General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 17-1-2025
HARBOR DISTRICT RIVERWALK PROJECT - SOUTH
02/20/2025 04:30 PM UTC
OFFICIAL NOTICE 15-1-2025
A. This project consists of permanently abandoning a well that is located in our Robert Anderson Tower basement. The well is 1834 feet deep. There is wood floating in water at around 319 feet deep. The wood will need to be removed per WDNR. Additionally, the 12-inch diameter ungrouted liner would either need to be removed, shot, or ripped prior to abandoning the well (ss. NR 811.13(4)(a) & NR 811.13(4)(d), Wis. Adm. Code). The well must be abandoned per ss. NR 811.13(4)(a) & NR 811.13(4)(d), Wis. Adm. Code. Once completed, the contractor would then need to submit a well filling and sealing report in accordance with (s. NR 811.13(8), Wis. Adm. Code).
02/19/2025 04:30 PM UTC
OFFICIAL NOTICE 30-1-2025
500 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 30-2-2025
500 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 30-3-2025
200 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 31-1-2025
WATER MAIN RELAYS AND HYDRANT ALTERATIONS, at the following locations: E Michigan St (WT410240733), N Cass St to N Lincoln Memorial Dr (3 working days); S 43rd St (WT410240736), W Howard Ave to W Cold Spring Rd (3 working days); N 35th St (WT410240737), W Lisbon Ave to W North Ave (3 working days); W Morgan Ave (WT410240739), S 6th St to S 20th St (4 working days); W Lisbon Ave (WT410240753), W Burleigh St to N 100th St (35 working days). (Note: Contractor to furnish and install approximately 556 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 22-1-2025
Traffic Safety Improvements, High Impact Asphaltic Concrete Paving & ADA Sidewalk Project
02/14/2025 04:30 PM UTC
OFFICIAL NOTICE 23-1-2025
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 1A. Bounded by Capitol Drive to north City limits and Sherman Boulevard to west City limits
02/12/2025 04:30 PM UTC
OFFICIAL NOTICE 23-2-2025
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 3. Bounded by North Avenue, N. 27th Street, Capitol Drive, and N. 20th Street
02/12/2025 04:30 PM UTC
OFFICIAL NOTICE 21-1-2025
Traffic Safety Improvements, High Impact Asphaltic Concrete Paving & ADA Sidewalk Project: North 60th Street: West Green Tree Road to West Hemlock Street, Local Streets w/o North 60th Street
02/11/2025 04:30 PM UTC
101 - 110 of 1518 Solicitations
1 2 7 8 9 11 13 14 15 151 152