General Info

Business Logo

Macomb County Department of Roads

117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
MCDR_2025 TSMP
Replacement of traffic signals from existing diagonal span configuration to box span wire configurations at nine (09) intersections and installing a new signal of box span wire configuration at one (01) intersection in Macomb County. Work includes the update of vehicle and pedestrian signal & detection, cabinets, street name sign, ITS equipment, etc.
10/10/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
1914 - Harper Avenue
Full depth concrete pavement removal/replacement, curb & gutter removal/replacement, turf restoration, and adjustments of all storm and utility manholes as necessary. Work in City of Saint Clair Shores, Macomb County.
06/28/2022 03:00 PM UTC
1268-2022C
2022 CONCRETE PAVEMENT PRESERVATION PROJECT This project includes a total of approximately 50,350 syds of concrete pavement repair with related joint repair, drainage, and restoration work on a number of locations throughout Macomb County
05/25/2022 03:00 PM UTC
1897
West Road (Mound Road - Van Dyke Avenue) APPROXIMATELY 1.0 MILES OF PAVEMENT MILLING, HMA OVERLAY, JOINT AND CRACK REPAIR, LANDSCAPE RESTORATION, AND PAVEMENT MARKINGS.
05/13/2022 03:00 PM UTC
1905
2022 Subdivision Reconstruction Program in Macomb County. Roadway reconstruction, crush and shape existing roadway, storm sewer remove and replace, large and small culvert replacement, ditching, side walks and ADA ramps. Work in Clinton, Harrison, Macomb, Shelby, and Washington Township(s).
05/04/2022 03:00 PM UTC
1268-2022A
2022 PAVEMENT PRESERVATION PROJECT This project includes a total of approximately 25,000 tons of Hot Mix Asphalt (HMA) paving, 10,000 syd. of Cold Milling of Existing Pavement, 32,000 ft. of Joint and Crack Repair, drainage, and restoration work on a number of locations throughout Macomb County.
04/28/2022 02:00 PM UTC
1902
This project includes approximately 26,000 square yards of 3” milling existing pavement, 3,500 square yards of concrete pavement removal/replacement, 1,200 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, 2,400 feet of curb and gutter removal/replacement and 4,600 tons of HMA placement including adjustments of all necessary storm and utility manholes.
04/26/2022 03:00 PM UTC
030222
2022 Special Pavement Marking Project
04/15/2022 03:00 PM UTC
012522
2022 Longitudinal Pavement Marking
04/08/2022 03:00 PM UTC
030122
2022 Guardrail Safety Project #030122
03/18/2022 03:00 PM UTC
1903
This project includes 59,000 square yards of 3” milling existing pavement, 17,000 square yards of concrete pavement removal/replacement, 1,900 square feet of Sidewalk Ramp, ADA, Modified, 19,100 feet of curb and gutter removal/replacement and 10,000 tons of HMA, Modified placement including adjustments of all necessary storm and utility manholes.
03/09/2022 03:00 PM UTC
51 - 60 of 61 Solicitations
1 2 3 4 6