General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-109-103106.1
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. SDB Participation Goal 14% VBE Participation Goal 3% Engineer's Estimate: $2M - $4M
03/05/2026 06:00 PM UTC
FDC-109-103106.2
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. DGS Small Business Certification Required Engineer's Estimate: $400,000 - $600,000
03/05/2026 06:00 PM UTC
FDC-109-103106.3
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. DGS Small Business Certification Required Engineer's Estimate: $200,000 - $400,000
03/05/2026 06:00 PM UTC
FDC-109-103106.4
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. Project to include solar installation. SDB Participation Goal 11% VBE Participation Goal 3% Engineer's Estimate: $1M - $3M
03/05/2026 06:00 PM UTC
FDC-429-6133.1R
Pavement And Drainage Rehabilitation Of Multiple Sections Lackawanna State Park Benton & North Abington Townships Lackawanna County, Pennsylvania The work for this project will consist of repair, reclamation and repaving and drainage improvement work of the sections of the existing paved roadway and other incidental construction of South Shore Road, Lee Hill Drive and two parking lots as specified in the plan, within Lackawanna State Park in Benton and North Abington Townships, Lackawanna County, Pennsylvania. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: Over $1 Million
03/05/2026 06:00 PM UTC
FDC-415-10798.1
Pavement and Drainage Rehabilitation of West Shore Section Prompton State Park Clinton Township, Wayne County, Pennsylvania A. The work for this project will consist of repair, reclamation and repaving and drainage improvement work of the sections of the existing paved roadway and other incidental construction of West Shore Road and the loop as specified in the plan. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $300,000
03/19/2026 05:00 PM UTC
FDC-133-102948.1
Rehabilitation Of Marina Road, West Launch Road, & Rustic Campground Road Bald Eagle State Park Howard And Liberty Townships Centre County, Pennsylvania Work included under this contract consists of reclamation, paving, and grading work on Marina Road, West Launch Road, and Rustic Campground Road at Bald Eagle State Park as specified in the plan. SDB Participation Goal: 13 % VBE Participation Goal: 3 % Engineer's Estimate: $ 500,000- Over $1 Million
03/19/2026 05:00 PM UTC
FDC-114-10557.1
Silt Removal Little Pine State Park Cummings Township Lycoming County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. The approximate volume of sediment removal at Little Pine Lake at Little Pine State Park and the hauling and disposal of sediment material at designated disposal sites. b. The control and maintenance of all groundwater and surface water, as required, to complete all construction in the dry. c. Bituminous paving of park roads and repair of any park roads damaged during the silt removal operations. d. Implementation, maintenance, and removal of erosion and sedimentation control measures of the entire project sites. Base Bid 1 Base Bid 2 SDB Participation Goal: 23 % 23 % VBE Participation Goal: 3% 3 % Engineer's Estimate: Over $1 Million
03/19/2026 05:00 PM UTC
FDC-200-103850.1
Region 2 Paving Jennings, McConnells Mill and Moraine State Parks Franklin and Brady Townships, Butler County, Pennsylvania Slippery Rock Township, Lawrence County, Pennsylvania Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. SDB Participation Goal: 15% VBE Participation Goal: 3% Engineer's Estimate: $300,000-$700,000
03/19/2026 05:00 PM UTC
FDC-004-11390.1
Carroll Cabin Rehabilitation, Forbes Forestry District Wharton Township, Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $700,000
04/02/2026 05:00 PM UTC
FDC-004-11390.3
Carroll Cabin Rehabilitation, Forbes Forestry District Wharton Township, Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $28,000 - $30,000
04/02/2026 05:00 PM UTC
FDC-004-11390.4
Carroll Cabin Rehabilitation Forbes Forestry District Wharton Township Fayette County, Pennsylvania This project consists of the rehabilitation of the Historic Carroll Cabin in Forbes State Forest. In addition to revitalizing the existing building, efforts will include construction of a new restroom addition, a new water well system, and a new on-lot sewage treatment system. This project involves work which must be performed by contractors and trades having particular skill and sensitivity for handling historic building materials with care and attention to preservation and quality of details. Awarded contractor shall submit preservation contractor qualifications at the onset of construction. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $70,000
04/02/2026 05:00 PM UTC
FDC-007-11123.1
Structure Replacement, Bridge No. 07-0069, Havice Valley Service Road Over Havice Creek Forestry District 07, Bald Eagle State Forest Armaugh Township, Mifflin County, Pennsylvania Demolition of the existing single span structure carrying Havice Valley Service Road over Havice Creek. Demolition also includes the removal of an existing steel road gate at the south/east approach. Proposed structure is a single span non-composite rolled steel I-beam superstructure with transverse nail-laminated timber deck atop cast-in-place reinforced concrete cantilever abutments. Replacement also includes driving surface aggregate, rock lining, construction of bridge railing, guide rail and end treatments and construction of a single locking steel road gate at the south/east approach. DGS Small Business Certification Required Engineer's Estimate: $500,000 - $700,000
