General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
7389-Blackhawk Path Improvements at Old Middleton Road/Eau Claire Avenue
Blackhawk Path Improvements at Old Middleton Road/Eau Claire Avenue Engineers Estimate: $200,177.
02/06/2015 07:00 PM UTC
7418 - Tompkins Drive Assessment District - 2015
7418 - Tompkins Drive Assessment District - 2015; Engineers estimate: $2,488,000
02/06/2015 07:00 PM UTC
7421 - Mineral Point Road Sidewalk Assessment District - 2015 and City Wide Street & Storm Sewer Repairs - 2015
7421 - Mineral Point Road Sidewalk Assessment District - 2015 and City Wide Street & Storm Sewer Repairs - 2015; Engineers estimate: $177,311
02/06/2015 07:00 PM UTC
7411 - Booster Pumping Station 115 Upgrades
7411 - Booster Pumping Station 115 Upgrades Engineers Estimate: $1,097,360.00
01/09/2015 07:00 PM UTC
7188 - Booster Station 115 Pipeline Improvements
7188 - Booster Station 115 Pipeline Improvements; Engineer's Estimate: $2,557,000.00
01/09/2015 07:00 PM UTC
7454 - Hazardous Waste Removal-Fire Station 1
Hazardous Waste Removal-Fire Station 1 Engineers Estimate: $75,000.00
01/07/2015 07:00 PM UTC
7409-Carpeting at South District Police Station
Carpeting at South District Police Station Engineers Estimate: $60,000.00
12/19/2014 07:00 PM UTC
7381 - Johns St. and Emil St. Utilities with Resurfacing Assessment District
Johns St. and Emil St. Utilities with Resurfacing Assessment District Engineers Estimate: 1,800,000,000.00
12/19/2014 07:00 PM UTC
7417 - Bascom Pl, Bascom St & Chamberlain Ave Reconstruction Assessment District - 2015
7417 - Bascom Pl, Bascom St & Chamberlain Ave Reconstruction Assessment District - 2015; Engineers Estimate: $1,215,000
12/19/2014 07:00 PM UTC
7408-Skate Park - Central Park, Madison
Skate Park - Central Park, Madison Engineers Estimate: Base Bid $800,000.00; Base Bid with Alternates $890,000.00
12/12/2014 07:00 PM UTC
861 - 870 of 1047 Solicitations
1 2 83 84 85 87 89 90 91 104 105