General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02122026.pdf (91.3 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02122026.pdf (92.9 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02122026.pdf (84.4 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02122026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8074-ANNUAL CONSTRUCTION AND RECONSTRUCTION OF CONCRETE SIDEWALK AND INCIDENTAL CONCRETE CURB & GUTTER WORK ORDERED (DISTRICT 16) BY THE COMMON COUNCIL
ANNUAL CONSTRUCTION AND RECONSTRUCTION OF CONCRETE SIDEWALK AND INCIDENTAL CONCRETE CURB & GUTTER WORK ORDERED (DISTRICT 16) BY THE COMMON COUNCIL
03/15/2018 07:00 PM UTC
8077 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 16) - 2018
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 16) - 2018
03/15/2018 07:00 PM UTC
8152 - Summit Maintenance Facility - Building Improvements
Summit Maintenance Facility - Building Improvements
02/22/2018 08:00 PM UTC
8098 - Resurfacing 2018 - Curb & Gutter and Castings
Resurfacing 2018 - Curb & Gutter and Castings
02/22/2018 08:00 PM UTC
8100 - Resurfacing 2018 - Asphalt Base Patching and Base Patch Grinding
8100 - Resurfacing 2018 - Asphalt Base Patching and Base Patch Grinding
02/22/2018 08:00 PM UTC
8099 - Resurfacing 2018 - Asphalt Pavement Pulverizing, Milling & Paving
Resurfacing 2018 - Asphalt Pavement Pulverizing, Milling & Paving
02/22/2018 08:00 PM UTC
7843 - Ronald Reagan Avenue, John Wall Drive and Merchant Street Assessment District - 2017
Ronald Reagan Avenue, John Wall Drive and Merchant Street Assessment District - 2017
02/14/2018 08:00 PM UTC
8096 - 2018 Parks Division Fencing and Backstops
2018 Parks Division Fencing and Backstops
02/08/2018 08:00 PM UTC
8101 - Wingra Creek Pedestrian Bridge Replacement - West Wingra Drive at South Street
Wingra Creek Pedestrian Bridge Replacement - West Wingra Drive at South Street
02/08/2018 08:00 PM UTC
8072 - Fire Station 10 Bathroom Remodel
Fire Station 10 Bathroom Remodel
01/25/2018 08:00 PM UTC
571 - 580 of 1073 Solicitations
1 2 54 55 56 58 60 61 62 107 108