City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8801PlanHolders09092025.pdf (89.4 KB) |
Contract 8801 - Troy Drive Green Ave
| |
9674PlanHolders09092025.pdf (91.5 KB) |
Contract 9674 - 346 E. Lakeside Demolition
| |
9679PlanHolders09092025.pdf (88.9 KB) |
Contract 9679 - Olin Park Bridge Replacement
| |
9681PlanHolders09092025.pdf (91.7 KB) |
Contract 9681 - Dairy Drive Campground
| |
9687PlanHolders09092025.pdf (86.6 KB) |
Contract 9687 - Country Grove Singletrack Trail
| |
Number | Deadline |
---|---|
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
| 09/18/2025 07:00 PM UTC |
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 09/18/2025 07:00 PM UTC |
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following:
• Removal of existing bridge
• Bridge fabrication, delivery and installation of new bridge on existing abutments
| 09/18/2025 07:00 PM UTC |
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
| 09/18/2025 07:00 PM UTC |
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located
3202 Dairy Dr.
| 09/25/2025 07:00 PM UTC |
Number | Deadline |
---|---|
6891 - Fire Station Admin Office Building and Fire Station 1
Fire Station Admin Office Building and Fire Station 1; Engineer's estimate: $ 9.2M
| 02/06/2015 07:30 PM UTC |
7270 - HWY 151/Lancaster Dr Water Main Crossing
7270 - HWY 151/Lancaster Dr Water Main Crossing; Engineer estimate: $654,400
| 02/06/2015 07:00 PM UTC |
7419 - S Owen Drive Assessment District-2015
S Owen Drive Assessment District-2015
Engineers Estimate: $935,200.
| 02/06/2015 07:00 PM UTC |
7367 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 20) - 2015
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 20) - 2015
Engineers Estimate: $64,000
| 02/06/2015 07:00 PM UTC |
7364 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered ( District 20) by the Common Council
7364 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered ( District 20) by the Common Council; Engineers estimate: $1,500,000
| 02/06/2015 07:00 PM UTC |
7389-Blackhawk Path Improvements at Old Middleton Road/Eau Claire Avenue
Blackhawk Path Improvements at Old Middleton Road/Eau Claire Avenue
Engineers Estimate: $200,177.
| 02/06/2015 07:00 PM UTC |
7418 - Tompkins Drive Assessment District - 2015
7418 - Tompkins Drive Assessment District - 2015; Engineers estimate: $2,488,000
| 02/06/2015 07:00 PM UTC |
7421 - Mineral Point Road Sidewalk Assessment District - 2015 and City Wide Street & Storm Sewer Repairs - 2015
7421 - Mineral Point Road Sidewalk Assessment District - 2015 and City Wide Street & Storm Sewer Repairs - 2015;
Engineers estimate: $177,311
| 02/06/2015 07:00 PM UTC |
7411 - Booster Pumping Station 115 Upgrades
7411 - Booster Pumping Station 115 Upgrades Engineers Estimate: $1,097,360.00
| 01/09/2015 07:00 PM UTC |
7188 - Booster Station 115 Pipeline Improvements
7188 - Booster Station 115 Pipeline Improvements; Engineer's Estimate: $2,557,000.00
| 01/09/2015 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.