General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 62-1-2025
Milwaukee Fire Department, Engine House #4, 7, 16, 18, & 36 Roof & Metal Cladding Replacement Located at: Various Fire Station Locations, Milwaukee, Wisconsin.
06/18/2025 03:30 PM UTC
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 17-2-2015
SANITARY AND COMBINED SEWER MAINS RELAY, SANITARY AND COMBINED SEWER MAINS LINING AND MANHOLE REPAIR & LINING, STORM SEWER OUTLET REHABILITATION AND NEW STORM SEWER MAIN INSTALLATION in: N. 19th St. – W. Clybourn St. to 697’ +/- north of W. Clybourn St.; N. 20th St. – W. Wells St. to W. Kilbourn Ave.; N. 21st St. – W. Clarke St. to W. Center St.; N. 24th St. – W. Lisbon Ave. to W. Vine St.; N. 26th St. – W. Hadley St. to W. Chambers St.; E. Clarke St. – N. Hubbard St. to N. Richards St.; W. Melvina St. – N. 63rd St. (in Dineen Park); W. Fond Du Lac Ave. – N. 36th St. to N. 38th St.; W. Wright St. – N. Palmer Ave. to N. Buffum St
03/26/2015 03:30 PM UTC
OFFICIAL NOTICE 14-1-2015
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC, located at (ST211140133) N. Weil St. – E. Meinecke Ave. to E. Center St.
03/24/2015 03:30 PM UTC
OFFICIAL NOTICE 47-1-2015
WATER MAIN RELAYS, located at the following locations: W. Burdick Ave. (WT410140646), S. 88th St. to S. 89th St. (13 Working Days); S. 90th St. (WT410140647), 720’ N/O W. Burdick Ave. to W. Burdick Ave. (17 Working Days); S. 91st St. (WT410150601), W. Holt Ave. to 135’ S/O W. Verona Ct. (14 Working Days); W. Greenfield Ave. (WT410150604), S. 35th St. to S. 37th St. (14 Working Days).
03/19/2015 03:30 PM UTC
OFFICIAL NOTICE 43-1-2015
This project involves the Traffic Deck Recoating and Repairs of the 9th Street Level of MacArthur Square Parking Structure located at 841 North James Lovell Street in Milwaukee, WI 53233.
03/18/2015 03:30 PM UTC
OFFICIAL NOTICE 33-1-2015
Rehabilitation of the West Becher Street Bridge over Kinnickinnic River P-40-794 located in Milwaukee, Wisconsin, 53207
03/17/2015 03:30 PM UTC
OFFICIAL NOTICE 24-1-2015
LS-34 Coating and Appurtenance Modifications of West Ground Storage Tank located at 3641 West Lincoln Avenue, Milwaukee, WI 53215
03/16/2015 03:30 PM UTC
OFFICIAL NOTICE 15-1-2015
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211120105) N. 23rd St. – W. Capitol Dr. to W. Hope Ave.
03/12/2015 03:30 PM UTC
OFFICIAL NOTICE 21-1-2015
CONSTRUCTION OF VARIABLE THICKNESS CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211130176) N. Maryland Ave. – E. Kenwood Blvd. to E. Hartford Ave., (ST211140179) E. Hartford Ave. – N. Cramer St. to N. Maryland Ave.
03/11/2015 03:30 PM UTC
OFFICIAL NOTICE 50-1-2015
Stump Grinding, Removal, and Site Restoration in the North District Service Area. North District Service Area: Capital Drive North to City Limits.
03/09/2015 03:30 PM UTC
OFFICIAL NOTICE 51-1-2015
Stump Grinding, Removal, and Site Restoration in the Central District Service Area. Central District Service Area: Interstate I-94 North to Capital Drive.
03/09/2015 03:30 PM UTC
1201 - 1210 of 1474 Solicitations
1 2 117 118 119 121 123 124 125 147 148