General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 9-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/12/2015 04:30 PM UTC
OFFICIAL NOTICE 7-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 7, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 8-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 6-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits The contractor has the option of submitting two (2) proposals for the paving on all the locations listed. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/10/2015 04:30 PM UTC
OFFICIAL NOTICE 5-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150104) Asphalt Overlays: N. Van Buren St. - E. Kilbourn Ave. to E. Brady St.; E/W Pleasant St. - N. Palmer St. to N. Dr. Martin Luther King Jr. Dr.; E. Newberry Blvd. - N. Lake Dr. to N. Downer Ave.; E. Newberry Blvd. - N. Downer Ave. to N. Oakland Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/09/2015 04:30 PM UTC
OFFICIAL NOTICE 4-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150103) Asphalt Overlays: W. Locust St. - N. Fond du Lac Ave. to N. 35th St.; W. Center St. - N. 12th St. to N. 20th St.; W. Center St. - N. 35th St. to N. Sherman Blvd.; N. 27th St. - W. Townsend St. to W. Capitol Dr. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/06/2015 04:30 PM UTC
OFFICIAL NOTICE 2-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150101) Asphalt Overlays: W. Villard Ave. – N. 51st St. to N. 60th St.; W. Villard Ave. - N. 60th St. to N. 68th St.; W. Florist Ave. – N. Teutonia to N. Sherman Blvd. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC
OFFICIAL NOTICE 3-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150102) Asphalt Overlays: W. Green Tree Rd. – N. 43rd St. to N. 60th St.; N. 55th St. – W. Lisbon Ave. to W. Burleigh St.; N. 84th St. – W. Mill Road to N. Burbank Ave.; W. Keefe Ave. – N. 94th St. to N. 100th St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 5, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 11-1-2015
COMBINED SEWER MAINS RELAY, LINING, AND MANHOLE REPAIR & LINING
01/29/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 19-1-2015
2015 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing at various locations.
01/16/2015 04:30 PM UTC
1201 - 1210 of 1449 Solicitations
1 2 117 118 119 121 123 124 125 144 145