General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
7524-Fire Station #4 Roof Replacement
Fire Station #4 Roof Replacement
06/26/2015 06:00 PM UTC
7499-Well 31 Reservoir Construction (1,500,000 Gallon Ground Storage Reservoir No. 31)
Well 31 Reservoir Construction (1,500,000 Gallon Ground Storage Reservoir No. 31)
06/19/2015 06:00 PM UTC
7445 - Spruce Street Reconstruction Assessment District - 2015
7445 - Spruce Street Reconstruction Assessment District - 2015
06/19/2015 06:00 PM UTC
7539 - Confluence Pond Regrading & Greenway Repair
7539 - Confluence Pond Regrading & Greenway Repair
06/19/2015 06:00 PM UTC
7538 - Nakoma Greenway Repair
7538 - Nakoma Greenway Repair
06/19/2015 06:00 PM UTC
7531-Lake Edge Park Shelter
Lake Edge Park Shelter
06/05/2015 06:00 PM UTC
7448-Wirth Court Reconstruction Assessment District-2015
Wirth Court Reconstruction Assessment District-2015
06/05/2015 06:00 PM UTC
7227-Bear Claw Way, Wilrich Street and Cobalt Street Assessment District-2015
Bear Claw Way, Wilrich Street and Cobalt Street Assessment District-2015
06/05/2015 06:00 PM UTC
7059 Central Park Phase 1B
Central Park Phase 1B
05/22/2015 06:00 PM UTC
7449-Bridge Maintenance and Repairs-2015
Bridge Maintenance and Repairs-2015
05/22/2015 06:00 PM UTC
851 - 860 of 1107 Solicitations
1 2 82 83 84 86 88 89 90 110 111