General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE DRIVEWAYS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC, located at: (ST21100147) E. Stewart St. - S. Marina Dr. to S. Hilbert St.
06/10/2016 03:30 PM UTC
OFFICIAL NOTICE 70-1-2016
WATER MAIN RELAYS, located at the following locations: W. Good Hope Rd. (S/S) (WT410160669), N. Teutonia Ave. to N. 38th St. (12 Working Days); W. Boehlke Ave. (WT410160670), N. 42nd St. to N. 43rd St. (10 Working Days); W. Newton Pl. (WT410160701), N. 42nd St. to N. 43rd St. (16 Working Days); N. 35th St. (WT410160702), W. Oriole Dr. to W. Florist Ave. (36 Working Days); W. Reichert Pl. (WT410160716), N. 27th St. to 240’ W/O N. 27th St. (11 Working Days); N. 42nd St. (WT410160752), 315’ N/O W. Newton Pl. (3 Working Days)
06/09/2016 03:30 PM UTC
OFFICIAL NOTICE 46-1-2016
Perform complete tear-off. Provide built-up roof and fascia on Howard Water Treatment Facility's Drive House and Chlorine Scale Room roofs.
06/07/2016 03:30 PM UTC
OFFICIAL NOTICE 69-1-2016
WATER MAIN RELAYS, located at the following locations: W. Richardson Pl. (WT410160617), N. 28th St. to N. 29th St. (13 Working Days); N. 17th St. (WT410160652), W. Wisconsin Ave. to W. Wells St. (19 Working Days); E. Mason St. (WT410160718), N. Jackson St. to N. Van Buren St. (13 Working Days)
06/02/2016 03:30 PM UTC
OFFICIAL NOTICE 44-1-2016
Furnishing all the equipment, operators, and dispatch facility(s) for REMOVING ILLEGALLY PARKED VEHICLES FROM STREETS AND ALLEYS –ZONE I (South), IN THE CITY OF MILWAUKEE.
05/31/2016 03:30 PM UTC
OFFICIAL NOTICE 55-1-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, REPAIR AND MANHOLE REPAIR AND LINING in: N. 15th St. – W. Highland Ave. to W. Juneau Ave.; N. 17th St. – W. Kilbourn Ave. to W. Highland Ave.; N. 18th St. / Pedestrian Way – 140’ +/- S. of Highland Ave. to W. Highland Ave. **Attendance at a Pre-Bid meeting on Thursday, May 19, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
05/27/2016 03:30 PM UTC
OFFICIAL NOTICE 54-1-2016
COMBINED SEWER MAIN RELAY, COMBINED SEWER LINING, AND MANHOLE REPAIR AND LINING in: W. North Ave. – N. Teutonia Ave. to N. 14th St., W. Wright St. – N. 11th St. to N. 15th St., and N. Teutonia Ave. – W. North Ave. to 200’ +/- N. of W. North Ave.
05/26/2016 03:30 PM UTC
OFFICIAL NOTICE 53-1-2016
SANITARY SEWER RELAY, AND STORM SEWER REPAIR, LINING AND MANHOLE REPAIR AND LINING in: N. 53rd St. – W. Roosevelt Dr. to W. Keefe Ave.; AND N. 55th St. – W. Nash St. to W. Vienna Ave.
05/24/2016 03:30 PM UTC
OFFICIAL NOTICE 38-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211150165) - N. 53rd St. - W. Roosevelt Dr. to W. Keefe Ave. (TD04284001A) - W. Hope Ave. / W. Maxwell Pl. - N. 51st Blvd. to W. Fond Du Lac Ave.
05/23/2016 03:30 PM UTC
OFFICIAL NOTICE 32-1-2016
This project involves the Traffic Deck Recoating and Repairs of Parking Levels 1-4 at the Milwaukee-Michigan Parking Structure located in Milwaukee, WI 53202.
05/19/2016 03:30 PM UTC
1161 - 1170 of 1601 Solicitations
1 2 113 114 115 117 119 120 121 160 161