General Info

Business Logo

Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division

10 Park Plz, Boston, MA 02116-3933
(617) 222-3200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Y42CN01 DB RFQ
The purpose of the project is to provide a new access point to the Red Line at Alewife Station. The MBTA Red Line subway northwest of the Charles River operates in a below grade tunnel. Maintenance access is four miles from Alewife Station at the First Street gate. The existing tunnel is over 25-ft below ground surface near Alewife. This Project will complete final design and construction to create the new access point to the Red Line Tunnel in Cambridge, MA near Alewife Station. The Base Technical Concept (“BTC”) consists of a 15-ft wide paved access road, approximately 150 feet in length, followed by a boat section ramp approximately 130-ft long that provides below-grade access to a new tunnel that ties into the existing Red Line tunnel approximately 150-ft from the end of the boat section ramp. The BTC includes constructing the new tunnel structure and boat section ramp within a support of excavation system (SOE). The proposed SOE system includes sheet piling walls, internal bracing, and a working base slab over a jet grout bottom plug. Soil within the excavation area is contaminated. A Final Release Abatement Measure (RAM) needs to be developed that follows the methods described in the Draft RAM plan submitted to the Massachusetts Department of Environmental Protection (MassDEP) in August 2024 or the Public Involvement Plan (PIP) process needs to be re-initiated. Dewatering will also be required as part of the excavation and water needs to be properly discharged. The tunnel and boat section ramp structures are detailed for conventional form and pour concrete methods starting with the base slab and progressing upward to the top of the boat walls and the tunnel roof slab. The final grading and tree planting plan needs to be in accordance with the Order of Conditions issued by the Cambridge Conservation Commission on January 6, 2025 (MassDEP File #123-0325), otherwise the process to receive a new Order of Conditions needs to be re-initiated. To provide access to the existing Red Line Tunnel, two openings approximately 14-ft high x 40-ft wide are included in the BTC into the side of the existing tunnel to connect the new Access Tunnel. This operation will include the partial demolition of the existing Red Line Tunnel slurry walls. Truck pads are included in the BTC within the existing Red Line Tunnel at each of the two openings to provide a designated “on-track” entrance point and “off-track” exit point for equipment and hi-rail vehicles. The BTC equips the new tunnel with a manually operated flood door to prevent unauthorized personnel from accessing the tunnel and to prevent water ingress. The proposed electrical scope of work includes new security devices, lighting within the new tunnel, and electrical modifications within the existing Red Line tunnel.
06/02/2026 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
X23PS01
E. Branch Accessibility and Capacity Improvements 15-100% Design - The Scope of Services includes but is not limited to: accessible station designs for Mission Park, Riverway, and Heath Street stations, new transitway and track improvements, updated OCS including new poles and upsized contact wire, and traction power system upgrades including new TPSS E2. .
10/08/2025 06:00 PM UTC
T25PS01
Reservoir Lower Yard & Non-Revenue Track Optimization The Massachusetts Bay Transportation Authority is soliciting architectural and engineering services for the 30-100% design of the Green Line Reservoir Lower Yard & Non-Revenue Track Optimization Project in Brookline, MA.
09/22/2025 06:00 PM UTC
A26CN06R CMAR Foxboro Station Trade RFQ
A26CN06 CMAR Foxboro Station - Trade RFQ The purpose of this proposed work is to provide a fully accessible, code compliant Foxboro Station, as well as a temporary event platform on the neighborhood (east) side of the tracks. The project scope includes renovations to MBTA’s Foxboro Station including, but not limited to: The construction of a temporary 600 linear foot modular aluminum platform on the neighborhood (east) side of the tracks, and the construction of a new permanent station on the stadium (west) side of the tracks which includes a canopy and an 800 linear foot platform. Request for Qualifications for the following Trades: Miscellaneous and Ornamental Irons, Painting Electrical Work
09/11/2025 03:00 PM UTC
R14CN02 CMAR Trade RFQ Re-advertisement
CMAR 200 Newport Ave Operations Control Center - Trade RFQ Request for Qualifications for the following Trades: Roofing and Flashing Acoustical Tile Painting
08/28/2025 03:00 PM UTC
P92PS01 - Request for Qualifications
