General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
#7202 - Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
01/10/2014 07:00 PM UTC
6988 - John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
01/10/2014 07:00 PM UTC
#7203 - CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
12/06/2013 07:00 PM UTC
Contract Number 7107, Unit Well 26 Generator Addition
Unit Well 26 Generator Addition
11/08/2013 07:00 PM UTC
Contract 7167 - Boulevard Landscaping-2013
Boulevard Landscaping-2013
11/08/2013 07:00 PM UTC
7191
Monona Terrace Carpet Replacement
10/04/2013 06:00 PM UTC
7185
Well 24 Roof Repair
10/04/2013 06:00 PM UTC
7194
Owen Park Drainage Channel Stabilization - 2013
10/04/2013 06:00 PM UTC
7172
Traffic Engineering Electrical Upgrades-2013
09/20/2013 06:00 PM UTC
7003
University Avenue Landscaping
09/20/2013 06:00 PM UTC
1031 - 1040 of 1107 Solicitations
1 2 100 101 102 104 106 107 108 109 110 111