050324
County-wide special pavement markings, which includes stop bars, crosswalks, RR crossings, school zones, roundabouts, etc. and maintenance of traffic.
| 05/03/2024 03:00 PM UTC |
|
042424
Remove or remove and replace guardrail, including grading and all necessary materials for installation at various locations in Macomb county.
| 04/24/2024 03:00 PM UTC |
|
WO 2061
This project includes approximately 27,500 square yards of 3” milling existing pavement, 8,500 square yards of HMA crushing and shaping, 550 square yards of concrete pavement removal/replacement, 2,300 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, 1,220 feet of curb and gutter removal/replacement and 7,930 tons of HMA placement including adjustments of all necessary storm and utility manholes.
| 04/10/2024 03:00 PM UTC |
|
092923
Macomb County Comprehensive Transportation Safety Action Plan (CTSAP) – Traffic Engineering Services
The Macomb County Department of Roads (MCDR) is soliciting Proposals from consultants to develop the Macomb County Comprehensive Safety Action Plan (CTSAP). Proposals will be scored using a qualification-based selection process.
This project will be under the direction of the MCDR Project Manager. Only consultants currently listed as prequalified to perform Design - Traffic: Safety Studies services for the Michigan Department of Transportation (MDOT) will be considered.
MCDR received a Safe Streets and Roads For All (SS4A) grant from the Federal Highway Administration (FHWA).
| 09/29/2023 03:00 PM UTC |
|
1913
Garfield Road - 23 Mile Road to 25 Mile Road
23 Mile Road to 24 Mile Road: Construct approximately 0.5 mile of new HMA road between 23 Mile and 24 Mile Roads with approximately 925' of existing Garfield Road reconstruction. Mill and overlay existing HMA Garfield Road. Construct a box culvert at the Eckert Drain crossing.
24 Mile Road to 25 Mile Road: Construct approximately 0.7 mile of new HMA road between 24 Mile and 25 Mile Roads with approximately 250' of existing Garfield Road reconstruction. Mill and overlay existing HMA Garfield Road to south of 25 Mile Road and approximately 350' of 24 Mile Road.
Install new traffic signals at Garfield Road and 23 Mile Road and 24 Mile Road intersections.
Project includes station grading, aggregate base, aggregate shoulders, subgrade undercutting, drainage improvements, HMA pavement, concrete curb and gutter, drainage improvements, traffic signal and pedestrian items and associated work.
| 08/25/2023 03:00 PM UTC |
|
1959
Van Dyke Avenue and Campground Road - Roundabout, Resurfacing and Culvert Replacement. Intersection reconstruction at Van Dyke Avenue and Campground Road including the construction of a roundabout and approaches. HMA mill and overlay approximately 2,800 feet of Campground Road from Van Dyke to 28 Mile Road. Replace the culvert at the Tributary Yates Drain crossing Campground Road. Project includes station grading, aggregate base, drainage improvements, HMA pavement, concrete curb and gutter, and associated work.
| 06/30/2023 03:00 PM UTC |
|
1963
Metropolitan Parkway - Ryan Road to Mound Road
PAVEMENT SURFACE REHABILITATION
This project includes 52,000 square yards of 3” milling existing pavement, 14,000 square yards of concrete pavement removal/replacement, 1,000 square feet of Sidewalk Ramp, ADA, Modified, 22,000 feet of curb and gutter removal/replacement and 8,800 tons of HMA, Modified placement including adjustments of all necessary storm and utility manholes.
| 06/30/2023 02:00 PM UTC |
|
061623
Removal and replacement of three (3) existing storm water mechanical and electrical systems or part of that at the three (3) stations in Harrison Township, MI-48045
| 06/16/2023 03:00 PM UTC |
|
060923
2023 Special Pavement Marking
| 06/09/2023 03:00 PM UTC |
|
1966_ 30 Mile Road ( Phase2)
Construct 0.94 mile of HMA road on 30 Mile Road from Bur Oak Drive to Kildare Drive
| 05/26/2023 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.