General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
9244 - Overture Center Garage Screening
9244 - Overture Center Garage Screening
12/01/2022 08:00 PM UTC
8720 - Senior Center First Floor Folding Partition Installation
8720 - Senior Center First Floor Folding Partition Installation
12/01/2022 08:00 PM UTC
9230 - Fire Station 10 Lighting Retrofit
9230 - Fire Station 10 Lighting Retrofit
12/01/2022 08:00 PM UTC
8694 - S. Pinckney Street Assessment District - 2023
8694 - S. Pinckney Street Assessment District - 2023
12/01/2022 08:00 PM UTC
8653 - Olin Ave. Waste Transfer Station Floor Replacement
8653 - Olin Ave. Waste Transfer Station Floor Replacement
10/20/2022 07:00 PM UTC
9432 - Hawks Landing North Flood Mitigation
9432 - Hawks Landing North Flood Mitigation
10/20/2022 07:00 PM UTC
9228 - Replacement of Booster Pumps and Associated Piping/Appurtenances at Unit Wells 12 & 26
9228 - Replacement of Booster Pumps and Associated Piping/Appurtenances at Unit Wells 12 & 26
09/29/2022 07:00 PM UTC
8691-East-West Bus Rapid Transit Early Works
East-West Bus Rapid Transit Early Works
09/15/2022 07:00 PM UTC
8873 - Truax Lift Station Replacement
8873 - Truax Lift Station Replacement
09/08/2022 07:00 PM UTC
9195 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
09/08/2022 07:00 PM UTC
211 - 220 of 1082 Solicitations
1 2 18 19 20 22 24 25 26 108 109