General Info

Business Logo

Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division

10 Park Plz, Boston, MA 02116-3933
(617) 222-3200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Y42CN01 DB RFQ
The purpose of the project is to provide a new access point to the Red Line at Alewife Station. The MBTA Red Line subway northwest of the Charles River operates in a below grade tunnel. Maintenance access is four miles from Alewife Station at the First Street gate. The existing tunnel is over 25-ft below ground surface near Alewife. This Project will complete final design and construction to create the new access point to the Red Line Tunnel in Cambridge, MA near Alewife Station. The Base Technical Concept (“BTC”) consists of a 15-ft wide paved access road, approximately 150 feet in length, followed by a boat section ramp approximately 130-ft long that provides below-grade access to a new tunnel that ties into the existing Red Line tunnel approximately 150-ft from the end of the boat section ramp. The BTC includes constructing the new tunnel structure and boat section ramp within a support of excavation system (SOE). The proposed SOE system includes sheet piling walls, internal bracing, and a working base slab over a jet grout bottom plug. Soil within the excavation area is contaminated. A Final Release Abatement Measure (RAM) needs to be developed that follows the methods described in the Draft RAM plan submitted to the Massachusetts Department of Environmental Protection (MassDEP) in August 2024 or the Public Involvement Plan (PIP) process needs to be re-initiated. Dewatering will also be required as part of the excavation and water needs to be properly discharged. The tunnel and boat section ramp structures are detailed for conventional form and pour concrete methods starting with the base slab and progressing upward to the top of the boat walls and the tunnel roof slab. The final grading and tree planting plan needs to be in accordance with the Order of Conditions issued by the Cambridge Conservation Commission on January 6, 2025 (MassDEP File #123-0325), otherwise the process to receive a new Order of Conditions needs to be re-initiated. To provide access to the existing Red Line Tunnel, two openings approximately 14-ft high x 40-ft wide are included in the BTC into the side of the existing tunnel to connect the new Access Tunnel. This operation will include the partial demolition of the existing Red Line Tunnel slurry walls. Truck pads are included in the BTC within the existing Red Line Tunnel at each of the two openings to provide a designated “on-track” entrance point and “off-track” exit point for equipment and hi-rail vehicles. The BTC equips the new tunnel with a manually operated flood door to prevent unauthorized personnel from accessing the tunnel and to prevent water ingress. The proposed electrical scope of work includes new security devices, lighting within the new tunnel, and electrical modifications within the existing Red Line tunnel.
06/02/2026 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
H32PS03 - Request for Qualifications
Program Management / Construction Management (PM/CM) for the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project The PM/CM Services will supplement the MBTA North Station Draw 1 Management team and act as an integrated team. The PM/CM will assist the MBTA in creation of performance metrics and management services, scope, cost and schedule monitoring and reporting, development of a Project Management Plan, collaborate with the MBTA’s Owners Representative, and provide additional field staff to supplement the MBTA field leads, and assist with change order/claim negotiation strategies.
04/08/2025 06:00 PM UTC
H32CN01- DB RFLOI
DB North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston, Cambridge and Somerville, MA The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A.
03/19/2025 03:00 PM UTC
BUSPS15-16
General Engineering Consulting Services for Bus Maintenance Planning Services, Project Management Assistance, Procurement Assistance, Maintenance, Engineering Services, Quality Assurance and Audits, Industry Innovations and Environmental Assistance.
02/19/2025 07:00 PM UTC
R27CN01 CMAR Trade RFQ - Package 1 and 2B
CMAR Green Line Riverside Vehicle Maintenance Facility (“VMF”) Upgrades, Somerville, Newton, MA Upgrade, modify and prepare the Green Line Riverside (Newton) and Innerbelt (Somerville) Vehicle Maintenance Facilities buildings to receive, assemble, test and commission, as well as support maintenance operations for the new low-floor Type 10 light-rail vehicles (LRVs). The work encompasses track, pits and work platforms extension, re-sectionalization of overhead catenary, floor structure reinforcement, mechanical-HVAC, mechanical-hoist, fire protection, contaminated materials management, electrical, plumbing and stinger system upgrade.
12/27/2024 04:00 PM UTC
Y92PS11-15 SOQs
Engineering Services for the Inspection and Load Rating of the Authority's System-wide Tunnel comprising of the Orange Line, Blue Line, Red Line, Green Line, Silver Line, Harvard Busway, Commuter Rail, Amtrak and the abandoned tunnels on these lines.
12/20/2024 07:00 PM UTC
R14CN02 - CMAR Request for Qualifications
CMAR 200 Newport Ave Operations Control Center (OCC) Quincy MA. The scope of this project includes design and construction of a new Operations Control Center located on the 8th floor of 200 Newport Avenue in Quincy, MA. The 200 Newport OCC will replace the existing OCC at 45 High St and will render that location the backup. The OCC space will accommodate heavy rail ops, light rail ops, bus ops, vehicle maintenance dispatchers, public information officials, emergency response officials, etc. Also to be included in this project (adjacent to the OCC) are space for the Security Operations Center, Maintenance Control Center, and Power Dispatchers, conference spaces, Operations training spaces, etc. Scope of work includes architectural, MEP, FP alterations to the space to accommodate the above.
12/02/2024 04:00 PM UTC
Y12PS01 SOQs
Design & Engineering Services for Blue Line Airport Portal Flood Protection The Massachusetts Bay Transportation Authority (MBT A) Engineering and Capital Division is requesting proposals from multi-disciplined engineering firms/teams to provide design and engineering services for the Airport Portal Flood Protection project. MBTA has identified the need to address flood vulnerability in the MBTA's Blue Line and the tunnel portal west of Airport Station by designing and implementing a hinged portal flood door. The selected consultants will exhibit a depth of experience and expertise in the design and construction of tunnel, rail, power, and resiliency infrastructure to support MBTA on this project.
10/15/2024 06:00 PM UTC
Z91PS80-81 Request for Qualifications
Z91PS80-81 Owner's Project Manager (OPM) Services on a Task Order Basis The Massachusetts Bay Transportation Authority is soliciting Consultant Teams to perform Owner's Project Manager administrative and technical support services including but not limited to budget and schedule development/management; design oversight and review; construction coordination and monitoring; furniture, fixtures, and equipment (FF&E) move management; and punch list and closeout management.
10/11/2024 06:00 PM UTC
Z91PS78-79 SOQs
General Engineering Consulting Services for Design & Engineering Code Compliance The Massachusetts Bay Transportation Authority (MBTA) requires Professional Engineering Services and is soliciting proposals from qualified parties to provide General Code Consulting Services, including but not limited to: Fire Protection, Fire Alarm, Emergency Lighting and Power, NFPA 130 Egress Evaluation, Ventilation and Smoke Modeling, Ventilation System Analysis and Design Assist, Energy Storage and Electric Vehicles, Chapter 34 Analysis, and NFPA 241 Construction Fire Safety & Impairment Plan Consulting.
09/13/2024 06:00 PM UTC
Z91PS75-77
FIRE PROTECTION DESIGN AND ENGINEERING SERVICES The Massachusetts Bay Transportation Authority (MBTA) Engineering and Capital Divisions has identified the need for from qualified parties to prepare Design/Engineering, Consulting, Testing, Commissioning, and Inspection Services of Fire Protection systems, to be fully scoped within MBTA Engineering and assigned on a Task Order basis. The selected consultants will exhibit a depth of experience and expertise to support Testing, Commissioning, and Inspection Services of Fire Protection system to support the MBTA Project Manager for this project.
09/09/2024 06:00 PM UTC
31 - 40 of 42 Solicitations
1 2 4