25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
10/07/2025 07:00 PM UTC
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
10/07/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
015-25-17-78-2
Road Materials
01/11/2018 05:00 PM UTC
015-45-17-77-2
Plastic Culvert Pipe
01/11/2018 08:00 AM UTC
622-95-17-61-2
Bedico - Timberlane Interconnection....Installation of approximately 9,500 linear feet of 12-inch PVC and HDPE water main via open cut, directional drilling and jack and bore including tie ins, valves, fire hydrants, sampling stations and other ancilliary work in accordance with the drawings and specifications prepared by Professional Engineering Consultants Corporation dated June 6, 2017 and June 2017, respectively.
12/19/2017 08:00 PM UTC
419 -02-17-66-2
FEMA Disaster 4263 - Floor Repair.......................The Contractor must provide all labor, equipment, tools, and materials necessary for embankment repair, riprap installation, cross drain replacement, and pavement patching, in accordance with the specifications.
11/07/2017 08:00 PM UTC
321-00-17-68-2
Building B Buildout - Public Works Office Partition Panels......Permanent, hard-surface, non-powered office partition panels shall be furnished and installed, per the manufacturer’s specifications, to sub-divide large rooms into work stations on the 3rd floor of Building B at the St. Tammany Parish Government Administrative Complex (Koop Campus). All partition panels, materials, equipment, labor, and supervision required to complete the work, per the specifications (Section 09), shall be included.
10/19/2017 07:00 PM UTC
330-00-17-67-2
Tammany Trace Crack Repair..... This is a 2017 Capital Improvement Project. The work specified in this project will require the contractor to provide all labor, equipment, and materials necessary to improve the Tammany Trace multi-use path surfaces by milling and overlaying of asphaltic concrete and removing and replacing pavement including saturated soils, as specified along the Tammany Trace (R11A001) Section 42 Township 6S Range 11E, Section 36 Township 6S Range 11E, and Section 31 Township 6S Range 12E.
10/10/2017 07:00 PM UTC
339-00-17-63-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
10/04/2017 07:00 PM UTC
310-00-17-59-2
Forest Ln & Forest Ln Drainage................................. This is a District Capital Road Improvement Project for District 10. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road by reconstructing road surface. Work also included will be removing/ replacing storm drain pipes, catch basin, brisk walkway, clearing and grubbing, adjust man hole, and remove/relocate mailboxes as specified along Forest Ln (R04D091) Section 40 Township 7S Range 11E.
09/27/2017 07:00 PM UTC
440-14-17-62-2
Airfield Lighting and NAVAIDS ----- This project consists of the installation of airfield lighting and NAVAIDS for 18/36.
09/26/2017 07:00 PM UTC
522-00-17-60-2
HVAC Controllers Upgrade
09/26/2017 07:00 PM UTC