General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-24-2
DPW Asphalt Maintenance-------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified at the following locations: - Idlewild Pines Rd (R09C036) Slidell, LA; - Old Bayou Liberty Rd (R09H035) Slidell, LA; - Preachers Oak Ln (R09G064) Slidell, LA; - Robert Ln (R09G024) Slidell, LA; - Terrell Dr (R09H005) Slidell, LA; - Dorman King Rd (R05D020) Bush, LA; - Lake St (R10F034) Abita Springs, LA; - Branch Crossing Dr (R03H018) Covington, LA; - Camellia Dr (R03K084) Covington, LA; - Adolphus Rd South (R02Q011) Covington, LA; - Green Leaf Ln (R02P033) Covington, LA; - 8th St (R09I014) Slidell, LA; - Emile St (R09D030) Slidell, LA; - Joan Dr (R08A018) Pearl River, LA; - Salmen Ave (R09I015) Slidell, LA; - Slidell Ave (R09I011) Slidell, LA; - Lohman Rd (R07C018) Lacombe, LA; - St James St (R07G045) Lacombe, LA; - N Woodlake Way (R08H036) Pearl River, LA; - S Woodlake Way (R08H037) Pearl River, LA; and - Tammany Trace (R11A001) Abita Springs, LA.
08/12/2025 07:00 PM UTC
25-25-2
Hoover Drive & Lawes St. Improvements---------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 3,900 linear feet of asphaltic concrete along Hoover Dr and approximately 1,970 linear feet of asphaltic concrete along Lawes St. The project will also include the installation of surbsurface drainage improvements, as well as radius improvements at the intersection of Hoover Dr and Lawes St, in addition to new striping and replacment of signage. This work, as specified in these documents and construction plans, is located along Hoover Dr (R08M007) Section 12-13, Township 9S, Range 14E, and Lawes St (R08M005) Section 12, Township 9S, Range 14E, Slidell, LA 70461.
08/20/2025 07:00 PM UTC
25-26-2
One-Time Purchase of Electric Apparatus--------------------------------------St. Tammany Parish Government Department of Utilities is seeking bids for a one (1) time purchase of electrical apparatuses. All products shall be new, unused, and of current manufacture.
08/21/2025 07:00 PM UTC
25-23-2
Justice Center Cooling Tower---------------------Contractor shall provide the necessary labor, supervision, equipment, tools, and materials as required for the removal and replacement of the existing cooling tower located at the St.Tammany Justice Center, located at 701 N. Columbia St., Covington, LA 70433.
09/03/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
06/26/2018 07:00 AM UTC
311-00-18-28-2
2017 District 11 Rd Improvements...........................This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roadways by reconstructing, milling and overlaying, and/or overlaying with patching road surfaces as specified along Dummyline Rd (R06G006) Section 27 Township 7S Range 14E; Maxi Ln (R08A003) Section 3 Township 8S Range 14E; Murray Rd (R08A002) Section 2 Township 8S Range 14E.
06/20/2018 07:00 PM UTC
312-00-18-29-2
City Dr Drainage, Ph. 2...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve the drainage system along the existing roadside ditches. Work to include removing/replacing driveway culverts, drainage pipes, concrete walks and driveways, excavation, installing catch basins, and concrete headwalls as specified along City Dr. (R09J050) in Slidell, Louisiana (Section 22 Township 9S Range 14E).
06/19/2018 07:00 PM UTC
300-00-18-27-2
Christwood Blvd Ext.............The Contractor must provide all labor, equipment, tools, and materials necessary to perform the following: • Clearing and grubbing of the new right-of-way, including stripping topsoil, grubbing, and hauling off of trees, vegetation, and topsoil; • Construction of a two lane undivided roadway, cul-de-sac(s), and driveways, including roadway/driveway base and sub-base, striping, and signage; • Construction of roadside ditches, including culverts and sweeping of an existing ditch; • Removal of existing asphalt, including temporary stockpiling and haul-off; • Construction of a right turn lane from Brewster Road to Christwood Boulevard Extension, including pavement base and sub-base, curb and gutter, striping and signage; and • Other items as shown on the plans, specifications and supplemental specifications.
06/08/2018 07:00 PM UTC
300-00-18-19-2
Three Rivers Road Widening Phase 2............ The Contractor must provide all labor, equipment, tools, and materials necessary to perform road improvements as specified along Three Rivers Road in Covington, Louisiana, including: cold planing existing asphalt, widening and overlay of asphalt and concrete, drainage structures, driveway reconstruction, and striping and pavement signing.
05/30/2018 07:00 PM UTC
304-00-18-10-2
2018 District 4 Road Improvements ----- This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Black River Dr (R01J042) Section 42 Township 7S Range 10E; Fountain St (R04C039) Section 45 Township 8S Range 11E; Hawthorne Hollow (R01J041) Section 42 Township 7S Range 10E; Iberville St (R04A006) Section 34 Township 7S Range 11E; Magnolia Ridge Ct (R01J054) Section 42 Township 7S Range 10E; Magnolia St (R04C031) Section 45 Township 8S Range 11E; Pelican Ridge Dr (R01J053) Section 42 Township 7S Range 10E; Rock Bass Ct (R01J052) Section 42 Township 7S Range 10E.
05/22/2018 07:00 PM UTC
309-00-18-12-2
2018 District 9 Road Improvements ----- This is a District Capital Road Improvement Project for District 9. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Bristol Pl (R08N027) Section 38 Township 9S Range 15E; Camden St (R08N024) Section 38 Township 9S Range 15E; Carey Rd (R08A036) Section 10 Township 8S Range 14E; Piney Cir (R08N074) Section 39 Township 9S Range 15E; Spring Ridge Cir (R08N073) Section 39 Township 9S Range 15E; Starling Dr (R08N051) Section 39 Township 9S Range 15E; Starling Dr (R08N151) Section 16 Township 9S Range 15E.
05/22/2018 07:00 PM UTC
314-00-18-04-2
Queen Anne Drainage ----- This is a District Capital Drainage Improvement Project for District 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by installation of pipe to facilitate the installation of a flap gate near Queen Anne Dr (R09G038) Section 38, Township 9, Range 14 in Slidell, Louisiana.
05/22/2018 07:00 PM UTC
302-00-18-05-2
2017 District 2 Road Improvements.....................................This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Chandler Dr (R03J021) Section 42 Township 6S Range 11E; Dahlia St (R10D015) Section 36 Township 6S Range 11E; KC Camp St (R03F030) Section 6 Township 6S Range 10E; Landry Kate Ln (R03L170) Section 11 Township 7S Range 11E; Ruby St (R03K073) Section 42 Township 7S Range 11E; Third St (R03K017) Section 42 Township 7S Range 11E.
05/17/2018 07:00 PM UTC
303-00-18-01-2
2017 District 3 Road Improvements..........................This is a District Capital Road Improvement Project for Districts 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Foal Ct (R03D045) Section 13 Township 16S Range 10E; Orleans Ave (R02N004) Section 18 Township 5S Range 11E; Paris St (R02N016) Section 18 Township 5S Range 11E; Savannah Rd (R01G001) Section 4 Township 7S Range 10E; Wilkinson Rd (R01B011) Section 21 Township 6S Range 10E.
05/17/2018 07:00 PM UTC
561 - 570 of 897 Solicitations
1 2 53 54 55 57 59 60 61 89 90