General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 62-1-2025
Milwaukee Fire Department, Engine House #4, 7, 16, 18, & 36 Roof & Metal Cladding Replacement Located at: Various Fire Station Locations, Milwaukee, Wisconsin.
06/18/2025 03:30 PM UTC
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 20-1-2025
The general work requested is: THE CONSTRUCTION OF; CONCRETE TRAFFIC ISLAND, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE DRIVEWAYS, VARIABLE CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, CONCRETE CURB PEDESTRIAN, DETECTABLE WARNING FIELD, INSTALLATION OF VARIOURS CONDUIT/CABLE ITEMS, VARIOURS TRAFFIC SIGNAL ITEMS, PAVEMENT GRINDING, PAVEMENT MARKING, VARIOURS TRAFFIC SIGNAGE ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, VARIOURS PAVEMENT MARKINGS, INSTALLATION OF VARIOURS LIGHTING/LUMINAIRE UNITS, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD11084001 – West Michigan Street – North 10th Street to North Water Street
06/17/2025 03:30 PM UTC
OFFICIAL NOTICE 70-2-2025
200 LEAD SERVICE LINE REPLACEMENTS
06/12/2025 03:30 PM UTC
OFFICIAL NOTICE 70-1-2025
200 LEAD SERVICE LINE REPLACEMENTS
06/12/2025 03:30 PM UTC
OFFICIAL NOTICE 69-2-2025
300 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/11/2025 03:30 PM UTC
OFFICIAL NOTICE 69-1-2025
500 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/11/2025 03:30 PM UTC
OFFICIAL NOTICE 61-1-2025
SANITARY SEWER RELAY W. Fairview Ave. – 170’ +/- SE of N. 59th St. to 175’ +/- SW of N. 60th St.
06/10/2025 03:30 PM UTC
OFFICIAL NOTICE 63-3-2025
200 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/09/2025 03:30 PM UTC
OFFICIAL NOTICE 63-2-2025
300 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/09/2025 03:30 PM UTC
OFFICIAL NOTICE 63-1-2025
300 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/09/2025 03:30 PM UTC
OFFICIAL NOTICE 43-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENTS, CONCRETE TRAFFIC ISLAND, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, SIGNAGE AND SIGNAGE INSTALLATION, VARIOUS PAVEMENT MARKINGS, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; RG5230220314 South 3rd Street - West Bruce Street: Bradley Tech RG5230220315 North 20th Street - West Brown Street: Brown Street Academy RG5230220316 South 40th Street - West Forest Home Avenue: Manitoba School RG5230220317 North 50th Street - West Keefe Avenue: Yeshiva Elementary School RG5230220318 North 53rd Street - West Locust Street: Mt. Cavalry Lutheran School RG5230220319 North 64th Street - West Fiebrantz Avenue: Blessed Savior School RG5230220320 North 68th Street - West Stark Street: Lancaster Public School RG5230220321 North Dr. Martin Luther King Jr. Drive - West Ring Street: Hope Christian High School
06/06/2025 03:30 PM UTC
1 - 10 of 1474 Solicitations
← Previous 1 3 4 5 6 7 8 9 147 148