General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 33-1-2016
WATER MAIN RELAYS at the following locations: N. 80th St. (WT410160620), W. Thurston Ave. to W. Carmen Ave. (18 Working Days); N. 84th St. (WT410160621), W. Carmen Ave. to W. Bobolink Ave. (20 Working Days); W. Custer Ave. (WT410160624), N. 87th St. to N. 91st St. (27 Working Days)
03/04/2016 04:30 PM UTC
OFFICIAL NOTICE 34-1-2016
Boulevard and Greenspace Mowing and Litter Removal. Work on this project shall consist of up to 26 weekly mowing cycles during the growing season on City-owned boulevards and greenspaces City-wide. Boulevard and Greenspace Mowing and Litter Removal shall begin on or about April 1, 2016 and continue to October 15, 2016.
03/03/2016 04:30 PM UTC
OFFICIAL NOTICE 7-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 7-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 16-1-2016
7TH DISTRICT POLICE STATION RTUs REPLACEMENT 3626 WEST FOND DU LAC AVENUE MILWAUKEE WI
03/01/2016 04:30 PM UTC
OFFICIAL NOTICE 6-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
OFFICIAL NOTICE 6-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
OFFICIAL NOTICE 3-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 3-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 2-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
1211 - 1220 of 1601 Solicitations
1 2 118 119 120 122 124 125 126 160 161