General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 23-1-2025
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 1A. Bounded by Capitol Drive to north City limits and Sherman Boulevard to west City limits
02/12/2025 04:30 PM UTC
OFFICIAL NOTICE 23-2-2025
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 3. Bounded by North Avenue, N. 27th Street, Capitol Drive, and N. 20th Street
02/12/2025 04:30 PM UTC
OFFICIAL NOTICE 21-1-2025
Traffic Safety Improvements, High Impact Asphaltic Concrete Paving & ADA Sidewalk Project: North 60th Street: West Green Tree Road to West Hemlock Street, Local Streets w/o North 60th Street
02/11/2025 04:30 PM UTC
OFFICIAL NOTICE 5-1-2025
2025 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/17/2025 04:30 PM UTC
OFFICIAL NOTICE 123-1-2024
PROJECT NO. 1: BIOSWALES Located at: Area Bounded by: W. Congress St., N. 84th St., W. Marion St. and N. 87th St.
12/23/2024 04:30 PM UTC
OFFICIAL NOTICE 84-1-2024
WATER MAIN RELAYS, at the following locations: N 32nd St (WT410160681), W Center St to W Locust ST (26 working days); W Fairmount Ave (WT410220679), W Appleton Ave to N 89th St (6 working days); N 89th St (WT410220680), W Hampton Ave to W Fairmount Ave (21 working days); W Stark St (WT410220681), W Appleton Ave to N 91st St (22 working days); W Potomac Ave (WT410220682), N 86th St to 70’ N/O W Fairmount Ave (21 working days); N 88th St (WT410220683), W Hampton Ave to W Potomac Ave (26 working days); N 90th St (WT410220684), W Hampton Ave to 425’ N/O W Stark St (19 working days). (Note: Contractor to furnish and install approximately 8973 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/18/2024 04:30 PM UTC
OFFICIAL NOTICE 120-1-2024
WATER MAIN RELAYS, at the following locations: W. CONGRESS ST. (WT410230633), N. 60TH ST. TO N. 63RD ST., (23 working days); W. MEDFORD AV./ N. 61ST ST. (WT410230634), W. CONGRESS ST. TO N. 64TH ST., (33 working days); N.63RD ST. / W. BALDWIN ST. (WT410230635), 250' S/O W. RUBY AV. TO W. MEDFORD AV., (11 working days); W. RUBY AV. (WT410230636), N. 63RD ST. TO N. 65TH ST., (11 working days); W. RUBY AV. (WT410230637), N. 66TH ST. TO N. 68TH ST., (11 working days); N. 68TH ST. (WT410230638), W. CONGRESS ST TO W. GLENDALE AV., (29 working days); S. 79TH ST. (WT410230654), W. OHIO AV. TO W. VERONA CT., (22 working days); S. 81ST ST. (WT410230655), W. BURDICK AV. TO W. OHIO AV., (10 working days); W. BURDICK AV. (WT410230680), W RIVER BEND DR. TO S. 75TH ST., (16 working days); W. RIVER BEND DR. (WT410230681), W. BURDICK AV. TO W. HONEY CREEK DR., (6 working days); S. 75TH ST. (WT410230682), W. HONEY CREEK DR. TO W. OHIO AV., (11 working days); (Note: Contractor to furnish and install approximately 9,327 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/17/2024 04:30 PM UTC
OFFICIAL NOTICE 121-1-2024
WATER MAIN RELAYS, at the following locations: N. Stowell Av. (WT410230607), E. Belleview Pl. to E. Park Pl. (19 working days); E. Belleview Pl. (WT410230608), N. Maryland Av. to N. Stowell Av. (24 working days); N. Prospect Av. (WT410230609), E. Belleview Pl. to E. Park Pl. (17 working days); N. 18th St. (WT410230660), W. McKinley Av. to W. Vliet St. (9 working days), W. McKinley Av. (WT410230661), N. 18th St. to N. 20th St. (13 working days); N. 20th St. (WT410230662), W. Juneau Av. to W. Vliet St. (15 working days); W. Juneau Av. (WT410230663), N. 18th St. to N. 20th St. (12 working days); N. 23rd St. (WT410230664), W. Kilbourn Av. to W. State St. (16 working days); W. Kilbourn Av. (WT410230665), N. 20th St. to N. 24th St. (20 working days); N. 26th St. (WT410230683), W. Michigan St. to W. Wisconsin Av. (7 working days); W. Michigan St. (WT410230684), N. 26th St. to N. 27th St. (7 working days); W. Kilbourn Av. (WT410230699), N. 24th St. to N. 25th St. (21 working days). (Note: Contractor to furnish and install approximately 8493 lin. ft. of 16”, 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/17/2024 04:30 PM UTC
OFFICIAL NOTICE 118-1-2024
The general work requested is: CONSTRUCTION OF, CONSTRUCTION STAKING, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, CONCRETE TRAFFIC ISLAND, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, MULTIPLE PAVEMENT MARKINGS, SIGNAGE INSTALLATION, SEWER WORK, WATER WORK, DETECTABLE WARNING FIELD INSTALLATIONS, ETC.; RG1515236321 – In West Highland Avenue/Boulevard from North 20th Street to North 35th Street ST216240113 – In West Highland Boulevard from North 27th Street to North 35th Street
12/03/2024 04:30 PM UTC
OFFICIAL NOTICE 107-1-2024
WP-346 Linnwood and Cameron Window Improvement Project Project to replace windows in the lab and administration areas of the Linnwood Water Treatment Plant and at the Cameron Meter Shop.
11/27/2024 04:30 PM UTC
191 - 200 of 1601 Solicitations
1 2 16 17 18 20 22 23 24 160 161