General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2014
WP-318: SOUTH FILTERED WATER RESERVOIR ROOF REPLACEMENT PROJECT LOCATED AT 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
04/09/2014 02:30 PM UTC
OFFICIAL NOTICE 48-1-2014
2014 BYPASS PUMP REHABILITATION PART 1
04/04/2014 03:30 PM UTC
OFFICIAL NOTICE 41-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, RUBBLIZING CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWER WORK, SODDING, ETC, located at (ST211130117) N. 73rd St. – W. Calumet Rd. to W. Bradley Rd.; (ST211130107) W. Tower Ave. – N. 87th St. to N. Faulkner Rd.
04/03/2014 03:30 PM UTC
OFFICIAL NOTICE 17-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211040132) S. Honey Creek Dr. – W. Cold Spring Rd. to S. 60th St. (Including W Leroy Ave – S. 57th St. to S. Honey Creek Dr.); (ST211110117) S. 67th St. – W. Fremont Pl. to W. Cleveland Ave.; (ST211130137) S. 28th St. – A point south of W. Cleveland Ave. (U.P.R.R.) to W. Cleveland Ave.
04/02/2014 03:30 PM UTC
OFFICIAL NOTICE 15-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211110111) S. 2nd St. – A point south of W. Norwich St. to W. Howard Av.; (ST211120107) S. Griffin Av. – E. Morgan Av. to E. Holt Ave.
03/28/2014 03:30 PM UTC
OFFICIAL NOTICE 39-1-2014
Expansion bearing replacement and overhead concrete surface repairs at the Sixth Street Viaduct Cable-Stayed Bridges.
03/27/2014 03:30 PM UTC
OFFICIAL NOTICE 28-1-2014
SANITARY SEWER AND STORM SEWER MAIN LINING AND REPAIR, & MANHOLE REPAIR AND LINING IN S. Howell Ave. - E./W. Howard Ave. to E./W. Layton Ave.
03/25/2014 03:30 PM UTC
OFFICIAL NOTICE 28-2-2014
COMBINED SEWER MAIN RELAY AND LINING & STORM SEWER MAIN INSTALLATION IN N. ASTOR ST - E. HAMILTON ST. TO 200'+/- NORTH OF E. LAND PL., AND E. JUNEAU AVE. - N. MARKET ST. TO N. MILWAUKEE ST.
03/25/2014 03:30 PM UTC
OFFICIAL NOTICE 43-1-2014
Channel Maintenance: Noyes Park Creek (East of N. 74th St) from W. Acacia St. to W. Green Tree Rd.
03/24/2014 03:30 PM UTC
OFFICIAL NOTICE 26-1-2014
This project involves the Traffic Deck Recoating and Repairs of the 7th Street Level of the MacArthur Square Parking Structure located at 841 North James Lovell Street, Milwaukee, WI 53202.
03/21/2014 03:30 PM UTC
1381 - 1390 of 1518 Solicitations
1 2 135 136 137 139 141 142 143 151 152