Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
10/07/2025 07:00 PM UTC
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
10/07/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
25-17-2
2025 District 1,2,3,5 Road Improvements-----------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified at the various locations: - Crater Lake Dr. (R01E006), Covington; - Shady Lake Dr. (R01E016), Covington; - B St. (R03L039), Covington; - Edna St. (R03K072), Covington; - N 3rd St. (R03K017), Covington; - Progress St. (R10D017), Covington; - Booth Rd. Ph. 2 (R02J006), Folsom; - Boyd Rd. Ph 2. (R01B002), Covington; - Rolling Hills Blvd. (R02H015), Folsom ; - Stoney Ct. (R02J006), Folsom; - Valley Ct. (R02K023), Folsom; and - Henry E Meiners Rd. (R04E079), Mandeville.
06/10/2025 07:00 PM UTC
25-34-1
Chess Dr Drainage--------------The Parish requests a Contractor to improve drainage by removing/replacing catch basin and removing/replacing concrete sidewalk as specified along Chess Dr. (R08I070) Slidell LA as required in the specifications.
06/10/2025 07:00 PM UTC
25-36-1
Barrymore St & Stanton Ln Drainage-------The Parish requires a qualified contractor to perform drainage improvements along Barrymore Street (R08V037) and Stanton Lane (R09A030) in Slidell, Louisiana. The work will include the removal and replacement of concrete panels and driveways, resealing catch basins, and cleaning, repairing, and resealing pipe joints. All work will be conducted in accordance with the project specifications.
06/05/2025 07:00 PM UTC
25-15-2
Safe Haven Cardinal Cove Cabin Renovations - Phase 1------ This work includes selective demolition of buildings and walkways, hazardous materials abatement, roof and siding replacement, and structural repairs to walkway and Living Unit roof structures.
06/04/2025 07:00 PM UTC
25-29-1
Southdown Tallow Creek Subdivisions Sinkhole Repair-----The Parish requests a Contractor to improve drainage by cleaning, sealing pipe joints and catch basins on Cole Ct. (R01C033); Southdown Ln. (R01K017); Silverthorne Ln. (R01K020) and Tallow Creek Blvd. (R01C027) located in Covington, Louisiana.
06/03/2025 07:00 PM UTC
25-31-1
Cross Gates Blvd Repair-----The Parish requests a Contractor to improve roadway by milling and overlaying, and patching various sections of road surface along Cross Gates Blvd, Slidell, LA as required in the specifications.
06/03/2025 07:00 PM UTC
25-33-1
Amber St. Drainage----The Parish requires a contractor to perform drainage improvements by cleaning, repairing, and resealing pipe joints, rebuilding and resealing catch basins along Amber St (R08L007), Slidell, LA, as required in the specifications.
06/03/2025 07:00 PM UTC
25-25-1
Pearl River Diversion Canal Stabilization----The purpose of this project is to install erosion control measures within an area at the end of the Pearl River Diversion Canal that was disturbed from previous dredging operations. These measures include hydroseeding, erosion control matting, and tree planting.
05/29/2025 07:00 PM UTC
25-32-1
Blue Crane No 1 Dr Drainage----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary for drainage improvements by removing and replacing drainage culverts and resealing catch basins as specified along Blue Crane No. 1 Dr (R08N040), Slidell, LA. The time period for completion of the project is thirty (30) calendar days.
05/29/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/28/2025 07:00 PM UTC