General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
24-66-1
Brookhaven Ct Panels PH 2--------------------Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove/replace existing concrete panels and catch basin located at Brookhaven Ct (R08V028) Section 13 Township 9S Range 14E in Slidell, Louisiana.
12/05/2024 08:00 PM UTC
24-57-1
Cross Gates Subdivision Sinkhole Repairs --------------------------------------------------The Parish requests a contractor to reseal the interior joints of the existing subsurface pipe and remove/replace a catch basin along Camborne Ln (R08N026), Section 38 Township 9S Range 15E, and N Buckingham Dr (R08N009), Section 38 Township 9S Range 15E, Slidell, Louisiana.
12/05/2024 08:00 PM UTC
24-62-2
Cross Gates Wastewater Treatment Plant Improvements--------------------------------The work of this project comprises the construction of new treatment structures as a part of an upgrade of treatment facilities.
12/03/2024 08:00 PM UTC
24-64-2
Old River Rd----------------------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Old River Rd (R08N033) Section 17, 39, 9 Township 9S Range 15E, as required in drawings.
12/03/2024 08:00 PM UTC
24-47-2
River Oaks Building & Well Improvements ------ New control building, controls, piping, site grading and drainage, equipment, utility lines and other related items at the River Oaks site.
11/26/2024 08:00 PM UTC
24-46-2
Cross Gates Water System Well Site Buildings---------------------------------------------New control buildings, controls, generators, paving, fencing, electrical service, equipment, utility lines, and various related items at the Ozone Pines site. New controls, control building, generator, equipment, utility lines, and related items at the Willow Wood site.
11/26/2024 08:00 PM UTC
24-49-1
Radar Speed Limit Signs Inspections & Repairs------The purpose of this Quote Request is to obtain quotes from qualified respondents who are interested in providing annual maintenance and repairs to our Radar Speed Limit Signs at various locations throughout the Parish.
11/19/2024 08:00 PM UTC
24-59-1
Marie Dr & Lazy K-----The Parish requires a Contractor to improve road surfaces with drainage improvement along Marie Dr (R07C015) Section 43 Township 8S Range 13E; and Lazy K (R07I017) Section 47 Township 9S Range 13E; located in Lacombe, Louisiana, as specified.
11/19/2024 08:00 PM UTC
24-60-1
Sylve Rd & N Pontchartrain Dr Radius Improvements----------------------------The Parish requires a Contractor to improve turning radius and drainage at different locations along N Pontchartrain Dr (R07E053) Section 48 Township 8S Range 12E; Lacombe, and Sylve Rd (R09E028) Section 40 Township 9S Range 13E: Slidell, Louisiana.
11/19/2024 08:00 PM UTC
24-57-2
Sharp Rd., PH 2-----------------------------------------------------------This project includes the construction of subsurface drainage, a reinforced concrete box culvert with headwalls, asphalt pavement, base course, subgrade, pavement striping, and concrete, asphalt, and gravel drives.
11/14/2024 08:00 PM UTC
101 - 110 of 917 Solicitations
1 2 7 8 9 11 13 14 15 91 92