General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE NO. 11-1-2026
Description: Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5” Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6” Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216250111 – ADA Ramps for 2026 High Impact Paving @ Various Locations (South Side Projects). The scope of this contract is to remove and replace the ADA ramp on Menomonee River Pkwy/Tower View Rd. In addition, all of the pedestrian ramps within the limits of the following “high-impact” asphalt paving projects as follows: O.N. 14-1-2026 S. 52nd Pl. - W. Cleveland Av. to S. 53rd St. N. 68th St. - W. Center St. to W. Lisbon Av. N. 80th St. - W. Burleigh St. to W. Lisbon Av. N. 81st St. - W. Lorraine Pl. to W. Burleigh St. S. 89th St. - W. Howard Av. to W. Warnimont Av. S. 90th St. - W. Crawford Av. to W. Warnimont Av. N. 90th St. - W. Hawthorne Av. to W. Mt. Vernon Av. S. 91st St. - W. Morgan Av. to W. Holt Av. S. 99th St./Ct. - A point south of W. Ohio Av. to W. Oklahoma Av. W. Concordia Av. - N. 84th St. to N. 92nd St. W. Mount Ct. - N. 54th St. to N. 55th St. W. Ohio Av. - S. 97th St. to S. 99th Ct. W. St. Paul Av. - N. Hawley Rd. to N. 62nd St. O.N. 15-1-2026 S. 1st Pl.- W. Bolivar Av. to W. Waterford Av. S. 1st St. - W. Bolivar Av. to W. Waterford Av. S. 2nd St. - W. Bolivar Av. to W. Waterford Av. S. 5th Pl. - W. Armour Av. to W. Bottsford Av. S. 10th St. - W. Washington St. to W. National Av. S. 14th St. - A point south of W. Cleveland Av. to W. Cleveland Av. S. 29th St. - W. Lapham St. to W. Greenfield Av. S. 34th St. - W. Kinnickinnic River Pk. to W. Forest Home Av. S. 34th St. - W. Oklahoma Av. to W. Manitoba St. E. Armour Av. - S. Quincy Av. to S. Howell Av. E. Euclid Av. - S. Brust St. to S. Clement Av. E. Falling Heath Pl. - S. Kinnickinnic Av. to S. Pennsylvania Av. S. Hanson Av. - E. Howard Av. to E. Saveland Av. E. Malvern Pl. - S. Pennsylvania Av. to S. Kinnickinnic Av. W. Manitoba St. - S. 6th St. to S. 11th St. W. Rogers St. - S. 6th St. to Point east of S. 8th St. E. Tripoli Av. - S. Brust Av. to S. Hanson Av.
03/18/2026 03:30 PM UTC
OFFICIAL NOTICE 37-1-2026
PROJECT 1: 2026 SANITARY BYPASS PUMP CONTROL CABINET REPLACEMENT AND SERVICE UPGRADES Located at: Various Locations
03/19/2026 03:30 PM UTC
OFFICIAL NOTICE 46-1-2026
Concrete Repairs and Painting of the Lower Level of MacArthur Square Parking Structure
03/25/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 44-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST216250102 – In West Burleigh Street – West Hopkins Street to North Sherman Boulevard
04/22/2025 03:30 PM UTC
OFFICIAL NOTICE 11-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTHIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216250106 – Official Notice No. 11-1-2025 The “High Impact” asphalt paving project locations are as follows: South 5th Place – A Point South of West Plainfield Avenue to West Howard Avenue South 15th Place – West Oklahoma Avenue to point north of West Dakota Street South 21st Street – West Forest Home Avenue to West Grant Street South 22nd Street – West Carpenter Avenue to West Layton Avenue South 33rd Street – West Lakefield Drive to West Oklahoma Avenue West Arthur Avenue – South 13th Street to South 16th Street South Austin Street – East Armour Avenue to East Norwich Avenue West Becher Street – South Muskego Avenue to South 24th Street West Bruce Street – South 12th Street to West Reynolds Place West Euclid Avenue – South 39th Street to South 43rd Street West Halsey Avenue – South 18th Street to South 20th Street East Howard Avenue – East City Limits to South Clement Avenue South Linebarger Trail – South Kinnickinnic Avenue to East Iron Street South Logan Avenue – East Conway Street to East Lincoln Avenue West Pierce Street – South 16th Street to West Reynolds Street South Superior Street – East Russell Avenue to East Conway Street West Waterford Avenue – A Point 200’ +/- East of South 5th Street to South 5th Place
