General Info

Business Logo

Macomb County Department of Roads

117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
MCDR_2025 TSMP
Replacement of traffic signals from existing diagonal span configuration to box span wire configurations at nine (09) intersections and installing a new signal of box span wire configuration at one (01) intersection in Macomb County. Work includes the update of vehicle and pedestrian signal & detection, cabinets, street name sign, ITS equipment, etc.
10/10/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
092923
Macomb County Comprehensive Transportation Safety Action Plan (CTSAP) – Traffic Engineering Services The Macomb County Department of Roads (MCDR) is soliciting Proposals from consultants to develop the Macomb County Comprehensive Safety Action Plan (CTSAP). Proposals will be scored using a qualification-based selection process. This project will be under the direction of the MCDR Project Manager. Only consultants currently listed as prequalified to perform Design - Traffic: Safety Studies services for the Michigan Department of Transportation (MDOT) will be considered. MCDR received a Safe Streets and Roads For All (SS4A) grant from the Federal Highway Administration (FHWA).
09/29/2023 03:00 PM UTC
1913
Garfield Road - 23 Mile Road to 25 Mile Road 23 Mile Road to 24 Mile Road: Construct approximately 0.5 mile of new HMA road between 23 Mile and 24 Mile Roads with approximately 925' of existing Garfield Road reconstruction. Mill and overlay existing HMA Garfield Road. Construct a box culvert at the Eckert Drain crossing. 24 Mile Road to 25 Mile Road: Construct approximately 0.7 mile of new HMA road between 24 Mile and 25 Mile Roads with approximately 250' of existing Garfield Road reconstruction. Mill and overlay existing HMA Garfield Road to south of 25 Mile Road and approximately 350' of 24 Mile Road. Install new traffic signals at Garfield Road and 23 Mile Road and 24 Mile Road intersections. Project includes station grading, aggregate base, aggregate shoulders, subgrade undercutting, drainage improvements, HMA pavement, concrete curb and gutter, drainage improvements, traffic signal and pedestrian items and associated work.
08/25/2023 03:00 PM UTC
1959
Van Dyke Avenue and Campground Road - Roundabout, Resurfacing and Culvert Replacement. Intersection reconstruction at Van Dyke Avenue and Campground Road including the construction of a roundabout and approaches. HMA mill and overlay approximately 2,800 feet of Campground Road from Van Dyke to 28 Mile Road. Replace the culvert at the Tributary Yates Drain crossing Campground Road. Project includes station grading, aggregate base, drainage improvements, HMA pavement, concrete curb and gutter, and associated work.
06/30/2023 03:00 PM UTC
1963
Metropolitan Parkway - Ryan Road to Mound Road PAVEMENT SURFACE REHABILITATION This project includes 52,000 square yards of 3” milling existing pavement, 14,000 square yards of concrete pavement removal/replacement, 1,000 square feet of Sidewalk Ramp, ADA, Modified, 22,000 feet of curb and gutter removal/replacement and 8,800 tons of HMA, Modified placement including adjustments of all necessary storm and utility manholes.
06/30/2023 02:00 PM UTC
061623
Removal and replacement of three (3) existing storm water mechanical and electrical systems or part of that at the three (3) stations in Harrison Township, MI-48045
06/16/2023 03:00 PM UTC
060923
2023 Special Pavement Marking
06/09/2023 03:00 PM UTC
1966_ 30 Mile Road ( Phase2)
Construct 0.94 mile of HMA road on 30 Mile Road from Bur Oak Drive to Kildare Drive
05/26/2023 03:00 PM UTC
North Bay Industrial Pavement Reconstruction
This project includes approximately 38,000 square yards of concrete pavement removal/replacement, 12,000 square feet of concrete driveway removal/replacement, ADA sidewalk ramps and including adjustments of all necessary storm and utility manholes.
05/26/2023 03:00 PM UTC
1904&1979
WO No. 1904 (ADVERTISEMENT FOR Construct Dual Right Turn Lanes on Card Road to M-59 (Hall Road)). Project includes station grading, aggregate base, aggregate shoulders, subgrade undercutting, drainage improvements, concrete curb and gutter, Side walk, ADA Ramp and associated work , HMA pavement including adjustments of all necessary storm and utility manholes in Macomb Township, Macomb County. WO No. 1979 (ADVERTISEMENT FOR Construct bypass lane 21 Mile Road at Autumn Ridge) Project includes aggregate base, aggregate shoulders, subgrade undercutting, drainage improvements, concrete curb and gutter, Side walk, ADA Ramp and associated work, HMA pavement including adjustments of all necessary storm and utility manholes in Macomb Township, Macomb County.
05/26/2023 03:00 PM UTC
040723
2023 Guardrail Safety Project
05/12/2023 03:00 PM UTC
31 - 40 of 61 Solicitations
1 2 4 6 7