Chandler Lane and Chandler Drive Watermain Replacement
Project Description: The project involves the installation 1,050 LF of 6 inch PVC waterline (open cut), 15 LF of 6 PVC waterline with casing pipe, 230 LF of 6 inch fusible PVC waterline (HDD), replacement of existing fire hydrants, valves, service connections, and appurtenances. Also included is site restoration. The proposed waterline is to replace the aging ductile iron waterline.
Engineer's Estimate: $504,735.00.
| 06/17/2025 02:00 PM UTC |
Floodplain Restoration and Stormwater Control - Rebid
Project Description: This project will install multiple stormwater control measures on multiple city-owned and purchased properties within the Geauga Lake Subdivision. Stormwater control measures are designed to reduce neighborhood flooding and include green infrastructure elements. This project is partially funded by a Hazard Mitigation Grant.
Engineer's Estimate: $339,416.00
| 06/03/2025 02:00 PM UTC |
Aurora Park Spring 2025 Demolition
The City of Aurora is seeking a qualified Contractor to perform structural demolition services as outlined in the bid. The Work consists of razing, removing, and disposing of selected buildings, structures, foundations, obstructions, building slabs, concrete pavement, asphalt pavement and selective piles of debris.
Desired completion date is June 30, 2025. Required completion date is 60 days from Notice to Proceed.
| 05/20/2025 02:00 PM UTC |
Floodplain Restoration and Stormwater Control
Project Description: This project will install multiple stormwater control measures on multiple city-owned and purchased properties within the Geauga Lake Subdivision. Stormwater control measures are designed to reduce neighborhood flooding and include green infrastructure elements. This project is partially funded by a Hazard Mitigation Grant.
Engineer's Estimate: $328,669.00
| 05/06/2025 02:00 PM UTC |
South Chillicothe Road - Streetlight Installation
Project Description: The work covered by the specifications consists of the installation of 18 decorative light posts (pre-purchased and supplied by the City of Aurora), concrete bases, 2,058 linear feet of PVC conduit with wires, landscape restoration and maintenance of traffic. Several portions of the conduit shall be bored or directionally drilled. The project is anticipated to begin July 7, 2025 and must attain Final Completion by August 8, 2025.
Engineer's Estimate: $225,602.00
| 05/05/2025 02:00 PM UTC |
2025 Road Paving Program
The work covered by the specifications includes furnishing all labor, equipment and the noted material for street improvements including pavement planing, partial depth pavement repairs, full depth pavement repairs, asphalt resurfacing, asphalt, drive aprons, and pavement markings including all appurtenances. These improvements shall begin no later than May 1, 2025 and must attain Final Completion by July 1, 2025. All bidders and subcontractors must be ODOT prequalified in the categories required for the type of work they are to perform.
The engineer’s estimates for the proposed improvements:
Base Bid Estimate: $1,068,476.06
Alternate #1 Bid Estimate: $96,395.87
Alternate #2 Bid Estimate: $233,878.52
Alternate #3 Bid Estimate: $154,104.38
Alternate #4 Bid Estimate: $195,634.23
Alternate #5 Bid Estimate: $62,956.06
Alternate #6 Bid Estimate: $14,991.15
Alternate #7 Bid Estimate: $10,657.41
Alternate #8 Bid Estimate $8,307.79
Alternate #9 Bid Estimate $495,303.48
| 04/07/2025 02:00 PM UTC |
Aurora PRP Ravine Bridge Replacement
This project includes the demolition and replacement of the existing single span bridge located in Paddock River Preserve on Trails End in Aurora, OH. The replacement structure is an 80’, 6’ wide modular, prefabricated boardwalk system bridge on concrete abutments. Included in the scope of work is trail work needed to accommodate the pro-posed bridge span and facilitation of access to the site.
Engineer's Estimate is: $472,577.50
Mandatory Pre-Bid Meeting: Tuesday, March 18 at 8 a.m., 159 Trails End, Aurora, OH 44202
Bid Opening via Zoom:
Meeting ID: 836 8959 7993
Passcode: 44202
| 03/24/2025 02:00 PM UTC |
10 South Chillicothe Road Improvements
Project Description: The work covered by the specifications includes furnishing all labor, equipment and the noted material for improvements including relocated entrance, new stair, and new toilet rooms.
Architect's Estimate:
Base Bid Estimate: $150,000.00
Alternative #1 Bid Estimate: $3,500.00
Optional Site Visit: March 6, 2025 at 10AM
| 03/20/2025 02:00 PM UTC |
HVAC Annual Maintenance
The intent of this contract is to provide preventative and emergency maintenance to city HVAC units throughout multiple city buildings. This project includes quarterly maintenance, emergency maintenance/repairs and diagnostics in the City of Aurora, Ohio.
Budget: $35,000.00
| 02/04/2025 03:00 PM UTC |
Roof Replacement - Facilities Office Building
The scope of work includes three sections of roofing in need of replacement. Replacement styles include “Cold Press Restoration,” flat roof tear off and replacement and shingle roof tear off and replacement.
Mandatory Site Visit: Wednesday, November 20, 2024 at 1PM
Estimate: $134,200.00
All work is expected to be completed sixty (60) days after formally issued "Notice to Proceed" following preconstruction meeting. All work shall be completed on or before June 30, 2025.
Meeting ID: 896 6188 4964
Passcode: 44202
| 12/03/2024 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.