We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 99-2-2025
WP-346 Cameron Window Improvement Project
11/11/2025 04:30 PM UTC
OFFICIAL NOTICE 97-1-2025
SANITARY SEWER MAIN RELAY AND SANITARY SEWER MAIN LINING IN: N. Lincoln Memorial Dr. – 550’ SW of the Pump Station at Bradford Beach to E. Kenwood Blvd.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 97-2-2025
COMBINED SEWER MAIN LINING IN: Vacated W. Galena St. – Vacated N. 2nd St. to N. Dr. Martin Luther King Jr. Dr.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 100-1-2025
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS
10/30/2025 03:30 PM UTC
OFFICIAL NOTICE 82-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING located at: S. 19th St. - W. Grant St. to W. Lincoln Ave. W. Arthur Ave. - S. 30th St. to S. 31st St. W. Lincoln Ave. - S. 31st St. to S. 32nd St. W. Lincoln Ave. - S. 32nd St. to S. 33rd St. W. Grant St. - S. 36th St. to 300' W. of S. 36th St.
10/24/2025 03:30 PM UTC
OFFICIAL NOTICE 93-1-2025
PROJECT 1: LARGE DIAMETER SEWER EXAMS Area Bounded By W. Oklahoma Ave. to W. Keefe Ave. and S. Delaware Ave. to N. 55th St.
10/10/2025 03:30 PM UTC
OFFICIAL NOTICE 94-1-2025
CLEARANCE AND HAZARDOUS BRANCH PRUNING OF CITY-OWNED TREES WITHIN THE TREE BORDER AND BOULEVARDS Located at: Various locations throughout the City of Milwaukee in the public right of way.
10/09/2025 03:30 PM UTC
OFFICIAL NOTICE 88-1-2025
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, PERMEABLE PAVER BLOCKS, DETECTABLE WARNING FIELDS, INSTALLATION OF VARIOUS CONDUITS AND OTHER ELECTRICAL APPURTENANCES, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, VARIOUS GEOSYNTHETIC MATERIAL ASSEMBLY/INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, SEWER WORK, WATER WORK, TREE CLEARING AND GRUBBING, ETC.; Located At: ST211230135 – South 9th Street - West Greenfield Avenue to West Washington Street
10/08/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC