General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 55-1-2026
Kneeland Properties Infrastructure Improvement Project - 825, 907, and 1025 West Mt. Vernon Avenue, Milwaukee, WI
06/30/2026 03:30 PM UTC
OFFICIAL NOTICE 6-2-2026
PROJECT NO. 2: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 15th St. – W. Meinecke Ave. to W. Wright St. N. 15th St. – W. North Ave. to W. Meinecke Ave.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 6-1-2026
PROJECT NO. 1: SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING. Located at: N. 42nd St. – 50’ S. of W. Courtland Ave. to 50' N. of W. Courtland Ave. N. 55th St.– W. Townsend St. to W. Keefe Ave. W. Keefe Ave.– N. 53rd St. to N. 60th St.
07/01/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 83-1-2025
Concrete Repairs and Membrane Recoating at the 2nd and Plankinton Parking Structure
08/01/2025 03:30 PM UTC
OFFICIAL NOTICE 28-1-2025
PROJECT NO.1: SANITARY SEWER MAIN RELAY, STORM SEWER MAIN RELAY, AND COMBINED SEWER MAIN RELAY IN: N. 45th St. - W. Juneau Ave. to W. Vliet St. N. 46th St. - W. Juneau Ave. to W. Vliet St. N. 46th St. - W. North Ave. to W. Wright St. N. 47th St. - W. Center St. to W. Hadley St. N. 47th St. - W. Townsend St. to W. Keefe Ave. W. Juneau Ave. – N. 44th St. to N. 46th St.
07/30/2025 03:30 PM UTC
OFFICIAL NOTICE 85-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
07/25/2025 03:30 PM UTC
OFFICIAL NOTICE 60-1-2025
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.
07/16/2025 03:30 PM UTC
OFFICIAL NOTICE 19-1-2025
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 9” CONCRETE PAVEMENTS, CONCRETE TRAFFIC ISLAND, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, CONCRETE CURB PEDESTRIAN, 5” and 7” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT SAWING, VARIOUS PAVEMENT MARKINGS, GRAVEL FILLING, CONCRETE REMOVALS, SODDING AND TOPSOIL, ENGINEERING SOIL, SEWER WORK, WATER WORK, ETC
07/10/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
101 - 110 of 1588 Solicitations
1 2 7 8 9 11 13 14 15 158 159