General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-39-2
Cherry Laurel Dr Drainage--------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by installing, removing, and replacing drainpipe, catch basin, and sod. Work will include asphalt, and patching as specified along Cherry Laurel Dr (R04A032) located in Covington, LA.
09/09/2026 07:00 PM UTC
26-30-1
Whispering Ln Drainage-------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing cross culverts, catch basins, and sewer tie ins as specified along Whispering Ln (R01I016) located in Madisonville, Louisiana.
09/15/2026 07:00 PM UTC
26-29-1
N 27th St Drainage ------------------------------------- The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage along N 27th St (R07E059), Lacombe, LA. Work shall include removing, replacing, and installing drainage culverts and catch basins as specified.
09/17/2026 07:00 PM UTC
26-31-1
E. Brewster Rd Pipe Repairs------------------------------The Parish requests a contractor to improve drainage as specified along E. Brewster Rd (R01L003), Covington, Louisiana, by removing roots and cleaning and installing CIPP liner through existing pipes.
09/17/2026 07:00 PM UTC
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
25-14-1
Adele Ln Sinkhole Repairs -----------The Parish requests a contractor to improve drainage by re-grouting catch basin, wrap pipe joint, remove/replace concrete driveway apron located on Adele Ln (R09A028); in Slidell, Louisiana.
03/12/2025 07:00 PM UTC
25-10-2
Excavator-----------------------The Parish extends this MATERIAL ONLY bid request to procure an Excavator. This equipment shall be a new piece of equipment. The Excavator will be procured for the Public Works Department.
03/12/2025 07:00 PM UTC
25-15-1
Browns Village Rd---------------------------------------------------------------------------The Parish requests a Contractor to improve the roadway by installing subsurface and patching road surface as specified on Browns Village Rd, in Slidell, LA.
03/12/2025 07:00 PM UTC
25-4-2
2025 District 7,9,12,13 Road Improvements ---- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: • Alberu Dr (R09G060) Slidell; • Bar St (R08M055) Slidell; • Buck Dr (R06H033) Pearl River; • Clara Dr (R09J006) Slidell; • Dogwood Dr (R07C067) Lacombe; • E Ruth Rd (R07H103) Lacombe; • Hemlock Dr (R06G021) Pearl River; • Jacqueline Dr (R09J003) Slidell; • LA Industries Pit Rd (R06F003) Pearl River; • Tulip Dr (R08F124) Section 30 Township 8S Range 15E Slidell; and • Yaupon Dr (R08M033) Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
03/11/2025 07:00 PM UTC
25-3-2
2025 District 6 & 11 Road Improvements-----------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along Bookout Rd (R06H013) Section 8 Township 7S Range 14E Pearl River ; Cecil Fleming Rd (R06I009) Section 40 Township 6S Range 14E Pearl River ; Duncan Ln (R05C008) Section 41 Township 5S Range 12E Slidell ; Hemphill Rd (R05A011) Section 15 Township 5S Range 12E Bush ; Jarrell Rd (R02P024) Section 22 Township 5S Range 11E Covington ; Bristol Ct (R09C044) Section 31 Township 8S Range 14E Slidell ; E. Ashton Ct (R09C047) Section 38 Township 8S Range 14E Slidell ; Florence Rd (R04B001) Section 13 Township 7S Range 11E Covington ; Louisiana.
03/11/2025 07:00 PM UTC
25-3-1
Emergency Electrical Services----The St. Tammany Parish Government Department of Facilities Management is requesting quotes from licensed and insured electrical companies for services to be provided during an emergency event at Parish facilities throughout the Parish.
03/06/2025 08:00 PM UTC
25-17-1
Jane Dr Drainage----The Parish requests a Contractor to improve drainage by removing and replacing failed drainage culverts and asphalt roadway, as specified, along Jane Dr(R09H026); located in Slidell, Louisiana.
03/06/2025 08:00 PM UTC
25-16-1
Clausel St Drainage----The Parish requests a Contractor to improve drainage by installing and repairing drain pipe, catch basin, and concrete driveway located on Clasuel St (R04E123); in Mandeville, Louisiana, as specified.
03/06/2025 08:00 PM UTC
25-8-1
Place St. Germain Drainage---------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to restore area drainage and repair sinkhole by lining existing pipe as specified along Place St Germain (R01E030) Covington.
02/27/2025 08:00 PM UTC
25-5-1
102 Castle Dr. ------ The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to restore area drainage by removing and replacing the catch basin curb inlet located at 102 Castle Dr. (R08I068) in Slidell, LA., as specified.
02/27/2025 08:00 PM UTC
141 - 150 of 996 Solicitations
1 2 11 12 13 15 17 18 19 99 100