General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-39-2
Cherry Laurel Dr Drainage--------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by installing, removing, and replacing drainpipe, catch basin, and sod. Work will include asphalt, and patching as specified along Cherry Laurel Dr (R04A032) located in Covington, LA.
09/09/2026 07:00 PM UTC
26-30-1
Whispering Ln Drainage-------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing cross culverts, catch basins, and sewer tie ins as specified along Whispering Ln (R01I016) located in Madisonville, Louisiana.
09/15/2026 07:00 PM UTC
26-29-1
N 27th St Drainage ------------------------------------- The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage along N 27th St (R07E059), Lacombe, LA. Work shall include removing, replacing, and installing drainage culverts and catch basins as specified.
09/17/2026 07:00 PM UTC
26-31-1
E. Brewster Rd Pipe Repairs------------------------------The Parish requests a contractor to improve drainage as specified along E. Brewster Rd (R01L003), Covington, Louisiana, by removing roots and cleaning and installing CIPP liner through existing pipes.
09/17/2026 07:00 PM UTC
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
07/02/2025 07:00 PM UTC
25-19-2
St. John Church Rd Bridge----------------------------The Contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work as required in the construction drawings and specifications, located on St. John Church Rd (B02G002), Section 7, Township 5S, Range 10E, Folsom, LA.
07/01/2025 07:00 PM UTC
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041); Mandeville, Louisiana, 70448.
06/25/2025 07:00 PM UTC
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
06/24/2025 07:00 PM UTC
25-37-1
DPW Fritchie Barn Door Replacement 2025------The Parish requires a Contractor to remove and replace two steel roll up doors located at Fritchie Barn at 63119 Highway 1090 in Pearl River, Louisiana.
06/17/2025 07:00 PM UTC
25-38-1
Shady Oaks Dr Drainage---------------The Parish requests a Contractor to improve and restore drainage by removing and replacing storm drain pipes and removing and replacing driveways and ditches along Shady Oaks Dr, Covington, LA., as required in the specifications.
06/17/2025 07:00 PM UTC
25-35-1
Area 3 Concrete Maintenance-----------------The Parish requests a Contractor to improve roadways by removing/replacing concrete panels and concrete barriers/rollover curbs as specified in the specifications on Devonshire Dr. (R08V039), Slidell, LA; Hampton Ln. (R08V042), Slidell, LA; Maple Cir. (R08I044) Slidel,l LA; Tiffany St. (R08V024) Slidell, LA.
06/11/2025 07:00 PM UTC
25-17-2
2025 District 1,2,3,5 Road Improvements-----------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified at the various locations: - Crater Lake Dr. (R01E006), Covington; - Shady Lake Dr. (R01E016), Covington; - B St. (R03L039), Covington; - Edna St. (R03K072), Covington; - N 3rd St. (R03K017), Covington; - Progress St. (R10D017), Covington; - Booth Rd. Ph. 2 (R02J006), Folsom; - Boyd Rd. Ph 2. (R01B002), Covington; - Rolling Hills Blvd. (R02H015), Folsom ; - Stoney Ct. (R02J006), Folsom; - Valley Ct. (R02K023), Folsom; and - Henry E Meiners Rd. (R04E079), Mandeville.
06/10/2025 07:00 PM UTC
25-34-1
Chess Dr Drainage--------------The Parish requests a Contractor to improve drainage by removing/replacing catch basin and removing/replacing concrete sidewalk as specified along Chess Dr. (R08I070) Slidell LA as required in the specifications.
06/10/2025 07:00 PM UTC
25-36-1
Barrymore St & Stanton Ln Drainage-------The Parish requires a qualified contractor to perform drainage improvements along Barrymore Street (R08V037) and Stanton Lane (R09A030) in Slidell, Louisiana. The work will include the removal and replacement of concrete panels and driveways, resealing catch basins, and cleaning, repairing, and resealing pipe joints. All work will be conducted in accordance with the project specifications.
06/05/2025 07:00 PM UTC
111 - 120 of 996 Solicitations
1 2 8 9 10 12 14 15 16 99 100