General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-14-2
Official Journal ----The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/06/2025 07:00 PM UTC
25-26-1
Lake Erie Dr Drainage -------The Parish requests a contractor to repair/replace/reseal existing structure(s) to restore area drainage by repair/replace/reseal drain pipe, catch basin, and sod, as specified along Lake Erie Dr (R08L056); located in Slidell, Louisiana.
05/06/2025 07:00 PM UTC
25-13-2
Coroner Chiller Addition--- This Project consists of the addition of one 200-ton Chiller and the furnishing and installation of new piping systems to connect to existing piping in existing building systems as shown on the drawings. The Project also consists of removing the existing and providing new Temperature Control devices as shown on drawings.
05/14/2025 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
622-04-17-31-2
1.7 Meter Belt Filter Press
04/26/2017 07:00 PM UTC
302-00-17-20-2
2017 District 2 Road Improvements ----- This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Arthur Rd (R03K034) Section 42 Township 6S Range 11E; Jenkins Ave (R03K061) Section 42 Township 6S Range 11E; Kustenmacher Rd (R03K020) Section 36 Township 6S Range 11E; Schiro Rd (R03G004) Section 2 Township 6S Range 11E; and St. Joseph Rd (R03G002) Section 2 Township 6S Range 11E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is 60 calendar days from the date the Notice to Proceed is issued.
04/25/2017 07:00 PM UTC
314-00-17-27-2
2017 Districts 8, 12, 13 & 14 Road Improvements...........This is a District Capital Road Improvement Project for Districts 8, 12, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Hunters Creek Rd (R08I010) Section 25 Township 8S Range 14E; El Centro St (R09J096) Section 22 Township 9S Range 14E; Park Place (R09J051) Section 44 Township 9S Range 14E; Indian Village Dr (R08P007) Section 15 Township 9S Range 15E; Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E; Ondine Ln (R09J032) Section 33 Township 9S Range 14E; Aviator St (R09D047) Section 3 Township 9S Range 14E; and James Crosby Rd (R08A012) Section 11 Township 8S Range 14E.
04/25/2017 07:00 PM UTC
304-00-17-26-2
Del Oaks Drive & Roger Storme Rd Road Improvements...........This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by raising the elevation of approx. 450 lf of roadway on Del Oaks by approx. 6.5 ft, and raising the elevation of approx. 400 lf of roadway on Roger Storme by approx. 6.5 ft, work to also include removal of trees, replacement of driveway aprons, and modifications for tie-ins as specified along Del Oaks Dr (R04A047) Section 54 Township 7S Range 11E ; Roger Storme (R04A001) Section 54 Township 7S Range 11E.
04/25/2017 07:00 PM UTC
300-00-17-13-2
Francis Rd Extension............................................... Clearing and grubbing, grading, drainage structures, cold planning asphaltic concrete, class II base course, superpave asphaltic concrete overlay, asphalt concrete pavement roadway and shoulders, open channel ditches, asphaltic shared use path, striping, signing, and related work.
04/18/2017 07:00 PM UTC
318-00-17-12-2
Safe Haven Renovations Quad A Asbestos Abatement ----- The abatement of ACM (floor tile, drywall walls and drywall ceilings) and the selected demolition of millwork and other building components, per the plans and specifications (Attachment “A”). All demolition activity shall follow the applicable, federal, state, and local guidelines and regulations. Contractor shall be responsible for removal, transportation and disposal of the demolition debris in accordance with all applicable federal, state and local regulations governing demolition and the demolition of structures containing hazardous substances. Project requires a Building Construction License and Hazardous Materials License. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. Contract time shall be 45 calendar days from the date of notice to proceed. All labor, supervision, materials, services, supplies, equipment, permits, transportation and disposal fees required to complete the work, per the plans and specifications (Attachment “A”), shall be included in the lump sum bid.
04/18/2017 07:00 PM UTC
010-07-17-29-2
2017 Official Journal
04/13/2017 07:00 PM UTC
010-01-17-25-2
SUV Chevrolet Suburban
04/13/2017 02:39 PM UTC
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements - This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
04/12/2017 07:00 PM UTC
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC
601 - 610 of 866 Solicitations
1 2 57 58 59 61 63 64 65 86 87