General Info

Business Logo

City of Aurora, OH

158 W. Pioneer Trail, Aurora, OH 44202
(330) 995-9116


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Westerly Trunk Sewer Relocation
Project Description: The approximate quantities and type of work for this project for which proposals will be accepted consist of installing 1,194 feet of 20” Hobas FRP sanitary sewer (260 feet through a 36” steel casing bored and jacked), 12 feet of 18” RCP sanitary sewer, 4 feet of 8” PVC sanitary sewer, removing two existing manholes, installing seven new manholes, pavement repairs, tree clearing and maintenance of traffic. Due to the importance of not interrupting critical sanitary sewer routes, the use of temporary bypass pumping will be required. Flow diversion using tankers or vactor trucks may be employed. Engineer's Estimate: $1,070,224.50 Work shall commence no later than December 31, 2025.
11/12/2025 03:00 PM UTC
Turf and Landscape Maintenance Program
The City of Aurora seeks a reputable contractor to perform landscaping services for the 2026 season (approximately eight months, at the beginning of April through approximately the end of November). This is a one-year contract with renewal options for years 2 and 3. Budgeted Amount (Year 1): $90,000.00
10/14/2025 02:00 PM UTC
Generator and Transfer Switch Replacement
Project Description: The City of Aurora Westerly Wastewater Treatment Plant’s existing generator has exceeded its lifetime and warrants replacement. The city is soliciting contractors to disconnect the existing generator and install a new generator and transfer switch supplied by the city. MANDATORY PRE-BID SITE MEETING - SEPTEMBER 10, 2025 AT 10AM. LOCATION: 1230 W. Garfield Road, Aurora, OH 44202 Project Estimate: $80,000.00 Updated Zoom Information: Meeting ID: 897 7550 5540 Passcode: 44202
10/07/2025 02:00 PM UTC
Turf and Landscape Maintenance Program
The City of Aurora seeks a reputable contractor to perform landscaping services for the 2026 season (approximately eight months, at the beginning of April through approximately the end of November). This is a one-year contract with renewal options for years 2 and 3. Budgeted Amount (Year 1): $65,000.00
09/15/2025 02:00 PM UTC
Pricing Procurement: Sludge Screw Conveyor System
The City of Aurora dewaters aerobically digested sludge to 12% Total Solids with a 1.5 Meter Belt Filter press. Dewatered sludge cake is dropped into a chute at the end of the dewatering press and conveyed ten vertical feet to the top of a truck with a load off container. The belt filter press is raised 36 inches from the floor. When the truck is full, it is driven to an adjacent Sludge Storage Structure and dropped on a concrete floor. The Owner wishes to eliminate the need for conveying sludge to the Sludge Storage Building via a truck. The City of Aurora will install this system including all foundations for structural support including support in the Sludge Dewatering Building. The Supplier shall co-ordinate support requirements of the conveyor system to properly interface to foundation support locations determined by the City. The project includes delivering all component parts to the City of Aurora Westerly WWTP at 1230 W. Garfield Road, Aurora, OH 44202. UPDATED ZOOM INFORMATION Meeting ID: 864 7652 6215 Password: 44202
08/29/2025 02:00 PM UTC
Concrete Repair Program
The City of Aurora will utilize a contractor to perform concrete repairs within city limits. Contractor would be responsible for a variety of services including: full depth concrete road repairs, crack sealing, catch basin repairs, ADA compliance upgrades, new sidewalk installation, etc. The city budgets for concrete repairs annually. Pricing is to be provided per service by unit price. Repairs will be requested by the contractor based on the city's current needs. Budget: $350,000.00 **Bid bond should reflect the city's budgeted amount**
08/26/2025 02:00 PM UTC
Citywide Pavement Markings Program
Project Description: The City of Aurora seeks to enter into a contract with a reputable company to perform annual pavement marking services. This is a one-year contract with renewal options for years 2 and 3. Annual Budget: $145,000.00
08/26/2025 02:00 PM UTC
Aurora Park Earthwork - Phase 1
Project Description: The work covered by the specifications consists of demolition of underground infrastructure, surface asphalt and concrete pavements, concrete and steel bulkhead walls, remnant reinforced concrete structures, and other miscellaneous site demolition. Removal and salvage of existing trees. Mass re-grading of site earthwork to prepare a more level subgrade for the future park development, including placement of embankment soil in future lawn areas. Engineer's Estimate Base Bid: $1,080,000.00 Alternate: $160,000.00 Total Estimate: $1,240,000.00
08/20/2025 02:00 PM UTC
Chandler Lane and Chandler Drive Watermain Replacement
Project Description: The project involves the installation 1,050 LF of 6 inch PVC waterline (open cut), 15 LF of 6 PVC waterline with casing pipe, 230 LF of 6 inch fusible PVC waterline (HDD), replacement of existing fire hydrants, valves, service connections, and appurtenances. Also included is site restoration. The proposed waterline is to replace the aging ductile iron waterline. Engineer's Estimate: $504,735.00.
06/17/2025 02:00 PM UTC
Floodplain Restoration and Stormwater Control - Rebid
Project Description: This project will install multiple stormwater control measures on multiple city-owned and purchased properties within the Geauga Lake Subdivision. Stormwater control measures are designed to reduce neighborhood flooding and include green infrastructure elements. This project is partially funded by a Hazard Mitigation Grant. Engineer's Estimate: $339,416.00
06/03/2025 02:00 PM UTC
1 - 10 of 51 Solicitations
← Previous 1 3 4 5 6