and turf restoration work in Harrison Township, Macomb County. WO No. 2077 (North Miles Street): This project includes the crush and shape of existing pavement, removal of existing driveways, ditch grading, culvert & storm sewer replacement, driveway replacement, HMA paving and turf restoration work in Clinton Township, Macomb County. WO No. 2078 (Nadine Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County. WO No. 2079 (Candler Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
05/08/2024 03:00 PM UTC
050324
County-wide special pavement markings, which includes stop bars, crosswalks, RR crossings, school zones, roundabouts, etc. and maintenance of traffic.
05/03/2024 03:00 PM UTC
042424
Remove or remove and replace guardrail, including grading and all necessary materials for installation at various locations in Macomb county.
04/24/2024 03:00 PM UTC
WO 2061
This project includes approximately 27,500 square yards of 3” milling existing pavement, 8,500 square yards of HMA crushing and shaping, 550 square yards of concrete pavement removal/replacement, 2,300 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, 1,220 feet of curb and gutter removal/replacement and 7,930 tons of HMA placement including adjustments of all necessary storm and utility manholes.
04/10/2024 03:00 PM UTC