General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06202025.pdf (90.5 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06202025.pdf (90.7 KB)
Contract 8784 - E Main S Hancock
8785PlanHolders06202025.pdf (87.2 KB)
Contract 8785 - Meyer Avenue
9612PlanHolders06202025.pdf (107 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06202025.pdf (109 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06202025.pdf (105 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
7 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
7800 - Bridge Repairs - 2017
Bridge Repairs - 2017
05/05/2017 06:00 PM UTC
7895 - Hughes Place Storm Relief and Resurfacing - 2017
Hughes Place Storm Relief and Resurfacing - 2017
05/05/2017 06:00 PM UTC
7845 - S. Stoughton Rd Service Rd, Remington Rd and Blossom Ln Assessment District - 2017
S. Stoughton Rd Service Rd, Remington Rd and Blossom Ln Assessment District - 2017
05/05/2017 06:00 PM UTC
7939 - Madison Municipal Building Renovation
Madison Municipal Building Renovation
04/26/2017 06:00 PM UTC
7936 - Madison Water Utility Storm Water Management Improvements - 115 S Paterson Street
7936 - Madison Water Utility Storm Water Management Improvements - 115 S Paterson Street
04/21/2017 06:00 PM UTC
7945 - Polymer Overlay of the Monona Terrace Bike Path
Polymer Overlay of the Monona Terrace Bike Path
04/21/2017 06:00 PM UTC
7850 - Yuma Drive Resurfacing Assessment District - 2017
Yuma Drive Resurfacing Assessment District - 2017
04/21/2017 06:00 PM UTC
7836 - Douglas Trail, Lamont Lane, Acacia Lane, Louden Lane, and Kvamme Lane Reconstruction Assessment District - 2017
Douglas Trail, Lamont Lane, Acacia Lane, Louden Lane, and Kvamme Lane Reconstruction Assessment District - 2017
04/21/2017 06:00 PM UTC
7956 - Utility Replacement with Resurfacing Assessment District - 2017
Utility Replacement with Resurfacing Assessment District - 2017
04/21/2017 06:00 PM UTC
7928 - 2017 Parking Garage Maintenance
2017 Parking Garage Maintenance
04/07/2017 06:00 PM UTC
611 - 620 of 1047 Solicitations
1 2 58 59 60 62 64 65 66 104 105