General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 63-3-2014
SANITARY AND STORM SEWER MAINS RELAY AND STORM SEWER MAIN REPAIR in: S. 20th St. – W. Ohio Ave. to W. Morgan Ave., S. 30th St. (East Road) – W. Oklahoma Ave. to 130’ +/- S. of W. Euclid Ave., S. 31st St. – W. Oklahoma Ave. to W. Euclid Ave., and W. Ohio Ave. – S. 19th St. to S. 20th St.
06/04/2014 03:30 PM UTC
OFFICIAL NOTICE 58-1-2014
Impact Damage Repairs at the 35th Street and Howell Avenue Bridges over the Union Pacific Railroad including but not limited to partial concrete deck replacement, steel girder replacement, sandblasting and painting steel members, bearing replacement, and heat straightening girders.
06/03/2014 03:30 PM UTC
OFFICIAL NOTICE 62-2-2014
COMBINED, SANITARY AND STORM SEWER MAINS RELAY in: S. Adams Ave. – E. Fremount Pl. to E. Montana St. E. Bolivar Ave. (Various Locations) – S. Austin St. to S. Pine Ave. S. Hanson Ave. – E Oklahoma Ave. to 190’ +/- North of Euclid Ave. E. Oklahoma Ave. – S. Nevada Ave. to S. Hanson Ave.
06/02/2014 03:30 PM UTC
OFFICIAL NOTICE 62-3-2014
COMBINED AND SANITARY SEWER MAINS RELAY in: S. New York Ave. – E. Fernwood Ave. to E. Ohio Ave. E. Ohio Ave. – S. Pennsylvania Ave. to S. New York Ave. E. Wilbur Ave. – S. Alabama Ave. to S. Kansas Ave.
06/02/2014 03:30 PM UTC
OFFICIAL NOTICE 62-1-2014
COMBINED, SANITARY AND STORM SEWER MAINS LINING & REPAIR AND MANHOLE REPAIR in: S. 6th St. – W. Manitoba St. to W Euclid Ave. E. Anderson Ave. – S. 1st St. to 400’ +/- East of S.1st St. E. Tripoli Ave. – 350’ +/- East of S. Clement Ave to S. Clement
06/02/2014 03:30 PM UTC
OFFICIAL NOTICE 34-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140165) Asphalt Overlay by Contract; N. 54th St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 53rd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 52nd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; W. Keefe Ave. – N. 20th St. to N. Hopkins St.; N. 68th St. – W. Capitol Dr. to W. Hampton Ave.
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 64-1-2014
SAFETY ACADEMY DOMESTIC HOT WATER SYSTEM-SYSTEM UPGRADE 6680 NORTH TEUTONIA AVENUE MILWAUKEE, WI
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 31-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140103) High Impact Asphalt Overlay #3; N. Holton St. – E. Reservoir to E. North; N. Humboldt Blvd. – E. Meinecke to E. Keefe; E. Brady St. – N. Farwell to N. Water
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 56-1-2014
2014 GREEN STREET MEDIAN PROJECT - BIORETENTION FACILITY
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 35-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140166) Asphalt Overlay: W. Grange Ave. – S. 6th St. to S. 13th St.; S. 10th St. – W. Carpenter Ave. to W. Layton Ave.; W. Carpenter Ave. – S. 6th St. to S. 10th St.
05/21/2014 03:30 PM UTC
1361 - 1370 of 1518 Solicitations
1 2 133 134 135 137 139 140 141 151 152