General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 110-1-2016
SANITARY & COMBINED SEWER MAIN RELAY in: N. 15th St. – 350’ S. of W. Olive St. to W. Olive St., N. 21st St. – 215’ S. of W. Vliet St. to W. Vliet St., N. 23rd St. – W. Vliet St. to 125’ S. of W. Cherry St., N. 24th Pl. – W. Vliet St. to W. Cherry St., N. 26th St. – W. Vliet St. to 120’ N. of W. Vliet St.
10/26/2016 03:30 PM UTC
OFFICIAL NOTICE 102-1-2016
WP-320: WASH WATER PIPING REHABILTATION, located at LINNWOOD WATER TREATMENT PLANT, 3000 N LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
10/11/2016 03:30 PM UTC
OFFICIAL NOTICE 93-1-2016
HP-184: COAGULATION BASIN #4 FLOCCULATOR UPGRADES LOCATED AT HOWARD WATER TREATMENT PLANT, 3929 SOUTH 6TH STREET, MILWAUKEE, WI 53221
10/04/2016 03:30 PM UTC
OFFCIAL NOTICE 106-1-2016
WATER MAIN RELAYS, located at the following locations: W. Scott St. (WT410061064), S. 4th St. to S. 6th St. (5 working days); W. Granada St. / S. 15th Pl. (WT410160724), S. 13th St. to 1300’ Northwest of S. Avalon St. (38 working days); S. Avalon St. / S. 15th Ct. (WT410160725), W. Granada St. to 1400’ Northwest of W. Granada St. (34 working days); E. Randolph Ct. (WT410160916), N. Dousman St. to 590’ East of N. Dousman St. (15 working days
09/30/2016 03:30 PM UTC
OFFICIAL NOTICE 108-1-2016
Water Main Relays – W. Birch Ave. (WT410160917), N. 57th St. to N. 58th St. (12 working days); N. 60th St. (WT410160918), W. Villard Ave. to W. Custer Ave. (46 working days); N. 91st St. (WT410160919), W. Courtland Ave. to W. Herbert St. (16 working days); W. Courtland Ave. (WT410160920), W. Herbert Ave. to N. 91st St. (23 working days);
09/29/2016 03:30 PM UTC
OFFICIAL NOTICE 104-1-2016
STORMWATER MANAGEMENT IMPROVEMENTS AT THE CENTURY CITY REDEVELOPMENT PROJECT, 3025 West Hopkins Street, Milwaukee, WI
09/28/2016 03:30 PM UTC
OFFICIAL NOTICE 101-1-2016
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: N. Downer Ave. – E. Newberry Blvd. to E. Locust St.; N. Prospect Ave. – E. Royall Pl. to E. Kane Pl.; N. Prospect Ave. – E. Wells St. to E. Kilbourn Ave.
09/27/2016 03:30 PM UTC
OFFICIAL NOTICE 107-1-2016
MUNICIPAL BUILDING, 11TH FLOOR AHU 6-7 COOLING COIL REPLACEMENT 841 NORTH BROADWAY MILWAUKEE, WI 53202
09/23/2016 03:30 PM UTC
OFFICIAL NOTICE 100-1-2016
SANITARY SEWER MAIN LINING, REPAIR AND MANHOLE REPAIR & LINING in: Area Bounded by: W. Center St., W. Vienna Ave., N. 59th St., and N. Argonne Dr. (Ext’d). N. 76th St. – W. Carmen Ave to W. Florist Ave.
09/21/2016 03:30 PM UTC
OFFICIAL NOTICE 97-1-2016
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKINGS, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211110112) S. 5th St. - W. Lincoln Ave. to W. Becher St., (ST211170103) W. Becher St. - S. 7th St. to S. 10th St. (Pedestrian Crossings)., ST211170104 – W. Oklahoma Ave. at S. 10th St. (Pedestrian Crossing).
09/16/2016 03:30 PM UTC
1121 - 1130 of 1601 Solicitations
1 2 109 110 111 113 115 116 117 160 161