Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
| Number | Deadline |
|---|---|
|
C90PS03
PA and Realtime Digital Information System Design Services
The Massachusetts Bay Transportation Authority is soliciting architectural and engineering Professional Design services for 0-100% design of a new systemwide specification and station-specific replacement plans for the MBTA’s PA and Realtime Digital Information System in stations.
| 06/05/2025 06:00 PM UTC |
|
A26CN06R-CMAR Trade RFQ
CMAR Symphony Station Improvements Project Scope
The project scope includes renovations to MBTA’s Symphony Station including, but not limited to: installation of four (4) elevators; raising the existing platforms for level boarding; renovation and expansion of inbound and outbound lobbies; two (2) public toilet rooms; new egress stairs and headhouses; renovation of existing stairs and expansion of the mezzanine; upgrade of life safety systems; lighting; finishes; wayfinding; foundation improvements, including support of excavation requirements and underpinning; site and landscaping improvements; site amenities
and protective bollards, renovated plazas for inbound station entrances; raised bike lanes, replaced sidewalks and roadway along Massachusetts Avenue; significant electrical and communication upgrades including but not limited to replacement of DC duct banks along platforms, electrical backup service from Prudential, including new substation and emergency mineral insulated (MI) cabling, and transformer vault.
Request for Qualifications for the following Trades
Masonry Work
Miscellaneous and Ornamental Irons,
Waterproofing, Damp-proofing and Caulking
Roofing and Flashing
Tile
Acoustical Tile
Resilient Floors
Painting
Elevators
Plumbing
Fire Protection Sprinkler Systems
HVAC
Electrical Work
| 06/05/2025 03:00 PM UTC |
|
H32CN01-DB RFQ
DB North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston, Cambridge and Somerville, MA
The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A. Description + any other pertinent information you wish to summarize for vendors who may reference the solicitation.
| 05/23/2025 03:00 PM UTC |
|
A34CN01- CMAR RFQ
CMAR Downtown Crossing Phase 2 and Central Square Station Accessibility Improvements, Boston and Cambridge, MA
Project Description
DTX Phase II:
Macy’s Elevator - Construction and installation of a new 2-stop Macy’s elevator, which will provide connection from, and, to the Orange Line Northbound to the Red Line Southbound Platforms, along with the associated mechanical rooms and machinery.
Winter Street Elevator: Replacement of the existing 2-stop Winter Street elevator with a larger, 3-stop elevator, which will provide transfers from, and, to street level, Orange Line Southbound, & Red Line Southbound Platforms, along with the associated mechanical rooms, machinery, new Red Line Lobby Area, and extension of the South Passageway.
Park Street Elevator: Construction and installation of a 2-stop Park Street elevator, which will provide connection from, and, to Orange Line Southbound, Green Line Eastbound, and Red Line Center Platform, along with associated mechanical rooms and machinery.
Central Square Station:
Work consists of updating Central Square Station to meet current accessibility requirements. Specifically, the proposed project will replace existing elevator #860 and elevator hoistway which extends from the Red Line outbound platform up to street level in Central Square. Additionally, the work includes the construction of two new elevators, one inbound and one outbound which extend from the Red Line inbound and outbound platform up to street level in Central Square, these will require curb modifications and traffic bollards along Mass Ave. New Areas of Rescue Assistance, one inbound and one outbound will be located adjacent to the new elevators and will be equipped with Stryker chairs, emergency call boxes and smoke proof enclosures. The inbound escalator will be modernized with a HD Transit-rated escalator with two step run-on and run-off to fit within the existing concrete areaway.
| 05/01/2025 03:00 PM UTC |
|
P62CN02- CMAR RFQ
Ashmont TPSS and Mattapan TPSS/VMF Upgrades
Ashmont:
This project will replace existing traction power equipment and add additional traction power equipment in order to meet the increased power requirements of the expanded Codman Yard and the upgrade of the Mattapan High Speed Line. The project will also renovate the building structure of the Ashmont Traction Power Substation in order to return the facility to a state of good repair.
Mattapan:
The Mattapan VMF and TPSS Projects are a part of the overall Mattapan Line Transformation Program, which aims to modernize the Mattapan Line as well increase accessibility and improve the reliability of the service. The program’s primary objective is to implement the necessary infrastructure upgrades to accommodate Type 9 light rail vehicles, allowing for the retirement of the existing PCC trolleys. The projects overall scope is below:
Vehicle Maintenance Facility
Construct new Vehicle Maintenance Facility in the Mattapan Yard to maintain and store the future vehicle fleet
Power
Implementation of a new Traction Power Substation to accommodate the added power draw of Type 9s in comparison to the existing PCC trolleys
| 04/16/2025 03:00 PM UTC |
|
H32PS03 - Request for Qualifications
Program Management / Construction Management (PM/CM) for the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project
The PM/CM Services will supplement the MBTA North Station Draw 1 Management team and act as an integrated team. The PM/CM will assist the MBTA in creation of performance metrics and management services, scope, cost and schedule monitoring and reporting, development of a Project Management Plan, collaborate with the MBTA’s Owners Representative, and provide additional field staff to supplement the MBTA field leads, and assist with change order/claim negotiation strategies.
| 04/08/2025 06:00 PM UTC |
|
H32CN01- DB RFLOI
DB North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston, Cambridge and Somerville, MA
The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A.
| 03/19/2025 03:00 PM UTC |
|
BUSPS15-16
General Engineering Consulting Services for Bus Maintenance
Planning Services, Project Management Assistance, Procurement Assistance, Maintenance, Engineering Services, Quality Assurance and Audits, Industry Innovations and Environmental Assistance.
| 02/19/2025 07:00 PM UTC |
|
R27CN01 CMAR Trade RFQ - Package 1 and 2B
CMAR Green Line Riverside Vehicle Maintenance Facility (“VMF”) Upgrades, Somerville, Newton, MA
Upgrade, modify and prepare the Green Line Riverside (Newton) and Innerbelt (Somerville) Vehicle Maintenance Facilities buildings to receive, assemble, test and commission, as well as support maintenance operations for the new low-floor Type 10 light-rail vehicles (LRVs). The work encompasses track, pits and work platforms extension, re-sectionalization of overhead catenary, floor structure reinforcement, mechanical-HVAC, mechanical-hoist, fire protection, contaminated materials management, electrical, plumbing and stinger system upgrade.
| 12/27/2024 04:00 PM UTC |
|
Y92PS11-15 SOQs
Engineering Services for the Inspection and Load Rating of the Authority's System-wide Tunnel comprising of the Orange Line, Blue Line, Red Line, Green Line, Silver Line, Harvard Busway, Commuter Rail, Amtrak and the abandoned tunnels on these lines.
| 12/20/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.