General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 94-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211050150 – South Robinson Avenue – East Ward Street to East Becher Street
10/22/2024 03:30 PM UTC
OFFICIAL NOTICE 106-1-2024
Milwaukee Police Department – Police Administration Building Service, ATS, & Paralleling Gear Upgrades
10/17/2024 03:30 PM UTC
OFFICIAL NOTICE 111-1-2024
C/O Milwaukee Health Department (MHD) – Salvation Army Emergency Lodge Indoor Air Quality (IAQ) Upgrades
10/16/2024 03:30 PM UTC
OFFICIAL NOTICE 74-1-2024
The general work requested is: CONSTRUCTION OF, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGHT CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, PAVEMENT MARKINGS, SIGNAGE INSTALLATION, CONCRETE REMOVALS, SEWER WORK, WATER WORK, CUC AJUSTMENT, ELECTRICAL CONDUIT INSTALLATION, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230124 - North Prospect Avenue – East Knapp Street to East Ivanhoe Place ST211230140 - North Water Street – East Brady Street to North Humboldt Avenue
10/15/2024 03:30 PM UTC
OFFICIAL NOTICE 110-1-2024
200 Lead Service Line Replacements
10/14/2024 03:30 PM UTC
OFFICIAL NOTICE 98-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
10/10/2024 03:30 PM UTC
OFFICIAL NOTICE 81-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, CUC AJUSTMENT, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211210223 – In South 37th Street from West Becher Street to West Burnham Street
10/08/2024 03:30 PM UTC
OFFICIAL NOTICE 89-1-2024
SANITARY AND STORM SEWER MAIN RELAY & SANITARY AND STORM SEWER MAIN LINING S. 24th St. - W. Euclid Ave. to W. Ohio Ave. S. 26th St. - W. Oklahoma Ave. to W. Ohio Ave. S. 28th St. - W. Oklahoma Ave. to W. Euclid Ave. S. 29th St. - W. Oklahoma Ave. to 120' South of W. Euclid Ave. W. Euclid Ave. - S. 27th St. to S. 31st St.
09/27/2024 03:30 PM UTC
OFFICIAL NOTICE 75-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230105 – In North 23rd Street Humboldt from West Ruby Avenue to West Cornell Street
09/26/2024 03:30 PM UTC
OFFICIAL NOTICE 91-1-2024
Boiler Replacement – Forestry District HQ, South The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around city contracted Johnson Controls as the only acceptable manufacturer to match existing system.
09/18/2024 03:30 PM UTC
131 - 140 of 1525 Solicitations
1 2 10 11 12 14 16 17 18 152 153