General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
7220 - Resurfacing 2014 - Asphalt Base Patching and Base Patch Grinding
Resurfacing 2014 - Asphalt Base Patching and Base Patch Grinding
02/07/2014 07:00 PM UTC
7223 - Goodman Maintenance Facility Topsoil Shed
Goodman Maintenance Facility Topsoil Shed
01/24/2014 07:00 PM UTC
7218 - Resurfacing 2014 - Curb & Gutter and Castings
7218 - Resurfacing 2014 - Curb & Gutter and Castings
01/24/2014 07:00 PM UTC
7219 - Resurfacing 2014 - Asphalt Pavement Pulverizing & Paving
Resurfacing 2014 - Asphalt Pavement Pulverizing & Paving
01/24/2014 07:00 PM UTC
7217 - King Street, East Main Street and South Pinckney Street Reconstruction Assessment District-2014
King Street, East Main Street and South Pinckney Street Reconstruction Assessment District-2014
01/24/2014 07:00 PM UTC
#7202 - Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
01/10/2014 07:00 PM UTC
6988 - John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
01/10/2014 07:00 PM UTC
#7203 - CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
12/06/2013 07:00 PM UTC
Contract Number 7107, Unit Well 26 Generator Addition
Unit Well 26 Generator Addition
11/08/2013 07:00 PM UTC
Contract 7167 - Boulevard Landscaping-2013
Boulevard Landscaping-2013
11/08/2013 07:00 PM UTC
991 - 1000 of 1072 Solicitations
1 2 96 97 98 100 102 103 104 107 108