General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9613PlanHolders02272026.pdf (88.6 KB)
Contract 9613 - CIPP UV Lining Rehabilitation
9712PlanHolders02272026.pdf (86.1 KB)
Contract 9712 - Yahara Hills Golf Course Well Pipe
9726PlanHolders02272026.pdf (95.1 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders02272026.pdf (90.9 KB)
Contract 9740 - Unit Well 12 Upgrade
5 Documents

Upcoming Solicitations

Number Deadline
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
03/12/2026 07:00 PM UTC
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
03/12/2026 07:00 PM UTC
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
03/12/2026 07:00 PM UTC
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
8634 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2022
Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2022
04/07/2022 07:00 PM UTC
8860 - FEMA Shoreline Repairs - 2022
8860 - FEMA Shoreline Repairs - 2022
04/07/2022 07:00 PM UTC
8688 - Chip Sealing 2022 - East
8688 - Chip Sealing 2022 - East
04/07/2022 07:00 PM UTC
8689 - Chip Sealing 2022 - West
8689 - Chip Sealing 2022 - West
04/07/2022 07:00 PM UTC
8636 - Repairing and Sealing Pavement Cracks - Local Streets 2022
Repairing and Sealing Pavement Cracks - Local Streets 2022
04/07/2022 07:00 PM UTC
8687 - Repairing and Sealing Pavements Cracks - Major Streets 2022
8687 - Repairing and Sealing Pavements Cracks - Major Streets 2022
04/07/2022 07:00 PM UTC
9159 - Senior Center Lighting Replacement
9159 - Senior Center Lighting Replacement
03/24/2022 07:00 PM UTC
9138 - 2022 Inclusive Playgrounds
2022 Inclusive Playgrounds
03/24/2022 07:00 PM UTC
8622 - South Owen Drive, Keating Terrace and Caromar Drive Resurfacing Assessment District - 2022
8622 - South Owen Drive, Keating Terrace and Caromar Drive Resurfacing Assessment District - 2022
03/24/2022 07:00 PM UTC
8650 - Old Middleton Rd. and Craig Ave. Resurfacing Assessment District - 2021
Old Middleton Rd. and Craig Ave. Resurfacing Assessment District - 2021
03/17/2022 07:00 PM UTC
251 - 260 of 1076 Solicitations
1 2 22 23 24 26 28 29 30 107 108