General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 67-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: TD05684702 – High Impact Asphalt Resurfacing @ S. Water St. - E. National Ave. to E. Pittsburgh Ave. TD05684710 – Asphalt Resurfacing @ N. Harbor Dr. - E. Corcoran Ave. to E. Menomonee St. (ext'd)
08/04/2026 03:30 PM UTC
OFFICIAL NOTICE 76-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: TD05684711 – TID 56 High Impact Paving S. 1st St.- W. Florida St. to W. Oregon St. E. Erie St. - River (City ROW End) to N. Water St. N. Jackson St. - E. Chicago St. to E. St. Paul Ave. E. Menomonee St. - N. Milwaukee St. to N. Broadway N. Milwaukee St. - E. Corcoran Ave. to E. Menomonee St.
08/06/2026 03:30 PM UTC
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 50-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT REMOVAL, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAYS, 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, PERMEABLE PAVER BLOCKS, DETECTABLE WARNING FIELDS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, TREE CLEARING AND GRUBBING, SITE RESTORATION ETC.; Located at: ST211210127 – W. Cherry St. – A. pt. east of N. 32nd St. to N. 35th St. ST211240153 – W. Michigan St. – N. 35th St. to N. 37th St. (ext’d) (Including N. 36th St. – W. Michigan St. to W. Wisconsin Ave.)
07/30/2026 03:30 PM UTC
OFFICIAL NOTICE 32-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.; Located at: TD05684701 – N. Water St. – E. Erie St. to E. Clybourn St. (TID 56)
07/30/2026 03:30 PM UTC
OFFICIAL NOTICE 70-1-2026
The general work requested is: THE CONSTRUCTION OF; 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS, 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: TD08484211 – W. Vliet St. – N. 6th St. to N. Vel R. Phillips Ave. TD08584032 – S. 7th St. – W. National Ave. to W. Pierce St.
07/28/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 49-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: ST211240144 – N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. ST211220178 – N. 37th St. – N. Hopkins St. to W. Hampton Ave.
07/08/2026 03:30 PM UTC
OFFICIAL NOTICE 64-1-2026
MAINTENANCE SEALCOATING INCLUDING REMOVAL AND REPLACEMENT OF CONCRETE BASE, VARIABLE THICKESS ASPHALTIC CONCRETE PAVEMENT, CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS, SEALCOAT ASPHALTIC BITUMINOUS PAVEMENTS USING A SLURRY SEAL, ETC.;
07/07/2026 03:30 PM UTC
OFFICIAL NOTICE 6-1-2026
PROJECT NO. 1: SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING. Located at: N. 42nd St. – 50’ S. of W. Courtland Ave. to 50' N. of W. Courtland Ave. N. 55th St.– W. Townsend St. to W. Keefe Ave. W. Keefe Ave.– N. 53rd St. to N. 60th St.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 6-2-2026
PROJECT NO. 2: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 15th St. – W. Meinecke Ave. to W. Wright St. N. 15th St. – W. North Ave. to W. Meinecke Ave.
07/01/2026 03:30 PM UTC
1 - 10 of 1599 Solicitations
← Previous 1 3 4 5 6 7 8 9 159 160