General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
26-20-1
Lafitte St Drainage---------------------------------------The Parish requests a Contractor to improve drainage by removing and replacing the existing structure(s), subsurface drainage pipe, catch basin, sod, concrete driveways, and driveway aprons as specified along Lafitte St (R04D050) located in Mandeville, LA.
07/16/2026 07:00 PM UTC
26-19-1
Traffic Calming Program - Red Gap & Northern Homes------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to implement traffic calming solutions by way of asphaltic concrete speed tables, in addition to striping and respective speed table striping in on several residential streets in Red Gap & Northern Homes Subdivisions, Mandeville, La. This work, as specified in these documents and construction plans, is located along Soell Dr (R03L011), Hunt Dr (R03L012), Parker Dr (R03L014), Mire Dr (R03L016), 11th Ave (R03L013), Helenbirg Rd (R03L001), 6th Ave (R03L005), Lincoln St (R03L025), and North St (R03L026) Sections 11-14, Township 7S Range 11E.
07/16/2026 07:00 PM UTC
26-21-1
Lacombe Turning Radii Improvements___ The Parish requests a contractor to improve turning radii by installing drain pipes, catch basins, patching and shoulder materials as specified along Charlotte St (R07E044) Lacombe ; N. 25th St (R07E030) Lacombe ; Cloverland Dr (R07E040) Lacombe ; N. 8th St (R07E002) Lacombe, Louisiana.
07/16/2026 07:00 PM UTC
26-35-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
07/28/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
25-38-1
Shady Oaks Dr Drainage---------------The Parish requests a Contractor to improve and restore drainage by removing and replacing storm drain pipes and removing and replacing driveways and ditches along Shady Oaks Dr, Covington, LA., as required in the specifications.
06/17/2025 07:00 PM UTC
25-35-1
Area 3 Concrete Maintenance-----------------The Parish requests a Contractor to improve roadways by removing/replacing concrete panels and concrete barriers/rollover curbs as specified in the specifications on Devonshire Dr. (R08V039), Slidell, LA; Hampton Ln. (R08V042), Slidell, LA; Maple Cir. (R08I044) Slidel,l LA; Tiffany St. (R08V024) Slidell, LA.
06/11/2025 07:00 PM UTC
25-17-2
2025 District 1,2,3,5 Road Improvements-----------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified at the various locations: - Crater Lake Dr. (R01E006), Covington; - Shady Lake Dr. (R01E016), Covington; - B St. (R03L039), Covington; - Edna St. (R03K072), Covington; - N 3rd St. (R03K017), Covington; - Progress St. (R10D017), Covington; - Booth Rd. Ph. 2 (R02J006), Folsom; - Boyd Rd. Ph 2. (R01B002), Covington; - Rolling Hills Blvd. (R02H015), Folsom ; - Stoney Ct. (R02J006), Folsom; - Valley Ct. (R02K023), Folsom; and - Henry E Meiners Rd. (R04E079), Mandeville.
06/10/2025 07:00 PM UTC
25-34-1
Chess Dr Drainage--------------The Parish requests a Contractor to improve drainage by removing/replacing catch basin and removing/replacing concrete sidewalk as specified along Chess Dr. (R08I070) Slidell LA as required in the specifications.
06/10/2025 07:00 PM UTC
25-36-1
Barrymore St & Stanton Ln Drainage-------The Parish requires a qualified contractor to perform drainage improvements along Barrymore Street (R08V037) and Stanton Lane (R09A030) in Slidell, Louisiana. The work will include the removal and replacement of concrete panels and driveways, resealing catch basins, and cleaning, repairing, and resealing pipe joints. All work will be conducted in accordance with the project specifications.
06/05/2025 07:00 PM UTC
25-15-2
Safe Haven Cardinal Cove Cabin Renovations - Phase 1------ This work includes selective demolition of buildings and walkways, hazardous materials abatement, roof and siding replacement, and structural repairs to walkway and Living Unit roof structures.
06/04/2025 07:00 PM UTC
25-29-1
Southdown Tallow Creek Subdivisions Sinkhole Repair-----The Parish requests a Contractor to improve drainage by cleaning, sealing pipe joints and catch basins on Cole Ct. (R01C033); Southdown Ln. (R01K017); Silverthorne Ln. (R01K020) and Tallow Creek Blvd. (R01C027) located in Covington, Louisiana.
06/03/2025 07:00 PM UTC
25-31-1
Cross Gates Blvd Repair-----The Parish requests a Contractor to improve roadway by milling and overlaying, and patching various sections of road surface along Cross Gates Blvd, Slidell, LA as required in the specifications.
06/03/2025 07:00 PM UTC
25-33-1
Amber St. Drainage----The Parish requires a contractor to perform drainage improvements by cleaning, repairing, and resealing pipe joints, rebuilding and resealing catch basins along Amber St (R08L007), Slidell, LA, as required in the specifications.
06/03/2025 07:00 PM UTC
25-25-1
Pearl River Diversion Canal Stabilization----The purpose of this project is to install erosion control measures within an area at the end of the Pearl River Diversion Canal that was disturbed from previous dredging operations. These measures include hydroseeding, erosion control matting, and tree planting.
05/29/2025 07:00 PM UTC
101 - 110 of 981 Solicitations
1 2 7 8 9 11 13 14 15 98 99