General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
7433-State Street Sidewalk Repairs
State Street Sidewalk Repairs
05/22/2015 06:00 PM UTC
7429-Commercial Avenue (CTH T) & N. Sprecher Road Intersection Improvements-2015
Commercial Avenue (CTH T) & N. Sprecher Road Intersection Improvements-2015
05/22/2015 06:00 PM UTC
7442-Turner Avenue Assessment District-2015
Turner Avenue Assessment District-2015
05/22/2015 06:00 PM UTC
7441 - Hoepker Road Assessment District - 2015
7441 - Hoepker Road Assessment District - 2015
05/22/2015 06:00 PM UTC
7386 - Tenney Lagoon Shoreline Restoration & Tenney Park (E. Johnson St.) Bike Path
7386 - Tenney Lagoon Shoreline Restoration & Tenney Park (E. Johnson St.) Bike Path
05/22/2015 06:00 PM UTC
7395-Madison Street Reconstruction and Oakland Avenue Resurfacing Assessment District-2015 and Block 1 Wingra Park Alley Reconstruction Assessment District-2015
Madison Street Reconstruction and Oakland Avenue Resurfacing Assessment District-2015 and Block 1 Wingra Park Alley Reconstruction Assessment District-2015
05/15/2015 06:00 PM UTC
7375-Lake Edge Park Shelter
Lake Edge Park Shelter
05/13/2015 06:00 PM UTC
7245-Capital City Path Reconstruction and Bridge Replacement
Capital City Path Reconstruction and Bridge Replacement; Engineers Estimate: $848,700
05/08/2015 06:00 PM UTC
7392-Nakoma Park Pedestrian Entrance Steps-Masonry Repairs
Nakoma Park Pedestrian Entrance Steps-Masonry Repairs; Engineers Estimate: $220,000
05/08/2015 06:00 PM UTC
7444-Local Road Traffic Calming & Arterial Pedestrian Enhancements-2015
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2015
05/08/2015 06:00 PM UTC
861 - 870 of 1107 Solicitations
1 2 83 84 85 87 89 90 91 110 111