General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 77-1-2024
The general work requested is: REMOVAL AND CONSTRUCTION OF: 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, SAWING AND SODDING & TOPSOIL, GRAVEL FILLING, OTHER CONCRETE REMOVALS, ETC.; Located at: ST230240102 - Scattered Sites Sidewalk Replacements at Various Locations City Wide
09/04/2024 03:30 PM UTC
OFFICIAL NOTICE 99-1-2024
Poured-In-Place Resilient Cork Surface Installation – Various MKE Parks Locations Located at: 29th & Melvina (3840 N 29th Street, Milwaukee, WI 53216) Al Jarreau Park (2929 N 30th Street, Milwaukee, WI 53210) 26th & Medford (2478 N 26th Street, Milwaukee, WI 53206)
08/29/2024 03:30 PM UTC
OFFICIAL NOTICE 95-1-2024
Roof Replacement at MFD, Engine House #39, 8025 West Bradley Road, Milwaukee, Wisconsin 53233.
08/28/2024 03:30 PM UTC
OFFICIAL NOTICE 76-1-2024
The general work requested is: CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK ETC.; Located at: ST230240101 - Areawide Sidewalk Replacement in the Area Bounded By (ABB): ABB: S. 20th St., W. Oklahoma Ave., S. 35th St and the KK River ABB: N. Hi Mount Blvd., W. Vine St., N. 55th St. and W Lloyd St. Schools Located @ 6215 W. Warnimont Ave. (Hamilton H.S.) & 6701 W. Eden Pl. (Honey Creek Elem. Sch.) ST216240110 - ADA Ramps for 2024 & Areawide Sidewalk Replacement Project
08/27/2024 03:30 PM UTC
OFFICIAL NOTICE 78-1-2024
This project consists of the demolition, disposal, and replacement of an uninterruptible power supply (UPS) at Florist Pumping Station.
08/20/2024 03:30 PM UTC
OFFICIAL NOTICE 97-1-2024
ABB SANITARY SEWER CLEANING AND EXAMINATION in: Area bounded by: S. 6th St to S. 24th St. and W. Waterford Ave. to W. Ramsey Ave.
08/16/2024 03:30 PM UTC
OFFICIAL NOTICE 46-1-2024
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212220121 - North Bremen Street, East Center Street, East Clarke Street, and North Weil Street (Permeable Alley) ST212220110 - West Burleigh Street, West Chamber Street, North 88th Street, and North 89th Street (Permeable Alley) ST212230101 - West Capitol Drive, West Melvina Street, North 52nd Street, and North 53rd Street (Permeable Alley) ST212220117 - West Galena Street, West Vliet Street, North 51st Street, and North 52nd Street (Permeable Alley) ST212220120 - West Congress Street, West Marion Street, South 61st Street, and South 63rd Street (Permeable Alley) ST212220109 - West Rohr Avenue, North Sherman Boulevard, West Villard Avenue and North 44th Street (Permeable Alley)
08/15/2024 03:30 PM UTC
OFFICIAL NOTICE 23-1-2024
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, TREE CLEARING & GRUBBING, ETC.; Located at: ST320210201 - North 20th Street Powerline and Beerline Trail Pedestrian/Bike Improvements (Wisconsin Department of Transportation ID No. 2984-22-75)
08/14/2024 03:30 PM UTC
OFFICIAL NOTICE 86-1-2024
COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: E. Bennett Ave. – S. Mabbett Ave. to S. Kinnickinnic Ave. S. California St. – E. Pryor Ave. to S. Kinnickinnic Ave. S. Ellen St. – S. Kinnickinnic Ave. to E. Rusk Ave. E. Estes St. – S. Ellen St. to S. Wentworth Ave. E. Rusk Ave. – 40’+/- W. of S. Linebarger Terr. to S. Ellen St. E. Seeley St. – S. Clement Ave. to 450’ E. of S. Clement Ave.
08/07/2024 03:30 PM UTC
OFFICIAL NOTICE 21-1-2024
PROJECT NO.1: COMBINED SEWER MAIN RELAY IN: N. 40th St. – W. Chambers St. to W. Burleigh St. Plan File:         2024-069, 2024-132         Dated: 7/1/24, 7/12/24 Project ID:       SM495230041 W. Auer Ave. – N. 28th St. to N. 30th St. Plan File:         2024-071, 2024-132          Dated: 6/28/24, 7/12/24 Project ID:       SM495230056 W. Chambers St. – N. 28th St. to 130' +/- W. of N. 30th St. Plan File:         2023-097, 2023-132          Dated: 4/9/24, 7/12/24 Project ID:       SM495240018
07/31/2024 03:30 PM UTC
151 - 160 of 1525 Solicitations
1 2 12 13 14 16 18 19 20 152 153