General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 83-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CURB AND GUTTER, PAVEMENT GRINDING, SEWER WORK, ETC. located at (ST211140111) W. Beatrice St. – N. 96th St. to N. 97th St. (incl. N. 97th St. – W. Beatrice St. to N. Michelle St.); (ST211140118) W. Helena St. - N. 86th St. to N. 90th Blvd. (incl. W. Helena Ct.)
07/14/2014 03:30 PM UTC
OFFICIAL NOTICE 61-1-2014
CONSTRUCTION OF 7" CONCRETE PAVEMENT, 5" CONCRETE WALK, CURB AND GUTTER, CONCRETE REMOVAL, SEWER WORK, ETC. located at (ST211120110) E. Manitoba St. - Pt. E. of S. Hanson Av. to S. Clement Av.
07/08/2014 03:30 PM UTC
OFFICIAL NOTICE 60-1-2014
CONSTRUCTION OF 7" CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, CUTTING, ETC. located at (ST212060127) Alley betw. W. Lapham St, W. Mitchell St, S. 31st St, and S. 32nd St.; (ST212040120) Alley betw. W. Becher St, W. Rogers St, S. 6th St, and S. 7th St.; (ST212070103) Alley betw. W. Crawford Ave, W. Howard Av, S. 16th St, and S. 17th St. (E/W Leg); (ST212130107) Alley betw. S. Bay St, S. Clement Av, E. Potter Ave, and E. Russell Ave.
07/02/2014 03:30 PM UTC
OFFICIAL NOTICE 88-1-2014
WATER MAIN RELAYS - W. Carmen Ave.(WT410110618), N. 62nd St. to N. 63rd St.; W. Bobolink Ave.(WT410110620), N. 60th St. to N. 61st St.; W. Oriole Dr.(WT410110623), N. 33rd St. to N. 35th St.; E. Hartford Ave.(WT410110642), N. Shepard Ave. to N. Marietta Ave.; N. Shepard Ave.(WT410110643), E. Hartford Ave. to E. Newport Ave.; W. Custer Ave.(WT410101013), N. 44th St to N. 45th St.
07/01/2014 03:30 PM UTC
OFFICIAL NOTICE 77-1-2014
SANITARY SEWER MAINS RELAY, STORM SEWER MAINS RELAY, AND SANITARY SEWER LINING in: N. 23rd St. – 110’+ North of W. Capitol Dr. to W. Hope Ave., N. 44th St. – W. Center St. to W. Locust St., N. 46th St. – W. Auer Ave. to W. Concordia Ave., N. 55th St. – W. Burleigh St. to W. Auer Ave./W. Louise Pl., N. Holton St. – 5’+ South of E. Nash St. to 30’+ North of E. Nash St., W. Lisbon Ave. – W. Center St. to N. Avondale Blvd., N. 68th St. – W. Center St. to W. Lisbon Ave.
06/27/2014 03:30 PM UTC
OFFICIAL NOTICE 76-1-2014
COMBINED SEWER MAINS RELAY AND LINING & MANHOLE REPAIR AND LINING in: S. 3rd St. – W. Greenfield Ave. to 300' south of W. Orchard St. S. 5th St. – 90' +/- north of W. Florida St. to 150' south of W. Florida St. S. 11th St. – W. Cleveland Ave. to 400' +/- south of W. Cleveland Ave. S. 17th St. – 150' +/- south of W. Becher St. to W. Grant St. S. 21st St. – W. Greenfield Ave. to W. Mitchell St. W. Arrow St. – S. Union St. to S. Comstock Ave. W. Mitchell St. – S. 20th St. to S. 21st St. W. Scott St. – S. 10th St. to S. 15th St.
06/25/2014 03:30 PM UTC
OFFICIAL NOTICE 72-1-2014
Installation of traffic calming speed humps at W. Vilter La., S. 31st St., N. 49th St., and N. 83rd St. in various Aldermanic Districts
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 75-1-2014
SANITARY, STORM, AND COMBINED SEWER MAINS RELAY, COMBINED SEWER LINING, AND SANITARY SEWER ABAONDONMENT in: S. 28th St. – W. Hayes Ave. to W. Forest Home Ave. S. 35th St. – 270’ N. of W. Mitchell St. to 300’ S. of W. Burnham St. S. 42nd St. (Various Locations) – W. Forest Home Ave. to 100’ +/- S. of W. Euclid Ave. W. Euclid Ave. – S. 42nd St. to S. 43rd St.
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 55-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALT PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, POROUS PAVEMENT, RETAINING WALL, ETC, located at (TD06780002) The Brewery Phase 4 (W. Highland Ave., W. McKinley Ave., W. Winnebago St., N. 8th St., N. 9th St., N. 10th St., N. 11th St.) ALTERNATE 1: W. Winnebago St. - N. 8th St. (ext'd) to N. 10th St. (s. of s. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W. Winnebago St., N 8th St., N. 9th St., N 10th St., N 11th St. ALTERNATE 2: W. Highland Av. - N. 8th St. to N. 10th St. (n. of n. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W Winnebago St., N. 8th St., N 9th St., N 10th St., N. 11th St.)
06/18/2014 03:30 PM UTC
OFFICIAL NOTICE 54-1-2014
CONSTRUCTION OF 9” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211130136) E. Greenfield Ave. - Kinnickinnic River to S. 1st St.
06/17/2014 03:30 PM UTC
1341 - 1350 of 1518 Solicitations
1 2 131 132 133 135 137 138 139 151 152