P92PS01 - South Boston Power Complex Study The scope of services includes feasibility planning and concept development services for the South Boston Power Complex (SBPC) site, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems. Project tasks may include site data collection, concept development, conceptual site plan development, and alternatives evaluation.
08/14/2025 06:00 PM UTC
A26CN05 DB - RFLOI
DB Green Line B Branch Short Term Accessibility Improvements, Boston, MA The purpose of the DB Green Line B Branch Short Term Accessibility Improvements Project is to upgrade inaccessible station platforms to meet accessibility standards for nine (9) station locations along Commonwealth Avenue in the City of Boston on the B-Branch. The project will also realign the tracks at Blandford Portal to enhance safety and operations. Barriers to accessibility at multiple grade crossings will be addressed, ensuring safer and more convenient use for passengers.  
08/12/2025 03:00 PM UTC
R14CN02 CMAR Trade RFQ
CMAR 200 Newport Ave Operations Control Center - Trade RFQ Request for Qualifications for the following Trades: Roofing and Flashing Acoustical Tile Painting Fire Protection Sprinkler Systems Heating, Ventilating & Air-Conditioning Plumbing Electrical Work The Project includes the proposed 8th floor dispatch center at 200 Newport Ave is designed for the following: seven  (7) Rapid Transit Line (RTL) dispatcher workstations; five (5) Light Rail dispatcher workstations; eight (8) bus dispatcher workstations; one (1) designated dispatcher training console for Red, Orange, Blue, Green and Bus for a total of five (5) instructor dispatcher training consoles; three (3) OCC supervisor workstations; an area with four (4) power department dispatchers; a desk each for Transit Police, Fire Department, RTL Vehicle Maintenance, Light Rail Vehicle Maintenance, two (2) desks for the Operations Information Officer (OIO) and one (1) desk for the OIO Supervisor. The opposite side of the 8th floor would have five (5) Security Operations Center (SOC) controller workstations, and a room with four (4) Maintenance Control Center (MCC) personnel workstations, several manager’s offices, and a large conference room to support an Emergency Operation Center (EOC).
08/07/2025 03:00 PM UTC
Y90PS01 -Request for Qualifications
Y90PS01 – Design and Engineering Services for Systemwide Pump Room Upgrades Design and Engineering Services for the MBTAs Engineering and Capital Division. Design and implementation of improvements to various pump rooms. General improvements may include civil, structural, electrical, architectural improvements; replacement of dysfunctional pumps; door replacement; SCADA installation; communications; environmental; and stakeholder engagement.
07/31/2025 06:00 PM UTC
Z91PS88-92 -Request for Qualifications
System Transit Bus Infrastructure Improvement Program Planning, design, and construction of various bus infrastructure components on an “on-call” as-needed basis. Systemwide Bus infrastructure includes but is not limited to: accessibility needs, network de-design, infrastructure improvements including lanes, stops, signals etc., amenities, signage, and upgraded technology.
07/15/2025 06:00 PM UTC
A26CN06R Trade RFQ Re-advertisement
CMAR Symphony Station Improvements Project - TRADE RFQ Re-advertisement of Trade Request for Qualifications for the following Trades: Miscellaneous and Ornamental Iron Tile Acoustical Tile Resilient Floors Painting Elevators Fire Protection Sprinkler Systems On May 7, 2025 the MBTA issue a Trade RFQ for the CMAR Symphony Station Improvements Project, in responses to the RFQ, the MBTA received fewer than three (3) SOQs for the trade categories listed above. The MBTA is re-inviting firms to submit SOQs for the trade categories listed above. Trade Contractors who previously submitted SOQs in response to the RFQ issued on May 7, 2025 do not need to resubmit their SOQ, the MBTA will retain the previous SOQ submission. The project scope includes renovations to MBTA’s Symphony Station including, but not limited to: installation of four (4) elevators; raising the existing platforms for level boarding; renovation and expansion of inbound and outbound lobbies; two (2) public toilet rooms; new egress stairs and headhouses; renovation of existing stairs and expansion of the mezzanine; upgrade of life safety systems; lighting; finishes; wayfinding; foundation improvements, including support of excavation requirements and underpinning; site and landscaping improvements; site amenities and protective bollards, renovated plazas for inbound station entrances; raised bike lanes, replaced sidewalks and roadway along Massachusetts Avenue; significant electrical and communication upgrades including but not limited to replacement of DC duct banks along platforms, electrical backup service from Prudential, including new substation and emergency mineral insulated (MI) cabling, and transformer vault.
07/09/2025 03:00 PM UTC
11 - 20 of 42 Solicitations
2 4 5