Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
T25PS01
Reservoir Lower Yard & Non-Revenue Track Optimization
The Massachusetts Bay Transportation Authority is soliciting architectural and engineering services for the 30-100% design of the Green Line Reservoir Lower Yard & Non-Revenue Track Optimization Project in Brookline, MA.
| 09/22/2025 06:00 PM UTC |
A26CN05-DB RFQ
DB Green Line B Branch Short Term Accessibility Improvements, Boston MA
This Project will complete final design and construction to create accessible stations along the Green Line B-Branch in Boston, MA. Work will consist of rebuilding station platforms to raise and widen boarding areas to achieve accessibility requirements to assure that each station offers compliant pathways to the Public Right-of-Way. The project will also improve safety by separating platforms from vehicular traffic. Additionally, the project will realign the tracks at Blandford portal to enhance safety and operations.
| 09/26/2025 03:00 PM UTC |
X23PS01
E. Branch Accessibility and Capacity Improvements 15-100% Design - The Scope of Services includes but is not limited to: accessible station designs for Mission Park, Riverway, and Heath Street stations, new transitway and track improvements, updated OCS including new poles and upsized contact wire, and traction power system upgrades including
new TPSS E2.
.
| 10/08/2025 06:00 PM UTC |
Number | Deadline |
---|---|
A26CN06R CMAR Foxboro Station Trade RFQ
A26CN06 CMAR Foxboro Station - Trade RFQ
The purpose of this proposed work is to provide a fully accessible, code compliant Foxboro Station, as well as a temporary event platform on the neighborhood (east) side of the tracks. The project scope includes renovations to MBTA’s Foxboro Station including, but not limited to: The construction of a temporary 600 linear foot modular aluminum platform on the neighborhood (east) side of the tracks, and the construction of a new permanent station on the stadium (west) side of the tracks which includes a canopy and an 800 linear foot platform.
Request for Qualifications for the following Trades:
Miscellaneous and Ornamental Irons,
Painting
Electrical Work
| 09/11/2025 03:00 PM UTC |
R14CN02 CMAR Trade RFQ Re-advertisement
CMAR 200 Newport Ave Operations Control Center - Trade RFQ
Request for Qualifications for the following Trades:
Roofing and Flashing
Acoustical Tile
Painting
| 08/28/2025 03:00 PM UTC |
P92PS01 - Request for Qualifications
P92PS01 - South Boston Power Complex Study
The scope of services includes feasibility planning and concept development services for the South Boston Power Complex (SBPC) site, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems. Project tasks may include site data collection, concept development, conceptual site plan development, and alternatives evaluation.
| 08/14/2025 06:00 PM UTC |
A26CN05 DB - RFLOI
DB Green Line B Branch Short Term Accessibility Improvements, Boston, MA
The purpose of the DB Green Line B Branch Short Term Accessibility Improvements Project is to upgrade inaccessible station platforms to meet accessibility standards for nine (9) station locations along Commonwealth Avenue in the City of Boston on the B-Branch. The project will also realign the tracks at Blandford Portal to enhance safety and operations. Barriers to accessibility at multiple grade crossings will be addressed, ensuring safer and more convenient use for passengers.
| 08/12/2025 03:00 PM UTC |
R14CN02 CMAR Trade RFQ
CMAR 200 Newport Ave Operations Control Center - Trade RFQ
Request for Qualifications for the following Trades:
Roofing and Flashing
Acoustical Tile
Painting
Fire Protection Sprinkler Systems
Heating, Ventilating & Air-Conditioning
Plumbing
Electrical Work
The Project includes the proposed 8th floor dispatch center at 200 Newport Ave is designed for the following: seven (7) Rapid Transit Line (RTL) dispatcher workstations; five (5) Light Rail dispatcher workstations; eight (8) bus dispatcher workstations; one (1) designated dispatcher training console for Red, Orange, Blue, Green and Bus for a total of five (5) instructor dispatcher training consoles; three (3) OCC supervisor workstations; an area with four (4) power department dispatchers; a desk each for Transit Police, Fire Department, RTL Vehicle Maintenance, Light Rail Vehicle Maintenance, two (2) desks for the Operations Information Officer (OIO) and one (1) desk for the OIO Supervisor. The opposite side of the 8th floor would have five (5) Security Operations Center (SOC) controller workstations, and a room with four (4) Maintenance Control Center (MCC) personnel workstations, several manager’s offices, and a large conference room to support an Emergency Operation Center (EOC).
