General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02122026.pdf (91.3 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02122026.pdf (92.9 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02122026.pdf (84.4 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02122026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
8035 - Park Edge Drive Flood Mitigation
8035 - Park Edge Drive Flood Mitigation
08/18/2017 06:00 PM UTC
8032 - Olin Transfer Station Stormwater Improvement
8032 - Olin Transfer Station Stormwater Improvement
08/18/2017 06:00 PM UTC
7951 - Capitol East District Parking Structure
7951 - Capitol East District Parking Structure
08/11/2017 06:00 PM UTC
7979 - Monona Bay Shoreline Repairs
Monona Bay Shoreline Repairs
08/11/2017 06:00 PM UTC
7896 - Chippewa Drive Sidewalk Assessment District - 2017
Chippewa Drive Sidewalk Assessment District - 2017
08/11/2017 06:00 PM UTC
7952 - Judge Doyle Garage
Judge Doyle Garage
08/04/2017 06:00 PM UTC
7998 - Fire Station 10 Storefront Replacement
Fire Station 10 Storefront Replacement
07/21/2017 06:00 PM UTC
7978 - Monona Terrace Exhibition Hall Flooring Resurfacing
Construction to resurface the epoxy floor coating in the Exhibition Hall. The area of this project is approximately 39,200 square feet.
07/21/2017 06:00 PM UTC
7799 - Bikeways 2017
Bikeways 2017
07/21/2017 06:00 PM UTC
7970 - DEMETRAL PARK ADULT FITNESS
7970 - DEMETRAL PARK ADULT FITNESS
07/07/2017 06:00 PM UTC
601 - 610 of 1072 Solicitations
1 2 57 58 59 61 63 64 65 107 108