04/02/2026 05:00 PM UTC
13 Solicitations

Closed Solicitations

Number Deadline
FDC-320-100203.3
Plumbing Construction King's Gap Environmental Education Center Dickinson Township, Cumberland County, Pennsylvania Work included under this contract consists of the plumbing construction of the water tank replacement. DGS Small Business Certification Required Engineer's Estimate: Under $25,000.00
07/13/2023 06:00 PM UTC
FDC-320-100203.4
Electrical Construction King's Gap Environmental Education Center Dickinson Township, Cumberland County, Pennsylvania Work included under this contract consists of the electrical construction of the water tank replacement. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
07/13/2023 06:00 PM UTC
FDC-411-102176.4R
Project Name: Electrical Construction, McConnell Hall Rehabilitation State Park/Forest: Nolde Forest Environmental Education Center Township/County: Camru Township, Berks County, Pennsylvania Project Description Work included under this contract consists of demolition of some existing interior light fixtures, replacing exterior light fixtures and adding new some new, replacing some electrical wiring and running new circuits, replacing lighting controls, replacing emergency lighting, replacing hand dryers, updating the existing electrical panel, replacing some light bulbs, and replacing a couple of receptacles. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
07/06/2023 06:00 PM UTC
FDC-305-10755.1
Dam Control Tower, Masonry Veneer Repair Cowans Gap State Park Todd Township, Fulton County Work included under this contract consists of the restoration of stone masonry veneer where sections of stone masonry walls exhibit loose stones, or missing stones and preparing and repoints joints in the stone masonry veneer as shown on the contract drawings. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
06/22/2023 06:00 PM UTC
FDC-210-103441.1
Force Main Replacement LS7 Moraine State Park Muddy Creek Township, Butler County Work included under this contract consists of the complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/22/2023 06:00 PM UTC
FDC-414-102033.1R
Roadway Rehabilitations Promised Land State Park The work of this project will take place along Pickerel Point Road, North Shore Road and Ridgefield Point Road in Promised Land State Park located in Blooming Grove, Greene and Palmyra Townships, Pike County. Work included under this contract includes the full depth reclamation and repaving of approximately 1.1 miles of Pickerel Point Road, and the replacement of seven (7) existing culvert pipes and restoration of the ditch lines along the side of the road for storm water drainage improvements. Work also includes asphalt base repairs and installation of an asphalt wearing course along approximately 3 miles of North Shore Road and 0.4 miles of Ridgefield Road, and the rehabilitation of the Ridgefield Road over Big Inlet bridge. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
06/08/2023 06:00 PM UTC
FDC-115-103057.1R
General Construction, Install Electric Dam Gate Operators and Generator Lyman Run State Park West Branch Township, Potter County, Pennsylvajia 1. Work included under this contract consists of the complete construction and installation work for the following: a. Structural underwater inspection of water structures consisting of drawdown structure, upstream conduit, control tower, labyrinth spillway weir, and stilling basin. Work will also consist of design and installing a bulkhead in underwater conditions at the inlet structure after inspection of the inlet is completed. b. Remove and replace both upstream and downstream sluice gate stems in the control tower that are a part of the sluice gate system. c. Install two new electric operators and actuators sufficient enough to open the existing 96” sluice gates upstream and downstream in the control tower. d. Provide services of a Rodney Hunt and Rotork representative or approved equal to adjust the wedges of the sluice gate and set up the settings of the operators to run properly using the generator in FDC- 115-103057.4 contract. e. Have the contracted divers remove bulkhead after all work is completed and approved. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-115-103057.4R
Electrical Construction Lyman Run State Park West Branch Township, Potter County, Pennsylvania The work under this project consists of providing a mobile generator system, generator interface kiosk with quick-connect disconnect switch, manual transfer switch, and actuator disconnect switches at Control Tower on the Dam at Lyman Run State Park. Work shall include all wiring and conduit, and utilization and demonstration of the mobile generator system in operating the gate actuators at the end of construction for start-up, training, and commissioning purposes. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-303-103059.1
Stream and Pedestrian Bridge Restoration Caledonia State Park Green and Franklin Townships, Franklin and Adams Counties, Pennsylvania Work included under this contract consists of restoring four (4) pedestrian bridges and restoration activities of two (2) streams. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
201 - 210 of 228 Solicitations
1 2 15 16 17 18 19 21 23