| 08/07/2025 03:00 PM UTC |
Y90PS01 -Request for Qualifications
Y90PS01 – Design and Engineering Services for Systemwide Pump Room Upgrades
Design and Engineering Services for the MBTAs Engineering and Capital Division. Design and implementation of improvements to various pump rooms. General improvements may include civil, structural, electrical, architectural improvements; replacement of dysfunctional pumps; door replacement; SCADA installation; communications; environmental; and stakeholder engagement.
| 07/31/2025 06:00 PM UTC |
Z91PS88-92 -Request for Qualifications
System Transit Bus Infrastructure Improvement Program
Planning, design, and construction of various bus infrastructure components on an “on-call” as-needed basis. Systemwide Bus infrastructure includes but is not limited to: accessibility needs, network de-design, infrastructure improvements including lanes, stops, signals etc., amenities, signage, and upgraded technology.
| 07/15/2025 06:00 PM UTC |
A26CN06R Trade RFQ Re-advertisement
CMAR Symphony Station Improvements Project - TRADE RFQ
Re-advertisement of Trade Request for Qualifications for the following Trades:
Miscellaneous and Ornamental Iron
Tile
Acoustical Tile
Resilient Floors
Painting
Elevators
Fire Protection Sprinkler Systems
On May 7, 2025 the MBTA issue a Trade RFQ for the CMAR Symphony Station Improvements Project, in responses to the RFQ, the MBTA received fewer than three (3) SOQs for the trade categories listed above.
The MBTA is re-inviting firms to submit SOQs for the trade categories listed above. Trade Contractors who previously submitted SOQs in response to the RFQ issued on May 7, 2025 do not need to resubmit their SOQ, the MBTA will retain the previous SOQ submission.
The project scope includes renovations to MBTA’s Symphony Station including, but not limited to: installation of four (4) elevators; raising the existing platforms for level boarding; renovation and expansion of inbound and outbound lobbies; two (2) public toilet rooms; new egress stairs and headhouses; renovation of existing stairs and expansion of the mezzanine; upgrade of life safety systems; lighting; finishes; wayfinding; foundation improvements, including support of excavation requirements and underpinning; site and landscaping improvements; site amenities and protective bollards, renovated plazas for inbound station entrances; raised bike lanes, replaced sidewalks and roadway along Massachusetts Avenue; significant electrical and communication upgrades including but not limited to replacement of DC duct banks along platforms, electrical backup service from Prudential, including new substation and emergency mineral insulated (MI) cabling, and transformer vault.
| 07/09/2025 03:00 PM UTC |
P09PS01
Design and Engineering Services for D-Branch Traction Power Upgrades for Increased Capacity
Upgrade the traction power infrastructure, overhead contact system (OCS), and underground communication systems along the D Branch between the portal area outside of the Central Tunnel at Fenway Station area in Boston to the end of the D-Branch at the Riverside Vehicle Maintenance Facility in Newton (approximately 9.1 miles).
| 06/27/2025 06:00 PM UTC |
V70PS05
Engineering and Project Management Professional Services for Commuter Rail New Locomotive
The Scope of Services includes but are not limited to: vehicle specification development; vehicle builder selection RFP support; assessment of existing Commuter Rail infrastructure; design reviews, tests, and inspections; project management; configuration management; administration of warranty.
| 06/20/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.