General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2015
MILWAUKEE POLICE DEPARTMENT DATA ROOM UPS UNITS & COOLING REPLACEMENT VARIOUS SITES MILWAUKEE, WI
06/01/2015 03:30 PM UTC
OFFICIAL NOTICE 82-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays – N. 63rd St. (WT410140630), W. Capitol Dr. to W. Fiebrantz Av. (18 Working Days); N. 66th St. (WT410140637), W. Vienna Av. to W. Melvina St. (17 Working Days); W. Leon Tr. (WT410140644), N. 53rd St. to W. Ely Pl. (17 Working Days); N. 53rd St. (WT410140645), W. Marion St. to W. Congress St. (24 Working Days)
05/29/2015 03:30 PM UTC
OFFICIAL NOTICE 83-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays – N. 98th St. (WT410140649), W. Vera Av. to W. Good Hope Rd. (28 Working Days); W. Rochelle Av. (WT410140650), N. Park Manor Dr. to N. 98th ST. (29 Working Days); W. Good Hope Rd. (S/S) (WT410140651), N. Park Manor Dr. to N. 98th St. (34 Working Days); N. Park Manor Dr. (WT410140652), W. Green Tree Rd. to W. Debbie Ln. (20 Working Days)
05/29/2015 03:30 PM UTC
OFFICIAL NOTICE 32-1-2015
COMBINED SEWER MAINS RELAY IN: N. 32nd St. - W. Cherry St. to W. Lisbon Ave. W. Monroe St. - W. Tamarack St. to W. Center St.
05/28/2015 03:30 PM UTC
OFFICIAL NOTICE 32-2-2015
SANITARY AND STORM SEWER MAINS LINING, REPAIR AND MANHOLE REPAIR & LINING in: S. 2nd St. – A point 250’ +/- North of W. Vogel St. to W. Edgerton Ave. S. 20th Pl. – W. Howard Ave. to W. Van Beck Ave. S. 47th St. – W. Oklahoma Ave. to W. Forest Home Ave. W. Eden Pl. – S. 8th St. to S. 11th St.
05/28/2015 03:30 PM UTC
OFFICIAL NOTICE 85-1-2015
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 1: Area bounded by Capitol Drive, and north City limits
05/15/2015 03:30 PM UTC
OFFICIAL NOTICE 79-1-2015
WATER MAIN RELAYS, located at the following locations: W. Lynx Ct. (WT410140623), 150’ E/O N. 95th St. (7 Working Days); W. Kaul Ave. (WT410140624), N. 95th St. to N. Denmark St. (23 Working Days); N. 95th St. (WT410140625), W. Langlade St. to W. Rio St. (26 Working Days); W. Congress St. (WT410140684), N. 84th St to N. 90th St. (59 Working Days)
05/14/2015 03:30 PM UTC
OFFICIAL NOTICE 80-1-2015
HYDRANT ALTERATIONS, located at the following locations: N. Teutonia Ave. (WT410150001), W. Capitol Dr. to W. Ruby Ave.
05/14/2015 03:30 PM UTC
OFFICIAL NOTICE 56-1-2015
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, CUTTING, PERMEABLE PAVERS, CRUSHED STONE BASE, PAVEMENT REMOVAL, ETC, located at (ST212150112) Alley betw. W. Arthur Ave., W. Harrison Ave., W. Windlake Ave., S. 18th St., S. 19th St.; (ST212150113) Alley betw. W. Harrison Ave., W. Windlake Ave., S. 20th St.
05/13/2015 03:30 PM UTC
OFFICIAL NOTICE 65-1-2015
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, CUTTING, PERMEABLE PAVERS, CRUSHED STONE BASE, PAVEMENT REMOVAL, ETC, located at (ST21210101) Alley betw. E. Auer Ave., E. Burleigh St., N. Fratney St., N. Pierce St.; (ST212050124) Alley betw. W. Hadley St., W. Locust St., N. 32nd St., N. 33rd St.; (ST212140123) Alley betw. W. Auer Ave., W. Burleigh St., W. Fond du Lac Ave., N. 37th St., N. 38th St.; (ST212140136) Alley betw. W. Capitol Dr., W. Hope Ave., N. 24th Pl., N. 25th St.; (ST211140174) N. 48th St. – Pt 150’ S. of W. North Ave. to Pt. 200’ S. of W. North Ave.
05/13/2015 03:30 PM UTC
1171 - 1180 of 1476 Solicitations
1 2 114 115 116 118 120 121 122 147 148