General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
06/24/2025 07:00 PM UTC
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041); Mandeville, Louisiana, 70448.
06/25/2025 07:00 PM UTC
25-19-2
St. John Church Rd Bridge----------------------------The Contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work as required in the construction drawings and specifications, located on St. John Church Rd (B02G002), Section 7, Township 5S, Range 10E, Folsom, LA.
07/01/2025 07:00 PM UTC
25-41-1
Terra Bella Curb Repair----The Parish requests a Contractor to perform roadway improvements by removing and replacing sections of concrete barrier curbs as specified along Inglewood Terrace (R01C059), Covington, LA; Bocage Ct (R01C039), Covington, LA; Melrose Ave (R01C042), Covington, LA.
07/02/2025 07:00 PM UTC
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
07/02/2025 07:00 PM UTC
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
07/08/2025 07:00 PM UTC
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along: − Bocage Ct (R01C039) Covington; − Fayedaye St (R01I048) Madisonville; − Melrose Ave (R01C042) Covington; and − Spring Haven Ln (R01J098) Madisonville.
07/09/2025 07:00 PM UTC
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened” fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
07/23/2025 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
310-00-17-59-2
Forest Ln & Forest Ln Drainage................................. This is a District Capital Road Improvement Project for District 10. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road by reconstructing road surface. Work also included will be removing/ replacing storm drain pipes, catch basin, brisk walkway, clearing and grubbing, adjust man hole, and remove/relocate mailboxes as specified along Forest Ln (R04D091) Section 40 Township 7S Range 11E.
09/27/2017 07:00 PM UTC
440-14-17-62-2
Airfield Lighting and NAVAIDS ----- This project consists of the installation of airfield lighting and NAVAIDS for 18/36.
09/26/2017 07:00 PM UTC
522-00-17-60-2
HVAC Controllers Upgrade
09/26/2017 07:00 PM UTC
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
09/21/2017 07:00 PM UTC
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
09/19/2017 07:00 PM UTC
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
09/14/2017 07:00 PM UTC
015-05-17-65-2
Road Signs
09/14/2017 07:00 PM UTC
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
09/12/2017 07:00 PM UTC
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay..... A. Lake Village Drainage Improvements o Selective tree removal o Demolition and removal of existing catch basins and storm drains. o Installation of new junction boxes and catch basins. o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter. o Roadway repair, sidewalk construction, and driveway construction. o Grading, erosion and sediment control, traffic control, and vegetation establishment. B. North Pearl Mill and Overlay o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans. o Guardrail system at W-15 Canal crossing o Striping
09/07/2017 07:00 PM UTC
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
09/05/2017 07:00 PM UTC
581 - 590 of 882 Solicitations
1 2 55 56 57 59 61 62 63 88 89