General Info

Business Logo

Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division

10 Park Plz, Boston, MA 02116-3933
(617) 222-3200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
R16PS03 - Request For Qualification
The Alewife Garage Structural Improvements project will implement an extensive structural repairs plan to extend the garage’s service life. The plan includes both immediate and base repairs to structural and waterproofing systems. The project will include structural repairs, monthly structural inspections, and construction-phase services.
08/24/2026 03:00 PM UTC
Y42CN01 DB RFP Technical Proposal Page
Y42CN01 DB Red Line Hi-Rail Access Tunnel Cambridge, MA The purpose of this project is to provide a new access point to the Red Line northwest of the Charles River that will accommodate equipment, labor, and material delivery into the tunnel more efficiently. The MBTA Red Line subway northwest of the Charles River consists of a below grade tunnel with access for equipment, such as Hi-Rail vehicles, and maintenance only available just east of the Kendall/MIT station, some four miles from Alewife Station at the First Street gate. With the existing tunnel being over 25-ft below ground surface near Alewife, a tunnel is the most practical means of providing access from grade to the tunnel below for access.
11/19/2026 04:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
P62CN02 CMAR Trade RFQ - Ashmont Infrastructure Upgrades Trade Package
CMAR Ashmont and Mattapan Infrastructure Upgrades, Boston, MA Ashmont Infrastructure Upgrades Trade Package The Purpose of the Project is to replace the Traction Power Equipment and Building Systems in order to return the facility back to a state of good repair. The capacity of the Ashmont TPSS will be expanded to meet the additional power requirements of the expanded Codman Yard and the upgrade Mattapan High Speed Line. The project scope of the Ashmont TPSS Replacement Project will include a phased full replacement of the traction power electrical equipment as well selected replacement and upgrades of the building structure (roof, masonry) and internal building systems including heating, ventilation, low voltage electrical, plumbing and safety systems. This substation will remain in service during the phased replacement. It is imperative that the service of the substation not be interrupted as it is the power source for the Mattapan Trolleys and Codman Yard. Request for Qualifications for the following Trades: Masonry Work Miscellaneous and Ornamental Irons, Waterproofing, Damp-proofing and Caulking Roofing and Flashing Painting Plumbing HVAC Electrical Work
05/05/2026 03:00 PM UTC
A34CN01- CMAR DTX/CENTRAL Trade RFQ
CMAR Downtown Crossing Phase 2 and Central Square Station Accessibility Improvements, The purpose of this proposed work is to provide three new accessible transfer elevators at Downtown Crossing and Park Street Stations, and at Central Square Station, replace the existing outbound platform elevator and install 2 new elevators, while providing a more accessible, code compliant station. Request for Qualifications for the following Trades: Masonry Work Miscellaneous and Ornamental Irons Waterproofing, Damp-proofing and Caulking Roofing and Flashing Painting Terrazo Tile Elevators Plumbing Heating, Ventilating & Air-Conditioning Fire Protection Sprinkler Systems Electrical Work
04/30/2026 03:00 PM UTC
R16PS02 - Request for Qualification
The Massachusetts Bay Transportation Authority is soliciting Design Services for the demolition of existing Lake Street yard tracks, carhouse, catenary and Boston College Station, followed by construction of a new Traction Power Substation building within the yard and reconstruction of the Boston College station. A new Eversource switchgear is to also be installed within the yard.
03/16/2026 03:00 PM UTC
R16CN02 CMAR RFQ
R16CN02 CMAR Permanent Employee Facilities Project Description - The MBTA has identified many office trailers occupied by Operations Staff that are out of state of good repair and beyond their useful life. This project will provide new permanent employee facilities to both replace the existing trailers and also to provide space for future operations workforce and multiple MBTA properties.
01/29/2026 04:00 PM UTC
Z91PS96-98 Request for Qualifications
-General Engineering Consulting Services for Owner Project Manager Services (OPM) The Massachusetts Bay Transportation Authority is soliciting Owner Project Manager (OPM) Services for complex capital projects using Construction Management at Risk services under MGL Ch. 149A to provide several administrative and technical support including but not limited to assisting, preparing, and reviewing of items during Construction Manager at Risk selection process, leading, assisting, and reviewing preconstruction and construction activities, reviewing and advising on commissioning and closeout phase activities and other services. The scope of services will be authorized on a task order basis by phase.
12/15/2025 07:00 PM UTC
Z91PS83-85 Request for Qualification
The Massachusetts Bay Transportation Authority is soliciting qualified multidiscipline consulting firms or teams, with proven experience to provide professional services including laboratory and in-field construction materials testing and inspection services on an on-call, as needed basis. These services are expected to be provided at MBTA properties under construction or renovation. The Consultant/s must be able to work closely with the Authority and other interested parties in order to provide such services in a timely and effective manner.
12/10/2025 07:00 PM UTC
Z91PS93-95 Request for Qualifications
General Engineering Consult (GEC) Services for Third Party Commissioning The Authority is seeking a qualified multidisciplined consulting firm or team, with proven experience to provide professional commissioning services including planning, design, and construction related services including resident inspection, on and on-call, as needed basis.
12/03/2025 07:00 PM UTC
R21PS03 - Request for Qualifications
Engineering, Architectural and Engineering Services for Green Line Inner Belt Yard Expansion Project The scope of work is for architectural and engineering services for 15-100% bid phase and construction phase services for the Green Line Inner Belt Yard Expansion Project located in Sommerville, MA.
11/07/2025 07:00 PM UTC
A26CN05-DB RFQ
DB Green Line B Branch Short Term Accessibility Improvements, Boston MA This Project will complete final design and construction to create accessible stations along the Green Line B-Branch in Boston, MA. Work will consist of rebuilding station platforms to raise and widen boarding areas to achieve accessibility requirements to assure that each station offers compliant pathways to the Public Right-of-Way. The project will also improve safety by separating platforms from vehicular traffic. Additionally, the project will realign the tracks at Blandford portal to enhance safety and operations.
10/31/2025 03:00 PM UTC
X23PS01
E. Branch Accessibility and Capacity Improvements 15-100% Design - The Scope of Services includes but is not limited to: accessible station designs for Mission Park, Riverway, and Heath Street stations, new transitway and track improvements, updated OCS including new poles and upsized contact wire, and traction power system upgrades including new TPSS E2. .
10/08/2025 06:00 PM UTC
11 - 20 of 51 Solicitations
2 4 5 6