04/17/2025 03:30 PM UTC
OFFICIAL NOTICE 10-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTHIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216250105 – Official Notice No. 10-1-2025 The “High Impact” asphalt paving project locations are as follows: North 33rd Street – West McKinley Boulevard to West Vliet Street North 37th Street – West Locust Street to West Fond du Lac Avenue North 51st Street – West North Avenue to West Lisbon Avenue North 53rd Street – West Lisbon Avenue to West Burleigh Street South 57th Street – West Morgan Avenue to West Oklahoma Avenue North 58th Street – West McKinley Avenue to West Washington Boulevard (skip West Vliet Street to West Galena Street) North 60th Street – West Fairview Avenue to West Bluemound Road South 64th Street – West Dickinson Street to West Fairview Avenue South 85th Street – West Holt Avenue to West Euclid Avenue South 86th Street – West Morgan Avenue to West Euclid Avenue West Clarke Street – North 40th Street to North Sherman Boulevard West Dakota Street – South 49th Street to South 51st Street West Dickinson Street – South 68th Street to South 70th Street West Holt Avenue – South 79th Street to South 80th Street West Park Hill Avenue – North 90th Street to North 91st Street West Spaulding Place – North 42nd Street to North Sherman Boulevard West Stack Drive – South 55th Street to South 60th Street South Tennessee Avenue – West Van Norman Avenue to Louisiana Avenue West Townsend Street – North 84th Street to North 92nd Street
04/16/2025 03:30 PM UTC
OFFICIAL NOTICE 9-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTHIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216250104 – Official Notice No. 9-1-2025 The “High Impact” asphalt paving project locations are as follows: North 19th Place – West Glendale Avenue to West Hampton Avenue North 19th Street - West Hampton Avenue to West Eggert Place North 26th Street - West Galena Street to West Lisbon Avenue North 31st Street - West Lisbon Avenue to West North Avenue North Bartlett Avenue - East Kane Place to East North Avenue North Blaine Place - West Center Street to West Lisbon Avenue West Concordia Avenue - North 15th Street to North Teutonia Avenue West Congress Street - North Green Bay Avenue to West Roosevelt Drive West Courtland Avenue - North Green Bay Avenue to North Parkway Avenue East Lafayette Place - North Prospect Avenue to North Bartlett Avenue East Locust Street - North Humboldt Boulevard to North Holton Street West Locust Street - North 20th Street to North 29th Street North Newhall Street - East Belleview Place to East Park Place North Richards Street - East Capitol Drive to 1100' +/- n/o East Hope Avenue West Sheridan Avenue - North Teutonia Avenue to North 38th Street North Terrace Avenue - East Belleview Place to North Wahl Avenue West Vienna Avenue - North 1st Street to North Port Washington Avenue East Windsor Place - North Lake Drive to North Summit Avenue East Woodstock Place – North Terrace Avenue to North Prospect Avenue
04/15/2025 03:30 PM UTC
OFFICIAL NOTICE 37-1-2025
The project is located at City of Milwaukee Safety Academy and the project is the upper roof section. The project consists 4 roof sections and work includes the removal of the ballasted EPDM/Adhered EPDM roof systems down to the structural decking. Repair and replace existing decking as needed. The contractor will install a new Adhered EPDM roof system with minor alterations, details to include new metal edge details, new expansion joint caps, and a new perimeter guardrail system. A new manufacturer warranty and installer warranty is required by the owner.
04/09/2025 03:30 PM UTC
101 - 110 of 1548 Solicitations
1 2 7 8 9 11 13 14 15 154 155