Number Deadline
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
06/24/2025 07:00 PM UTC
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041); Mandeville, Louisiana, 70448.
06/25/2025 07:00 PM UTC
25-19-2
St. John Church Rd Bridge----------------------------The Contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work as required in the construction drawings and specifications, located on St. John Church Rd (B02G002), Section 7, Township 5S, Range 10E, Folsom, LA.
07/01/2025 07:00 PM UTC
25-41-1
Terra Bella Curb Repair----The Parish requests a Contractor to perform roadway improvements by removing and replacing sections of concrete barrier curbs as specified along Inglewood Terrace (R01C059), Covington, LA; Bocage Ct (R01C039), Covington, LA; Melrose Ave (R01C042), Covington, LA.
07/02/2025 07:00 PM UTC
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
07/02/2025 07:00 PM UTC
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
07/08/2025 07:00 PM UTC
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along: − Bocage Ct (R01C039) Covington; − Fayedaye St (R01I048) Madisonville; − Melrose Ave (R01C042) Covington; and − Spring Haven Ln (R01J098) Madisonville.
07/09/2025 07:00 PM UTC
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened” fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
07/23/2025 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
25-21-1
Woodridge Blvd Drainage ------------The Parish requests a contractor to improve drainage by installing catch basins into sub-surface located on Woodridge Blvd (R04C004); in Mandeville, Louisiana.
04/02/2025 07:00 PM UTC
25-8-2
Berry Todd Rd & N Dixie Ranch Rd----The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surfaces by milling and overlaying approximately 21,500 total feet of asphaltic concrete and installing roadway striping, as specified along Berry Todd Rd (R07C002) Section 19/43/39/29/28, Township 8S, Range 13E, and N Dixie Ranch Rd (R07B004) Section 16-17, Township 8S, Range 13E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is forty-five (45) days from issuance of Notice to Proceed by the Parish.
04/01/2025 07:00 PM UTC
25-9-2
2025 District Panel Replacements---------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along Maison Dr (R01K015) Covington ; Bluefield Dr (R08I061)Slidell ; Kelly Dr (R08I005) Slidell ; Kris Dr (R08I006) Slidell ; Northwood Dr (R08I030) Slidell ; Timbers Dr (R08I043) Slidell ; Autumn Wind Ln (R04F063) Mandeville ; Brandon Dr (R08P030) Slidell ; West End Blvd (R09J110) Slidell.
04/01/2025 07:00 PM UTC
25-18-1
Sycamore Dr Turn Radius----The parish requests a contractor to improve the turning radius at the first part of the s-curve by installing subsurface drainage, catch basins, patching and shoulder material as specified
03/13/2025 07:00 PM UTC
25-19-1
Huntwyck Village Sidewalks------The Parish requests a contractor to improve sidewalks at various locations as specified along Drury Ln (R09G037) Slidell; Holmes Dr (R09G040) Slidell; Portsmouth Dr (R09G039) Slidell; Queen Anne Dr (R09G038) Slidell; Raleigh Dr (R09G036) Slidell; Westminster Dr (R09G033) Slidell ; Louisiana.
03/13/2025 07:00 PM UTC
25-20-1
7th St. Road Improvement-------------------------------The Parish requests a contractor to improve road surfaces by patching and overlay on 7th St., Mandeville, LA.,
03/13/2025 07:00 PM UTC
25-14-1
Adele Ln Sinkhole Repairs -----------The Parish requests a contractor to improve drainage by re-grouting catch basin, wrap pipe joint, remove/replace concrete driveway apron located on Adele Ln (R09A028); in Slidell, Louisiana.
03/12/2025 07:00 PM UTC
25-10-2
Excavator-----------------------The Parish extends this MATERIAL ONLY bid request to procure an Excavator. This equipment shall be a new piece of equipment. The Excavator will be procured for the Public Works Department.
03/12/2025 07:00 PM UTC
25-15-1
Browns Village Rd---------------------------------------------------------------------------The Parish requests a Contractor to improve the roadway by installing subsurface and patching road surface as specified on Browns Village Rd, in Slidell, LA.
03/12/2025 07:00 PM UTC
25-4-2
2025 District 7,9,12,13 Road Improvements ---- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: • Alberu Dr (R09G060) Slidell; • Bar St (R08M055) Slidell; • Buck Dr (R06H033) Pearl River; • Clara Dr (R09J006) Slidell; • Dogwood Dr (R07C067) Lacombe; • E Ruth Rd (R07H103) Lacombe; • Hemlock Dr (R06G021) Pearl River; • Jacqueline Dr (R09J003) Slidell; • LA Industries Pit Rd (R06F003) Pearl River; • Tulip Dr (R08F124) Section 30 Township 8S Range 15E Slidell; and • Yaupon Dr (R08M033) Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
03/11/2025 07:00 PM UTC