General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06172025.pdf (89.3 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06172025.pdf (90.6 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06172025.pdf (107 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06172025.pdf (108 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06172025.pdf (105 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8650 - Old Middleton Rd. and Craig Ave. Resurfacing Assessment District - 2021
Old Middleton Rd. and Craig Ave. Resurfacing Assessment District - 2021
03/17/2022 07:00 PM UTC
9146 - Streets West Badger - Roofing Alterations
9146 - Streets West Badger - Roofing Alterations
03/03/2022 08:00 PM UTC
8632 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 5) By The Common Council
8632 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 5) By The Common Council
03/03/2022 08:00 PM UTC
8633 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work - 2022
8633 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work - 2022
03/03/2022 08:00 PM UTC
8619 - Resurfacing 2022 - Asphalt Base Patching and Base Patch Grinding
8619 - Resurfacing 2022 - Asphalt Base Patching and Base Patch Grinding
03/03/2022 08:00 PM UTC
8618 - Resurfacing 2022 - Asphalt Pavement Pulverizing, Milling & Paving
8618 - Resurfacing 2022 - Asphalt Pavement Pulverizing, Milling & Paving
03/03/2022 08:00 PM UTC
8568 - Old Middleton Road and Craig Avenue Resurfacing Assessment District -2021
Old Middleton Road and Craig Avenue Resurfacing Assessment District -2021
03/03/2022 08:00 PM UTC
8617 - Resurfacing 2022 - Curb & Gutter and Castings
8617 - Resurfacing 2022 - Curb & Gutter and Castings
03/03/2022 08:00 PM UTC
8601 - Senior Center Lighting Replacement
8601 - Senior Center Lighting Replacement
02/17/2022 08:00 PM UTC
8592 - Engineering Operations Facility - Canopy Replacement/Expansion
Engineering Operations Facility - Canopy Replacement/ Expansion
02/17/2022 08:00 PM UTC
231 - 240 of 1047 Solicitations
1 2 20 21 22 24 26 27 28 104 105